Wolf MGK-170 Technical Manual And Installation Instructions

Type
Technical Manual And Installation Instructions

This manual is also suitable for

Technical guide and
installation instructions
Gas condensing boilers
MGK-130
MGK-170
MGK-210
MGK-250
MGK-300
Document no. 3062880_0910 Subjecttotechnicalmodications
These installation instructions are to be retained by the user.
We cannot accept any warranty claims if these operating instructions have not been
observed.
GB
Wolf GmbH · Postfach 1380 · D-84048 Mainburg · Tel. +49-8751/74-0 · Fax +49-8751/741600 · Internet: www.wolf-heiztechnik.de
2
3062880_0910
Contents
Contents ................................................................................................. Page
Safetyinstructions ..........................................................................................3
Standardsandregulations...........................................................................4-5
Layout MGK....................................................................................................5
Specication ...................................................................................................6
Control/Function/Operation .....................................................................7-8
Deliveredcondition/Connections ..................................................................9
Installationinstructions/Dimensions ...................................................... 10-11
Dismantling,casing ......................................................................................12
Boilersystempipework.................................................................................13
Installation ...............................................................................................14-16
Installation,combustionairsupply/uesystem ..........................................17
Electricalconnection................................................................................17-21
Fillingthesystem/llingthesiphon .............................................................22
Checkingthegassupplypressure ...............................................................23
Commissioning/SettingtheBUSaddress...................................................24
Displaying/modifyingcontrolparameters....................................................25
Limitingthemaximumoutput........................................................................26
Changingthegastype/CO
2
settings ......................................................27-29
Testingthecombustionparameters..............................................................30
Commissioningreport...................................................................................31
Technicalinformation,watertreatment .........................................................32
Systemlog ....................................................................................................33
Engineeringdata ..........................................................................................34
Functiondescription/Systemengineering..............................................35-36
Technicalinformation,connectiononthewaterside ....................................37
Engineeringinformation,combustionair/uegasrouting......................38-44
WiringdiagramMGK-130 .............................................................................45
WiringdiagramMGK-170-300 ......................................................................46
Troubleshooting ............................................................................................47
Resistancetable ...........................................................................................48
Keywordindex .........................................................................................49-51
ECdeclarationofconformity ........................................................................52
3
3062880_0910
The following symbols and references are used
in conjunction with these important instructions
concerning personal safety, as well as operational
reliability.
"Safety instructions" are instructions with
which you must comply exactly, to prevent
risks and injuries to individuals and material
losses on the boiler.
Danger from 'live' electrical components!
NB: Switch OFF the ON/OFF switch
before removing the casing.
Never touch electrical components or
contacts when the ON/OFF switch is in
the ON position! This results in a risk of
electrocution that may lead to injury or
death.
The main supply terminals are 'live' even
when the ON/OFF switch is in the OFF
position.
"NB" indicates technical instructions that
you must observe to prevent material losses
and malfunctions on the boiler.
NB
Safety instructions
Fig.:GascombinationvalveMGK-170/210/250/300
Dangerfromelectricalvoltage
Escapinggasmaycausepoisoningortheriskofexplosion
Fig.:Ignitiontransformer,highvoltageignitionelectrode,
combustionchamber
Dangerfrom'live'electricalcomponents,riskofburning
throughhotcomponents
Fig.:JunctionboxMGK-170/210/250/300
Dangerfromelectricalvoltage
4
3062880_0910
Note: Please read these instructions carefully before
the installation and keep them in a safe place.
Please also note the technical information in
the appendix.
Requirements
Theinstallationoftheboilermustbeinaccordancewiththe
relevant requirements of Gas Safety (Installation and Use)
Regulations1998,HealthandSafetyDocumentNo.635(The
ElectricityatWorkRegulations1989),BS7671(IEEWiring
Regulations)andtheWaterSupply(WaterFitting)Regulations
1999,orTheWaterBylaws 2000 (Scotland).Itshould also
beinaccordancewiththerelevantrequirementsoftheLocal
Authority, Building Regulations, including amendments to
theApproved Documents Part L and J 2002, The Building
Regulations(Scotland),TheBuilding Regulations (Northern
Ireland)andthe relevant recommendationsofthe following
BritishStandards:
BS5440: Flues and ventilation of gas red boilers not
exceeding70kWnet:
- Part1:Flues
- Part2:Ventilation
BS5449: Specicationforforcedcirculationhotwaterfor
domesticpremises.
BS5546: Specification for gas hot water supplies for
domesticpremises.
BS6700: Servicessupplyingwaterfordomesticusewithin
buildingsandtheircurtilages.
BS6798: Specicationforinstallationofgasredboilers
notexceeding60kWinput.
BS6891: Specicationforinstallationoflowpressuregas
pipeworkupto28mm(R1")indomesticpremises
(2
nd
familygas).
BS7593: Treatmentofwaterindomestichotwatercentral
heatingsystems.
InstituteofGasEngineersPublicationIGE/UP/7/1998:
"Guideforgasinstallationsintimberframedhousing"
Important:Theappliancemustbeinstalledandservicedby
acompetentpersonasstatedintheGasSafety(Installation
and Use) Regulations 1998. In IE, the installation must be
inaccordancewith the current editionofI.S,813 "Domestic
Gas Installations", the current Building Regulations and
referenceshouldbemadetothecurrentECIrulesforelectrical
installation.
Whentighteningorlooseningthreadedconnectionsalwaysuse
suitableopen-endedspanners(notpipewrench,orextensions,
etc.).Incorrectuseand/orunsuitabletoolscanleadtodamage
(e.g.gasorwaterleaks)!
Any damage or loss resulting from technical
modications to the control unit or to the control
componentsareexcludedfromourliability.
Incorrectusecanleadtoarisktolifeandlimbor
toariskofmateriallosses.
Obtain the permission of your mains gas supplier and ue
gas inspector prior to the installation of Wolf gas red
boilers [where appropriate].
Wolfgasredboilersmustonlybeinstalledbyarecognised
heating contractor. This heating contractor will also be
responsiblefortheproperinstallationandcommissioningof
theheatingsystem.
The following regulations, rules and guidelines must be
observedduringinstallation:
- VDE0722/EN50165 El ectrica l equip m e nt of heat
generators with non-electrical
heatingsystems
- DINEN12828 Heating systems in buildings,
de s ign i ng hot wat e r he ati n g
systems
-EN60335-1 Safety of electrical equipment for
domesticuseandsimilarpurposes
- VDE0470/EN60529Protectionthroughhousings
- EN12831 Methodforcalculationofthedesign
heat load
- EN13384 Chimneys - Thermal and fluid
dynamic calculation method
Standards and regulations
5
3062880_0910
Gas condensing boiler MGK-...
GascondensingboilersaccordingtoEN437/EN483
/ EN 677 and EU 90/396/EEC (Gas Consumer
Equipment), 92/42/EEC (Efficiency Directive),
2006/95/EC(LowVoltageDirective),and2004/108/EC
(EMCDirective),withelectronicignitionandelectronic
ue gas temperature monitoring, for low temperature
heatingandDHWheatinginheatingsystemswithow
temperaturesupto90°Cand6barpermissiblepressure
accordingtoEN12828.
Standards and regulations /
Layout MGK
Open flue g as c onde nsing bo ilers
must only be installed in a room which
complies with the appropriate ventilation
requirements. Otherwise there is a risk
of asphyxiation or poisoning. Read these
installation and maintenance instructions
before installing the boiler. Also take the
technical engineering information into
consideration.
Fig.:Wolfgascondensingboiler
Flueoutletwithtest
nipple
Heatexchangeras
asectionaldesign
Flowconnection
Returnconnection
High limit safety cut-out
insidethesensorwell
Gasconnection
Ignitionelectrode
Ionisationelectrode
Gasfan
Mixingchamber
Cylinderburner
Flowsensor
Gascombinationvalve
withgaspressurelimiter
Returnsensor
Waterpressureswitch
Ventilationpipe
Drainvalve
Siphon
Fluegas
temperatureswitch
Flue gas pressure
switch
Ventilationair
aperture
Layout MGK
6
3062880_0910
Specication
Type MGK 130 170 210 250 300
Ratedoutputat80/60°C kW 117 156 194 233 275
Ratedoutputat50/30°C kW 126 167 208 250 294
Rated heat input kW 120 160 200 240 280
Lowboileroutput(modul.)at80/60°C kW 23 27 34 39 45
Lowboileroutput(modul.)at50/30°C kW 24 30 37 44 49
Lowheatinput(modulating) kW 23 28 35 41 46
Heatinputmodulationrange % 19-100 17-100 17-100 17-100 17-100
Height A mm 1300 1300 1300 1300 1300
Width B mm 995 1355 1355 1355 1355
Depth C mm 600 600 600 600 600
Fluediameter mm 160 160 160 160 200
Combustionairsupply mm 160 160 160 160 160
Heatingowoutsidediameter G 1½" 2" 2" 2" 2"
Heatingreturnoutsidediameter G 1½" 2" 2" 2" 2"
Gasconnection R 1" 1½" 1½" 1½" 1½"
Balanceduerouting Type
B23,B33
C33,C43
C53,C63
C83
B23,B33
C33,C43
C53,C63
C83
B23,B33
C33,C43
C53,C63
C83
B23,B33
C33,C43
C53,C63
C83
B23,B33
C33,C43
C53,C63
C83
Gascategory II
2H3P
II
2H3P
II
2H3P
II
2H3P
II
2H3P
Gassupplydetails:
Naturalgas H(H
i
=9.5kWh/m³=34.2MJ/m³)
m³/h 13.1 16.8 21 25.2 29.4
LPGP(H
i
=12.8kWh/kg=46.1MJ/kg)
1)
kg/h 9.7 12.5 15.6 18.7 21.8
Gassupplypressure: NaturalgasE/LL mbar 20 20 20 20 20
LPGP mbar 50 50 50 50 50
Watercapacity,heatingwaterheatexchanger l 12 15.4 16 20 22
Max.permissibleboilerpressure bar 6 6 6 6 6
Max.permissibleowtemperature °C 90 90 90 90 90
Availablegasfandraught Pa 10-200 10-150 10-150 10-150 10-150
Fluegastemperature80/60-50/30atQ
max
°C 65-45 65-45 65-45 65-45 65-45
Fluegastemperature80/60-50/30atQ
min
°C 55-35 55-35 55-35 55-35 55-35
Fluegasmassowrate
g/s 56.7 72.6 90.8 108.9 127.1
FluegasgroupaccordingtoDVGWG635 G52 G52 G52 G52 G52
Pressuredrop,heatingwater mbar 95 100 115 135 160
Electricalconnection V~/Hz 230/50 230/50 230/50 230/50 230/50
Integralfuse(mediumslow) A 5 5 5 5 5
Powerconsumption W 30-200 45-280 45-280 45-280 45-280
Protection
IP40D IP40D IP40D IP40D IP40D
Soundpressurelevelinsidetheinstallation
roomatfullload
1)
dB(A) <54 <54 <54 <54 <54
Totalweight(dry) kg 195 250 271 292 313
Condensatevolumeat40/30°C l/h 12 16 20 24 28
CondensatepHvalue approx.4.0 approx.4.0 approx.4.0 approx.4.0 approx.4.0
CE ID 0085BR0117 0063BQ3805 0063BQ3805 0063BQ3805 0063BQ3805
1)
Thisvalueisdependentonthegeneralsystemconditions,suchas:Type/versionoftheuesystem,sizeandnatureoftheinstallationroom
7
3062880_0910
Control / Function / Operation
ON/OFF switch
ThecondensingboilerisOFFinposition0.
ON/OFFswitch
DHWtemperature
selector
Reset
button
Heatingwater
temperatureselector
Illuminatedring
Thermometer
Reset
Afaultisresetbypressingtheresetbuttonwhichwillalsorestartthesystem.
Pressingtheresetbuttonre-activatesthesystem,iftherewasnofault.
Illuminated status indicator ring
DHW temperature selection (onlywith3-wayvalve)
WhengascondensingboilersarecombinedwithaDHWcylinder,setting1-9
corresponds to a cylinder temperature of 15-65 °C.The DHW temperature
selectorsettingbecomesineffectivewhenthesystemiscombinedwithadigital
roomthermostatoraweather-compensatedcontroller.Thetemperaturewill
thenbeselectedatthecontroller(accessory).
9
1
2
8
3
7
4
6
5
Heating water temperature selection
Settings2-8correspond,whenfactory-set,toaheatingwatertemperatureof
20-85°C.Theheatingwaterthermostatsettingbecomesineffectivewhenthe
systemiscombinedwithadigitalroomthermostatoraweather-compensated
controller.
2
8
3
7
4
6
5
Display Explanation
Flashing
green
Standby
(powersupplyON,noheatdemand)
Constant
greenlight
Heatdemand:Pumprunning;
burnerOFF
Flashing
yellow
Emissionstestmode
Constant
yellowlight
BurnerON;amesteady
Flashingred Fault
8
3062880_0910
Control / Function / Operation
Settings
Anti-seizing pump protection
In summer mode, any connected circulation pump operates for approx. 30
secondsafteramaximumidleperiodof24hours.
Note:
Thenumberoftimesthecondensingboilercanbestartedinheatingmodeis
limitedelectronically.Thislimitcanbebypassedbypressingtheresetbutton.
Then, the boiler starts immediately, as soon as a heat demand has been
Winter mode(position2to8)
Inwintermode,theboilerheatstheheatingwatertothetemperatureselected
atthe heating watercontroller.According to thepump operating mode,the
circulationpumpoperatesconstantly(factorysetting)oronlyinparallelwith
theburneractivation/run-onperiod.
Summer mode
Wintermodeis disabledbyrotating theheatingwater temperatureselector
intoposition .Inotherwords,theboilerwillthenoperateinsummermode.
Summermode(heatingOFF)meansonlyDHWheating.Frostprotectionforthe
heatingsystemandpumpanti-seizingprotection,however,remainenabled.
Thermometer
Thecurrentheatingowtemperatureisdisplayed.
°C
0 120
bar
04
2
13
Emissions test mode
Theemissionstestmodeisactivatedbyrotatingtheheatingwatertemperature
selectorintoposition
.Theindicatorringashesyellow.Aftertheemissions
testmodehasbeenactivated,theboilerwillheatwiththesetmaximumoutput.
Anypreviouscycleblockwillbecancelled.Theemissionstestmodeterminates
after15minutesorwhenthemaximumowtemperaturehasbeenexceeded.
Toreactivate,turntheheatingwatertemperatureselectoranti-clockwiseand
thenbackintoposition
.
9
3062880_0910
Delivered condition / Connections
Delivered condition
Thestandarddeliveryincludes:
1 Gascondensingboiler,fullywired
1 Technicalguideandinstallationinstructions
1 Operatinginstructions
4 Liftingslings
Connections
Flueoutletwith
integraltestnipple
Ø160/Ø200
HeatingreturnHeatingow
Gasconnection
Combu stion air
supply*Ø160
Cableinlet24V
Powercableinlet230V
Condensatedrain
connection
Condensatedrain
connection(optional)
Grommet
Condensatehose
*Connectionforbalancedueoperationwithventilationairadaptor(accessory)
10
3062880_0910
Recommended minimum wall clearances
Theboilercanbepositionedclosetothewall,bothat
itsbackanditsleftside.
On the right side, a clearance of at least 500 mm is
requiredtoenabletheburnerremovalandinstallation.
Anadequateamountofspacemustalsobeprovidedin
frontoftheboilertoenablecleaningandservice.
Installation instructions
General tips regarding location
• Theboilershouldbeinstalledonalevelsurfacewhich
issubstantialenoughtocarryitsweight.
• Theboilermustbelevel(levelwithadjustablefeet).
Theboilermustonlybeinstalledinaroomthat
isprotectedfromfrost.
Draintheboilerandtheentireheatingsystemif
thereisariskoffrost,whenthesystemhasbeen
shutdown,topreventpipesfrombursting.
Boilersshouldnotbeinstalledinareassubject
to aggressive vapours, very dusty or highly
humidconditions(workshops,laundryrooms,
hobbyroomsetc.).Thispreventstheoptimum
burnerfunctionfrombeingachieved.
Thecombustionairsuppliedtotheboilermust
befreefromhalogenatedhydrocarbons(e.g.
as contained in sprays, solvents, cleaning
uids,paintsandadhesives).Underthemost
unfavourable conditions, these may lead to
pitting of the boiler and even the ue gas
system.
Never store or use combustible material or
liquidsneartheboiler.
The ventilation air supply must be ensured
and comply with local regulations or those
relating to gas installations. When there is
an insufcient supply of ventilation air, ue
gas can escape leading to a risk to life
(poisoning/asphyxiation).
Prior to commissioning, ensure with the
appropriateauthorities,whetheraneutralising
systemforcondensateisrequired.
NB
NB
2boilersintheinstallationroom,backtoback
2boilersintheinstallationroom
2-4boilersintheinstallationroom,sidebyside
Boilerintheinstallationroom
Dim. B MGK-130 995 mm
Dim. B MGK-170/210/250/300 1355 mm
11
3062880_0910
Installation information / Dimensions
Levelling the boiler with the adjustable feet
Atthefactorytheboilerisequippedwithfouradjustable
feet.
• Leveltheboilerwiththeadjustablefeet,spannersize
13).
Fig.:Feet
Fig.:Liftingeyesforliftingslings
Liftingeyesforliftingslings
Transportation into the installation room
Toeasethe transportationintothe boilerroom,lifting
slingsaresuppliedwiththeboiler.
Neverusesacktrucks.
NB
Dimensions
Fig.:Connectiondimensions
MGK-130
MGK-170/210/250/300
Fig.:Dimensions
(Totalheightincl.connector
MGK-130 ... 250 = 1460 mm
MGK-300=1510mm)
12
3062880_0910
Dismantling, casing
Dismantling the casing
Fig.:Dismantlingthefrontandsidecasing
13
3062880_0910
Boiler system pipework
Heating system ow and return are at the top of the
boiler. For connections,see Fig.Always provide shut
offvalvesfortheowandthereturn.
Installacheckvalvedownstreamoftheheatingcircuit
pump(s)topreventincorrectcirculation.
Fornewsystems werecommendthe installationofa
blow-downtank(alternativelyadirtlter)intothereturn.
Foroldersystemsthisinstallationiscompulsory.
Installasafetyassemblycomprisingasafety
valve with a response pressure of 6 bar, a
pressure gauge and an automatic air vent
valve.
The line between the boiler and the safety
valvemustnotbeabletobeshutoff.Severely
excessive boiler pressure due to excessive
boilerwatertemperatures,canbursttheboiler
body or the boiler pipework, which would
leadtoasuddenescapeofhotwater(risk of
scalding).
Heatingreturn
Heatingow
Fig.:Heatingconnections
Providesystemseparationbymeansofaheat
exchanger, when using pipes which are not
impermeabletooxygen.
Thisboilerisonlysuitableforheatingsystems
with pumped heating circuits. If no heating
circuit pump has been installed, sufcient
circulation through the radiators cannot be
ensured,sothattheroomheatingcannotbe
guaranteed.
NB
The MGK is supplied without circulation pump. The
pump rate of the pump to be installed on site must
be determined subject to the system and boiler
pressure drop. Switching via the MGK (see electrical
connections).
14
3062880_0910
Installation
Theminimumsystempressureis1.0bar.
Thegascondensingboilersareapprovedexclusivelyfor
sealedunventedsystemsupto6bar.Themaximumow
temperatureisfactory-setto85°Candmaybeadjusted
to90°Cifrequired.Generally,theowtemperatureis
80°CforDHWoperation.
Thereisnoneedforaminimumthroughputatmaximum
owtemperaturesbelow85°C.
Safety equipment
Information on scaling
Scalingcanbestronglyinuencedparticularlythrough
themethodofcommissioning.Heatthesystematthe
lowestoutputwithanevenandadequatethroughput.For
multi-boilersystemsitisrecommendedtocommission
allboilerssimultaneouslytopreventtheoverallamount
oflimeconcentratingontheheatexchangersurfaceof
anindividualboiler.
Note:
Provideadrain&llvalveatthelowestsystempoint.
Before commissioning, all hydraulic pipes
must undergo a tightness test:
Test pressure on heating water side max. 9
bar.
Domestichotwatermaybeusedasllwaterandtop-
upwater.
Thoroughlyushthesystempriortollingwithwater.
Theuseofchemicaladditivesandsofteningusingsingle-
stageionexchangersisnotpermissible.
The design information for water treatment
must be observed, otherwise system damage
due to water leaks may occur.
Wolfdoesnotassumeliabilityfor anydamage tothe
heat exchanger caused by oxygen diffusion in the
heatingwater. Intheevent ofoxygenpenetrating the
system,we recommenda systemseparation through
theinterconnectionofaheatexchanger.
Inthecaseofsystemswithlargevolumesofwaterand
thosewherelargevolumesoftop-upwater(e.g.through
waterlosses)arerequired,observetherelevantlocal
regulationsregardingthepreventionofdamageinhot
waterheatingsystemsthroughscalingandcorrosion.
Keep a system log (see technical information
regarding water treatment and commissioning
report).
Note:
Check with Wolf regarding suitable water treatment
measures.
Heating water
15
3062880_0910
Installation
Fig.:Siphon
Siphon
Condensate connection
Fillthesiphonwithwaterpriortocommissioning.
Otherwisethereisariskofuegasescaping.
Whenroutingcondensateintothepublicsewersystem,
observelocalregulations.Ifcondensateisdirectlyrouted
tothepublicsewer,ensureventilation,sothatthepublic
sewercannotaffectthecondensingboiler.
Use only plastic for all condensate drain
pipes.
NB
Neutralising system (accessory)
Theneutralisingsystemcanbeconnecteddirectlytothe
appliance.Consumptionapprox.10-30g/kWp.a.
Observetheassociatedinstructions.
Trim the connection hoses, so that
- the condensate can drain fully
- backup loops are prevented
- a perfect seal is ensured.
NB
Fig.:Neutralisingsystem(accessory)
Condensate drain, single boiler systems
WheninstallingtheMGKasanindividualappliance,ta
condensatedrain(DN160-partno.2651341,DN200
-partno.2651389).
Theconnectionsofthecondensatesourcecanbejoined
withthe"Condensatehoseset"(partno.8905844)and
canbeconnectedtotheneutralisingsystem.
Fig.:Condensatehose
16
3062880_0910
Installation
• Priortoinstallation,ensurethattheboilerissettotheavailablegastype.
At the factory, the boiler is set up for natural gas H 15.0:
Ws = 11.4 - 15.2 kWh/m
3
= 40.9 - 54.7 MJ/m
3
 Whenchangingthegastype,settheapplianceinaccordancewithchapter"Changingthegastype/CO
2
settings".
• Onlycommissiontheappliancewhentheratedsupplypressurehasbeenreached.
Gas connection
Routingthegaspipeaswellasmakingthegasconnectionsmustonlybecarriedoutbyalicensedgas
tter.
Removeallresiduesfromtheheatingpipeworkandthegaslinepriortoconnectingthecondensingboiler,
particularlyinoldersystems.
Priortocommissioning,testallpipeandgasconnectionsforleaks.
Inappropriateinstallationorusingunsuitablecomponentsorassembliesmayleadtogasescaping,which
resultsinariskofpoisoningandexplosion.
Install a gas ball valve with re protection in the gas supply line upstream of the Wolf condensing
boiler. Otherwise explosions may occur duringare. Size the gas supply line in accordance withlocal
regulations.
Check the gas line for tightness without the boiler.
Never release the test pressure via the gas valve.
Gas ttings on the appliance may be pressure tested to 150 mbar. Higher pressure may damage the
gas train, resulting in a risk of explosion, asphyxiation or poisoning.
Close the gas ball valve on the gas condensing boiler to pressure test the gas line.
Mount the gas ball valve in an easily accessible place.
Connection of a Wolf cylinder,
solar cylinder SEM or third party cylinder
WerecommendtheMMorKMcontrollersfromtherangeofWolfaccessoriesforoptimumswitchingofheatingcircuit
andcylinderprimarypumps.
Whensizingthecylinderensurethatthelowestconstantcylinderoutputcorrespondsatleasttothelowest
heatinputfromtheboiler.Asolarcylinder(withoutsolarthermalsystem)canbeconnectedtoincreasethe
constantDHWoutput.Forthis,bothinternalindirectcoilsneedtoreceiveavolumeowinseries.Otherwise
itcannotbeassuredthatthecylinderwillbefullyheatedup.
Condensateliftingsystem(accessory)
Condensate lifting system (accessory)
TheWolfcondensate liftingsystem is fully wired and
canbeintegratedintotheMGK.Thepowersupplyand
thealarm outputof thecondensate liftingsystem are
connectedtotheboilercontrolunit.
6 m PVC hose for draining off the condensate is
included.
17
3062880_0910
Installation, combustion air supply / ue system
/ electrical connection
Only use original Wolf components or
CE-designated ue systems to create ue
lines.
Observe the technical information regarding
ventilation air supply / ue systems prior
to installing the ue or the ventilation air
connection.
Differentcountrieshavedifferentregulations.
Wewouldthereforerecommendyoucontact
theappropriateauthoritiesincludingthelocal
uegasinspector,tochecklocalrequirements
priortotheboilerinstallation.
NB
With low outside temperatures, the water
vapourcontainedintheuegasmaycondense
andformiceontheue.Useon-sitemeasures
topreventicefromfalling,e.g.theinstallation
ofasnowcatchergrille.
The boiler power supply terminals are
'live' even when the ON/OFF switch has
been switched OFF.
General information, electrical connection
The installation must be carried out by a
licensed electrical contractor. Observe
local electrical regulations and those of
the local power supply utility.
Fig.:ControlunitMGK-170/210/250/300
24VControlunit 230VJunctionbox
Do not route sensor leads with 230 V
mains cables.
Flue
Fig.:Example:Ventilationair/uesystem
Combustionair
Integraltest
nipplefor
checkingthe
uegas
18
3062880_0910
Electrical connection
Isolate the gas condensing boiler from
the power supply before changing a
fuse. The ON/OFF switch on the boiler
does not provide separation from the
power supply.
Danger through 'live' electrical
components. Never touch electrical
components or contacts as long as the
gas condensing boiler has not been
isolated from the power supply. Risk
to life.
Changing a fuse
Fig.:Terminalboxcoveropen
Fuse
Installation information, electrical connection,
mains
- Isolate the system from the power supply before
opening.
- Opentheterminalbox.
- Insertthestrainreliefintotheholesprovided.
- Stripapprox.70mminsulationoffthepowercable.
- Pushthecablethroughthestrainreliefandsecure
thestrainrelief.
- PullofftheRast5plug.
- Terminatethe appropriatecoresattheRast5 plug.
Leavethecoresfortheearthconductorgr/yeapprox.
10mmlongerthanthoseforLandN.
- Pushtheinsertsbackintotheterminalboxcasing.
- Push the Rast5 plugs back into their correct
positions.
Fig.:Junctionbox
Fuse5A(fast)
Rast5plug
Strainrelief
Terminal box
Thecontrol,regulatingandsafetyequipmentarefully
wiredandtested.
You only need to connect the power supply and the
externalaccessories.
Power supply
Createapermanentconnectionforthepowersupply.
Providethepowersupplyviaamainisolator(heating
system emergency stop switch) that ensures at least
3mmcontactseparationforallpoles.
Power cable, exible, 3 x 1.0 mm² or rigid, up to
3x1.5mm².
Powersupply
230V
AC/50Hz
Powersupply,heatingcircuit
pump230VAC/50Hz/max.
400VA
Programmable
output
230V
AC/50Hz
Programmable
input,oating
Outside
temperature
sensor
BUS
(Controller,radioclock,AFwith
radioclock,receiver,outside
radiosensor)
19
3062880_0910
Fig.:Connection,heatingcircuitpump
Heating circuit pump connection (230 V AC; max.
400 VA)
Insertthecableglandsintotheterminalbox.Insert
andsecurethecablethroughthecableentry.
Connecttheheatingcircuitpump230VACtoterminals
L1,Nand
.
Electrical connection
Wiring diagram, ventilation air damper
(not for MGK-130)
Schaltplan r
Zuluftklappe
MGK 170-250
1
von1
AFE1
eBUS
+
-
12ab
Netz
Z A1
N
N
NL1
L1 L1
o ooooo
MT
3,15 A
F1
12 12
12
L1
N
L1L1
N
N
L1
N
L1
N
Supply air damper
with servomotor
Elektroanschlußkasten
MGK
24VDC
Limit switch
NB:
Limit switch for supply air damper must
be floating!
Otherwise the MGK control unit will be
destroyed.
Note:
The contractor parameter
(input 1)
(factory setting for supply air damper) and
(input 1)
(factory setting for supply air damper)
With the contact open, the burner remains
blocked for DHW and central heating, even
for emissions test and frost protection.
HG13/GB13must be set to 5
HG14/GB14must be set to 7
Power supply
230 V AC
br
bl
M
230V~
51-10-018-045
Benennung
Zeichnungsnummer
CorelDraw
Art.-/Materialnummer
Blatt
Bl.
NameName Ausg.Ausg.ÄnderungÄnderung AntragAntrag DatumDatum
TerminalboxMGK
5 A
20
3062880_0910
Electrical connection
Code Explanation
0 No function
OutputA1isnotswitched
1 DHW circulation pump 100%
OutputA1isswitchedbycontrolaccessory(BM)ifDHWcirculationhasbeenenabled.OutputA1isconstantly
activatedwhennoaccessorycontrollerisinstalled.
2 DHW circulation pump 50%
OutputA1isswitchedbycontrolaccessories(BM)incyclesifDHWcirculationhasbeenenabled.5minutesONand
5minutesOFF.OutputA1isconstantlycycledin5minuteintervalswhennoaccessorycontrollerisinstalled.
3 DHW circulation pump 20%
OutputA1isswitchedbycontrolaccessories(BM)incyclesifDHWcirculationhasbeenenabled.2minutesONand
8minutesOFF.OutputA1cyclesconstantlywhennoaccessorycontrollerisinstalled.
4 Alarm output
OutputA1isswitchedafterafaultandafterexpiryof4minutes.
5 Flame detector
OutputA1isswitchedafteraamehasbeendetected.
6 3-way valve
OutputA1isswitchedduringcylinderheating.
7 Ventilation damper
OutputA1isswitchedrstpriortoeachburnerstart.Theburnerwill,however,onlybeenabledafterinputE1has
beenclosed.
Important:Inanycase,inputE1mustalsobeprogrammedas"Ventilationdamper"
ThefeedbacktoinputE1mustbemadewithaoatingcontact.Otherwise,useanon-siterelayforpotential
separation.
8 External ventilation
OutputA1isswitchedinversetothegascombinationvalve.
SwitchingOFFexternalventilation(e.g.extractorfan)duringburneroperationisonlyrequired,iftheboileris
operatedasanopenuesystem.
9 External gas valve
OutputA1isswitchedinparalleltothegascombinationvalve.
The functionsofoutputA1canbescannedandadjustedwitheBUS-enabledWolfcontrolaccessories.Thefollowing
functionscanbeallocatedtooutputA1:
Fig.:ConnectionoutputA1
Connection output A1 (230 V AC; 200 VA)
Insertthecableglandsintotheterminalbox.Insertand
securetheconnectingcablethroughthecablegland.
TerminatetheconnectingcableatterminalsL1,Nand
.
The parameters for output A1 are described in the
table.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52

Wolf MGK-170 Technical Manual And Installation Instructions

Type
Technical Manual And Installation Instructions
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI