Wolf CGB-75 Installation And Operating Instructions Manual

Category
Water heaters & boilers
Type
Installation And Operating Instructions Manual

This manual is also suitable for

WOLF GMBH / POSTFACH 1380 / D-84048 MAINBURG / TEL. +49.0.87 51 74- 0 / FAX +49.0.87 51 74- 16 00 / www.WOLF.eu
Doc. no.: 3062555_201804 Subjecttomodications
GB
Installationandoperatinginstructions
Wall mounted gas condensing boiler
CGB wall mounted gas condensing boiler
CGB-75
CGB-100
2 3062555_201804
Tableofcontents
1. Documentation information ................................................................3
2. Safety information ..............................................................................4
3. Standards and regulations .................................................................7
4. Control / Function / Operation ........................................................10
5. Delivered condition / standard delivery ............................................12
6. Layout ..............................................................................................13
7. Siting instructions ............................................................................14
8. Installation .......................................................................................15
9. Dimensions/installation dimensions .................................................16
Installation
10. Installation .......................................................................................17
11. Installation of the air/flue gas routing ...............................................21
Control
12. Electrical connection ........................................................................22
Commissioning
13. Filling the system .............................................................................28
14. Conversion to natural gas E/LL (G20/G25) (if necessary) ...............29
15. Conversion to LPG P (G31) (if necessary) ......................................30
16. Conversion to other gas types (if required) .....................................31
17. Checking the gas supply pressure ..................................................32
18. Commissioning / setting the BUS address ......................................33
19. Displaying / modifying control parameters .......................................34
20. Adjusting the modulating pump (accessory) ....................................35
21. Limiting the maximum output ...........................................................36
22. Testing the combustion parameters .................................................37
23. CO
2
adjustments .............................................................................38
24. Commissioning report ......................................................................40
Specication
25. Maintenance and design data .........................................................41
26. Technical information for water treatment ........................................43
27. System log .......................................................................................45
28. Technical information .......................................................................46
29. Wiring diagram ................................................................................56
30. Specification ....................................................................................57
31. Troubleshooting ............................................................................... 58
32. Product datasheet to EU regulation No. 811/2013 ..........................60
33. Technical parameters to EU Regulation No. 813/2013 ....................61
34. Notes ...............................................................................................62
EU declaration of conformity ...................................................................63
33062555_201804
1. Documentationinformation
1.1 Otherapplicabledocuments
- Technical information
- Maintenance instructions
- System and operator’s log
The instructions for all accessory modules and other accessories also apply where
relevant.
1.2 Safekeepingofthesedocuments
The system user or operator should ensure the safekeeping of all instruction manuals
and documents.
► Handovertheseinstallationinstructionsaswellasallotherapplicablemanuals
to the system user or operator.
1.3 Instructingthesystemuser
- Instruct the system user to take out an inspection and maintenance contract with
an approved contractor.
- Inform the system use that the annual inspection and maintenance may only be
performed by an approved contractor.
- Inform the system use that repair work may only be performed by an approved
contractor.
- Inform the system user that only original spare parts may be used.
- Inform the system user that no technical changes may be made to the boiler or
control unit.
- Inform the system user that they are responsible for the safety, environmental com-
patibility and energy quality of the heating system (German Immission Control Act/
Energy Saving Ordinance) [Germany].
- Inform the system user that these instructions and the other applicable documents
must be kept in a safe place.
- Instruct the system user how to operate the heating system.
1.4 Applicabilityoftheseinstructions
These installation instructions apply to CGB-75/100 gas condensing boilers.
1.5 Acceptance
Within four weeks of commissioning of the burner the operator must notify the local
flue gas inspector accordingly. According to the Bundes-KÜO (German Federal
Sweeping and Inspection Act), tests and inspections are only required every 3 years
[Germany].
1.6 Recyclinganddisposal
- Old equipment may only be disconnected from the gas and electricity supply by a
qualiedcontractor.
- Always dispose of materials according to environmental, recycling and waste man-
agement standards.
- Old appliances, wearing parts, defective components and environmentally hazard-
ous liquids and oils must be disposed of or recycled according to applicable waste
disposal regulations without harming the environment.
Theymustnotbedisposedofashouseholdwaste.
- Disposeofpackagingmadeofcardboard,recyclableplasticsandsyntheticller
materials in an environmentally compatible manner through appropriate recycling
systems or a recycling centre.
- Please observe the applicable national and local regulations.
4 3062555_201804
2. Safetyinformation
Danger:ifyousmellgas
- Close the gas valve.
- Open the windows.
- Do not operate any electrical switches.
- Extinguish naked flames.
- From an external location, telephone the gas sup-
ply utility company and an approved contractor.
Danger:ifyousmelluegas
- Switch OFF the appliance.
- Open windows and doors.
- Notify an approved contractor.
Authorised personnel should read these instructions
beforeanyinstallation,commissioningorservicework.
Complywiththespecicationsinthisdocument.Failureto
observetheseinstallationinstructionsvoidsanywarranty
claimagainstWOLF.
Insomecountries,therelevantgassupplycompany
mustbenotiedoftheinstallationofagasboilerand
mustgivetheirapproval.
Pleasenotethatregionalpermitsmayberequiredfor
theuegassystemandconnectingthecondensate
draintothepublicsewer.
Beforestartinginstallationwork,thelocaluegasin-
spectorandwastewaterauthoritymustbeinformed.
Thegascondensingboilermustonlybeinstalled,commis-
sionedandservicedbyqualiedandtrainedpersonnel.
InaccordancewithVDE0105Part1,workonelectrical
components(e.g.controlunit)mayonlybecarried out
byqualiedelectricians.
VDE/ÖVE regulations [Germany/Austria] and those of
yourlocalpowersupplyutilitycompanyareapplicable
toelectricalinstallationwork.
Onlyoperatethegascondensingboilerwithintheoutput
range, which is stated in the technical documentation
suppliedby WOLF. Intendeduse of the boilerincludes
exclusiveuseforhotwaterheatingsystemsinaccordance
with DIN EN 12828.
Neverremove,bypassorotherwisedisableanysafetyor
monitoringequipment.Onlyoperatetheapplianceifitis
inperfecttechnicalcondition.
Anyfaultsordamagewhichimpactormightimpactsafety
mustberemediedimmediatelybyaqualiedcontractor.
Onlyreplacefaultycomponentsandequipmentwithorig-
inalWOLFspareparts.
Dangerfrom"live"electricalcomponents
Nevertouchelectricalcomponentsorcontacts
whentheON/OFFswitchisintheONposition.
Thereisadangerofelectrocution,resultingin
arisktohealthordeath.Themainterminalsare
'live',evenwhentheON/OFFswitchisintheOFF
position.
Riskofscalding
Boilersmaycontainhotwater.
Hotwatercancauseseverescalding.
Beforeworkingonpartswhichareincontact
withwater,allowtheappliancetocooltobelow
40°C,shutoffallvalvesand,ifnecessary,drain
theappliance.
Riskofburns
Boilercomponentsmaybeextremelyhot.
Hotcomponentscancauseburns.
Beforeworkingontheopenedupappliance,al-
lowittocoolbelow40°Corwearsuitablegloves.
Symbols
The following warning symbols are used in these instruc-
tions.
These relate to personal safety and operational reliability.
Instructions that must be followed precisely in order
to prevent risk and injury to persons.
Instructions that must be followed precisely in order
to prevent risk and injury to persons from live electri-
cal components.
Indicates technical instructions that must be
observed to prevent damage to the boiler and
malfunctions.
Note
53062555_201804
2. Safetyinformation
Risksfrompressurisedwater
Boilersaresubjecttohighwaterpressure.
Waterpressurecancausesevereinjuries.
Beforeworkingonpartswhichareincontact
withwater,allowtheappliancetocooltobelow
40°C,shutoffallvalvesand,ifnecessary,drain
theappliance.
Note:
Sensorscanbeincontactwithwaterandthere-
foreexposedtopressure.
Workingonthesystem
- Close the gas shut-off valve and secure it against uninten-
tional reopening.
- Isolate the system from the power supply (e.g. by remov-
ing a separate mains fuse or by means of a main switch
or a heating emergency stop switch) and check to ensure
there is no voltage.
- Safeguard the system against reconnection.
Inspectionandservice
- Ensure the correct operation of the gas boiler by having a
contractor carry out inspections at least once a year and
maintenance/repair when required.
- (DVGW - TRGI 2008 - G600).
We recommend arranging a suitable maintenance con-
tract.
- The operator is responsible for the safety, environmental
compatibility and energy quality of the heating system
(German Immission Control Act/Energy Saving Ordi-
nance) [Germany].
- Use only genuine WOLF spare parts.
6 3062555_201804
2. Safetyinformation
Fig.: Terminal box: Danger from electrical voltage
Fig.: Ignition transformer, high voltage ignition electrode, heat
exchanger
Danger from electrical voltage
Risk of burning through hot components
Fig.: Gas combination valve
Danger from electrical voltage
Escaping gas may cause poisoning or an explosion
Fig.: Gas connection
Escaping gas may cause poisoning or an explosion
73062555_201804
3. Standardsandregulations
Observeallstandardsandguidelinesapplicabletotheinstallationandopera-
tionofthisheatingsysteminyourcountry.
Observetheinformationontheboilertypeplate.
Thefollowinglocalregulationsmustbecompliedwithduringinstallationand
operationoftheheatingsystem:
Siting conditions
Ventilation and extract air facilities and connection to a chimney
Electrical connection to the power supply
Technical regulations of the gas supply utility company regarding the connection of
the gas appliance to the local gas mains
Regulations and standards regarding the safety equipment of the water heating
system
• DHWinstallation
Thefollowinggeneralregulations,rulesandguidelinesmustbeobservedfor
installationinparticular:
EN 806 Drinking water supply systems
(DIN) EN 1717 Protection against pollution of potable water in water installations
• EN12831Heatingsystemsinbuildings–Methodforcalculationofthedesignheat
load
• (DIN)EN12828Heatingsystemsinbuildings-Designofwater-basedheating
systems
• (DIN)EN13384Chimneys–Thermalanduiddynamiccalculationmethods
(DIN) EN 50156-1 (VDE 0116 Part 1) Electrical equipment in combustion systems
VDE 0470/EN 60529 Degrees of protection provided by enclosures (IP rating)
VDI 2035 Prevention of damage in hot water heating systems
- Scale formation (Sheet 1)
- Corrosion by water (Sheet 2)
-Corrosionbyuegases(Sheet3)
8 3062555_201804
3. Standardsandregulations
Weacceptnoliabilityforlossescausedbytechnicalmodicationsmade
tothecontrolunitorthecontrolsystemcomponents.
Improperusemaycausearisktolifeandlimbordamagetotheappli-
anceorotherproperty.
Requirements
The installation of the boiler must be in accordance with the relevant requirements
of Gas Safety (Installation and Use) Regulations 1998, Health and Safety
Document No. 635 (The Electricity at Work Regulations 1989), BS 7671 (IEE
Wiring Regulations) and the Water Supply (Water Fitting) Regulations 1999, or The
Water Bylaws 2000 (Scotland). It should also be in accordance with the relevant
requirements of the Local Authority, Building Regulations, including amendments to
the Approved Documents Part L and J 2002, The Building Regulations (Scotland),
The Building Regulations (Northern Ireland) and the relevant recommendations of
the following British Standards:
BS5440: Fluesandventilationofgasredboilersnotexceeding70kWnet:
- Part 1: Flues
- Part 2: Ventilation
BS5449: Specicationforforcedcirculationhotwaterfordomesticpremises.
BS5546: Specicationforforcedcirculationhotwaterfordomesticpremises.
BS 6700: Services supplying water for domestic use within buildings and their
curtilages.
BS6798: Specicationforinstallationofgasredboilersnotexceeding60kW
input.
BS6891: Specicationforinstallationoflowpressuregaspipeworkupto28mm
(R1") in domestic premises (2
nd
family gas).
BS 7593: Treatment of water in domestic hot water central heating systems.
Institute of Gas Engineers Publication IGE/UP/7/1998:
"Guide for gas installations in timber framed housing"
Important: The appliance must be installed and serviced by a competent person
as stated in the Gas Safety (Installation and Use) Regulations 1998. In IE, the
installation must be in accordance with the current edition of I.S,813 "Domestic
Gas Installations", the current Building Regulations and reference should be made
to the current ECI rules for electrical installation.
When tightening or loosening threaded connections always use suitable open-ended
spanners (not pipe wrench, or extensions, etc.). Incorrect use and/or unsuitable
tools can lead to damage (e.g. gas or water leaks)!
93062555_201804
3. Standardsandregulations
GascondensingboilerCGB-...
Gas condensing boiler to DIN EN 437 / DIN EN 13203-1 /
DIN EN 15502-1 / DIN EN 15502-2-1 / DIN EN 60335-1 /
DIN EN 60335-2-102 / DIN EN 62233 / DIN EN 61000-3-2 /
DIN EN 61000-3-3 / DIN EN 55014-1, as well as 92/42/
EWG (Efciency Directive) / 2016/426/EU (GasApplianc-
es Directive) / 2014/30/EU (EMC Directive) / 2014/35/
EU (Low Voltage Directive) / 2009/125/EG (ErP Directive) /
2011/65/EU (RoHS-Richtlinie) /Regulation (EU) 811/2013 /
Regulation (EU) 813/2013, with electronic ignition and elec-
tronicue gastemperature monitoring,for lowtemperature
heatingandDHWheatinginheatingsystemswithowtemper-
atures up to 90°C and 3 bar permissible operating pressure in
accordance with DIN EN 12828. This WOLF gas condensing
boiler is also approved for installation in garages.
Open ue gas condensing boilers must only
beinstalledinaroomwhichcomplieswiththe
appropriateventilationrequirements.Otherwise
there is a risk of asphyxiation or poisoning.
Readtheinstallationandmaintenanceinstruc-
tionsbeforeinstallingtheboiler.Alsotakeinto
considerationalltechnicalinformation.
WhenoperatingtheboilerwithLPG useonly
propaneaccording to DIN 51 622,otherwise
faults may arise when starting and operating
thegascondensingboiler,whichmayleadto
damagetotheapplianceandpersonalinjury.
ApoorlyventedLPGtankcanleadtoproblems
withignition.Insuchacase,contactthecom-
panythatllstheLPGtank.
Theadjustablecylinderwatertemperaturecan
exceed60°C.Forshorttermoperation above
60°Ctheboilermustbemonitoredinorderto
prevent scalding. For continuous operation,
appropriate precautions should be taken to
preventdraw-offtemperaturesabove60°C,e.g.
thermostaticvalves.
Fig.: Wolf gas condensing boiler
Toprotectagainstscaling,theDHWtemperatureshould
besettomax.50°Cifthetotalwaterhardnessis15°dH
(2.5 mol/m³) or above. Without an accessoryregulator,
thiscorrespondstoamaximumhotwaterrotaryselector
settingof6.Withatotalhardnessof20°dHorhigher,use
ofawatertreatmentfacilityinthecoldwatersupplyline
whenheatingDHWisnecessaryinordertoextendthe
maintenanceintervals.
Failuretotakesuchprecautionswillresultinpremature
scalingoftheapplianceandareductionintheconvenient
availabilityofdomestichotwater.Thecontractorrespon-
sibleshouldalwayscheckthelocalconditions.
10 3062555_201804
4. Control/Function/Operation
DHWtemperatureselection.
WhengascondensingboilersarecombinedwithaDHWcylinder,setting1-9corre-
spondstoacylindertemperatureof15-65°C.TheDHWtemperatureselectorsetting
becomes ineffective when the system is combined with a digital room thermostat or a
weather-compensated controller. The temperature will then be selected at the controller
(accessory).
Heatingwatertemperatureselection.
Settings 2 - 8 correspond, when factory-set, to a heating water temperature of 20-80 °C.
The heating water thermostat setting becomes ineffective when the system is combined
with a digital room thermostat or a weather-compensated controller.
ON/OFF switch
The condensing boiler is OFF in position 0.
Reset
A fault is reset by pressing the reset button which will also restart the system. Press-
ing the reset button re-activates the system, if there was no fault.
ON/OFF switch
ON/OFF
DHWtempera-
ture selector
Reset
button
Heatingwater
temperature
selector
Illuminated ring
Thermometer
Illuminatedringforstatusdisplay
Display Meaning
Flashing green Standby (power supply on; no heat demand)
Constant green light Heatdemand:pumprunning;burnerOFF
Flashing yellow Emissions test mode
Constant yellow light Burneron;amesteady
Flashing red Fault
113062555_201804
4. Control/Function/Operation
Note:
The number of times the condensing boiler can be started in heating mode is limited
electronically. This limit can be bypassed by pressing the reset button. Then, the boiler
starts immediately, as soon as there is a heating demand.
In summer mode, the circulation pump operates for approx. 30 seconds after a maxi-
mum idle period of 24 hours.
Anti-seizingpumpprotection
Setting
Wintermode (positions 2 to 8)
In winter mode, the boiler heats to the temperature selected at the heating water temper-
ature controller. According to the pump operating mode, the circulation pump operates
constantly (factory setting) or only in parallel with the burner activation / run-on period.
Summermode
Winter mode is disabled by rotating the heating water temperature selector into posi-
tion . In other words, the boiler will then operate in summer mode. Summer mode
(heatingOFF)meansonlyDHWheating.Frostprotectionfortheheatingsystemand
pump anti-seizing protection, however, remain enabled.
Emissionstestmode
The emissions test mode is activated by rotating the heating water temperature selector
into position
.Theilluminatedsignalringashesyellow.Aftertheemissionstestmode
has been activated, the boiler will heat with the selected maximum heating output. Any
previous cycle block will be cancelled. The emissions test mode terminates after 15
minutesorwhenthemaximumowtemperaturehasbeenexceeded.Toreactivate,turn
the heating water temperature selector anti-clockwise and then back into position
.
12 3062555_201804
5. Deliveredcondition/
standarddelivery
Deliveredcondition
Gascondensingboiler
The standard delivery includes:
1 Gascondensingboilerreadytoconnectwiththecasingtted
1 Mounting bracket for mounting on the wall, with installation
accessories
1 Installation instructions
1 Operating instructions
1 Maintenance instructions
1 Trap with hose
1 Maintenance tools
Accessories
The following accessories are required for installation of the
gas condensing centre:
- Balancedueaccessories(seetechnicalinformation)
- Room temperature-dependent or weather-compensated
control
- Condensate drain outlet with hose retainer
- Gasballvalvewithreprotection
- Fittingassemblyforheatingow,heatingreturnandintegral
safety assembly
- Pump assembly with variable speed pump and integral safety
assembly
- Low loss header set for one or two appliances in a cascade
- Dirtlterintheheatingreturn
Boilerconnections
Fig.: Connections with heating circuit connection set (accessory)
Heatingow
G 1½"
Gas connection
R ¾"
Heatingreturn
G 1½"
Condensate
drain
Heatingcircuitpumpassembly(accessory)
Fig.: Pump assembly (accessory)
Heatingow
G 2"
Heatingreturn
G 2"
Trap
Gas tap
Connection
Expansion vessel 1"
Drain&llvalve
Drain&llvalve
Pressure gauge
Safety valve
Modulating
pump
133062555_201804
CGB-75 / CGB-100
6. Layout
Quick-action air vent valve
Gas fan
Heatingwaterheat
exchangers
Condensate trap
Gas combination valve
Heatingreturn
Gas supply pipe
Flue gas temperature limiter
Combustion chamber casing
Return sensor
Combustion chamber
cover temperature limiter
Flue
Heatingow
Burner
Flow sensor
Temperature limiter
Flow
Intake pipe
Flue gas test point
Ventilation air test point
Gas:air mixing chamber
Flash trap
Displacement device
Water pressure switch
Gas restrictor
Monitoring electrode
Ignition electrode
Non-return valve
14 3062555_201804
First determine where the appliance is to be installed.
For this, take into account the ue gas connection, lateral
clearances towards walls and the ceiling, and any existing
connectionsforgas,heating,DHWandelectrics.
7. Sitinginstructions
Sound insulation: Under certain critical installation conditions
(e.g. installation on a drywall), additional measures may be
necessary to soundproof the boiler. In such conditions, use
anti-vibration rawl plugs and, if necessary, rubber mounts or
insulation strips.
When using a
low loss header set
Min. 830 mm
Min.
350 mm
Min.
350 mm
Electrical connection must be made on site.
Please maintain the 350 mm clearance to the ceiling to enable
inspection and maintenance work on the boiler to be carried
out, otherwise the necessary inspection and function tests
on components cannot be ensured during maintenance. The
drain hoses must be secured with the retainer above the drain
outlet (trap). The drain must be able to be easily inspected.
Theboilermaybeinstalledonlyinrooms
thatareprotectedfromfrost.
The temperature in the installation room must be be-
tween 0°C and 40°C.
Generalinformation
Clearancebetweentheboilerandcombustible
materials or components is not required, as
temperatureswillnotexceed85°Cattherated
boiler heating output. However, explosive or
readilyammablematerialsmustnotbeused
intheinstallationroomasthiswouldcreatea
riskofreorexplosion.
Duringboilerinstallation,ensurethatnocon-
taminants (e.g. drilling swarf) enter the gas
boiler,otherwisefaultsmaydevelop.
Note
Theinstallationroomandthecombustionair
supplied to the appliance must be free from
chemicals, e.g. uorine, chlorine or sulphur.
These substances are contained in sprays,
paints, adhesives, solvents and cleaning
agents.Underunfavourableconditions,these
mayleadtocorrosion,includingintheuegas
system.
153062555_201804
8. Installation
Initially, determine the location for the installation of the gas
condensing boiler.
For this, take into account the ue gas connection, lateral
clearances towards walls and the ceiling, and any existing
connectionsforgas,heating,DHWandelectrics.
Openingthecasingcover
We recommend you remove the casing cover during the
installation.
Release the casing cover with the l.h. and r.h. screw. Release
the bottom of the casing cover and unhook at the top.
Securingtheappliancewiththesuspensionbracket
Duringinstallationofthegascondensingboiler,
ensurethatallxingsarestrongenoughtocarry
itsweight.Alsotakeintoaccountthecondition
ofthewall,asanescapeofgasorwatermight
resultinariskofexplosionandooding.
Screws
Fig.: Undoing screws
Fig.: Drill holes for suspension bracket
Min. 446 mm
Ceiling
- Mark the holes to be drilled for the mounting bracket, taking
into consideration the minimum clearances.
-Inserttherawlplugsandtthemountingbracketwiththe
coach bolts and washers supplied.
- Hookthegascondensingboilerwiththemountingstaysinto
the mounting bracket.
Mounting stay
Fig.: Mounting brace on the condensing boiler
Aftercompletingservicing,closethefrontcasing
againandfastenthescrewstightly.Thereisa
riskofcarbonmonoxidepoisoningiftheue
systemisfaulty.
16 3062555_201804
9. Dimensions/installationdimensions
1 Heatingow
2 Heatingreturn
3 Condensate drain
4 Gas connection
min. 2200
830
138
Overpressure cascade DN 160 with low loss
header set
Ø 160/110
132,5
23
125 112,5 105 90
565
12,5
108 108350
104
236
925
96
1 4
173062555_201804
10.Installation
Heatingcircuitconnectionset
We recommend you connect the heating system with the aid
of a heating circuit connection set.
Connection set comprising: Connection to the appliance with
atgasket,connectiontoheatingow/returnwithballvalves
1" female thread.
Note:
Provideadrain&llvalveatthelowestpointinthesystem.
Fig.:Heatingcircuitconnectionset(accessory)
Fig.: Pump assembly (accessory)
TheCGB-75andCGB-100havenotbeenttedwithanex-
pansionvesselat the factory.Thismust bettedexternally
(available from the Wolf accessories range). The expansion
vesselmustbesizedsufciently,inaccordancewithDIN4807.
Theremustbenoshut-offvalve between the
expansion vessel and the condensingboiler,
otherwisethepressurebuild-upwouldperma-
nentlydamagetheboilerduringheating.There
isariskofsystemcomponentsrupturing,giving
risetoariskofscalding.
Thisdoesnotincludebutteryvalvesupstreamoftheexpan-
sionvessel.The pumpor tting assemblyincludes a 3bar
safety valve (6 bar safety valve is available as an accessory).
Route the discharge pipe line into a drain funnel. The mini-
mum system pressure is 1.0 bar. The boilers are approved
exclusively for sealed systems of up to 6 bar. The maximum
owtemperatureisfactory-setto80°Candmaybeadjusted
to 90°C if required.
Safetyequipment
18 3062555_201804
10.Installation
Note:
Provideadrain&llvalveatthelowestpointinthesystem.
InformationfromVDI2035
The way in which commissioning in particular is carried out
canhaveastronginuenceonscaling.Heatthesystematthe
lowest output with an even and adequate throughput. For mul-
ti-boiler systems it is recommended to commission all boilers
simultaneously to prevent the overall amount of lime concen-
trating on the heat exchanger surface of an individual boiler.
The minimum system pressure is 1.0 bar.
The gas condensing boiler is approved exclusively for sealed
systems of up to 6 bar. The maximum ow temperature is
factory-set to 80 °C and may be adjusted to 90°C if required.
Generally,theowtemperatureis80°CforDHWoperation.
Safetyequipment
Generalrequirements
Thereisariskofdamagetotheboilerresulting
fromwaterleaks,poorheattransferorcorro-
sion.
- Before connecting the gas condensing boiler, ush the
heating system to remove residues such as welding pearls,
hemp, putty, sludge sediments, etc. from the pipework
- Install a strainer/dirt trap in the return line and service the
strainer/dirt trap at regular intervals, see WOLF accessories
(500μm=0.5mm)
- The automatic air vent valve for the appliance must be
opened during operation
- Themax.owrateof100l/min(6000l/h)mustnotbeex-
ceeded
- Drinking water or desalinated domestic drinking water should
beusedasllwaterandtop-upwaterThehardnessofthe
systemwatermustbelessthan2dH.Thellandtop-up
waterqualitiesforthespecicsystemcanbefoundinthe
chapter “Technical information for water treatment”.
- If an ingress of oxygen cannot be ruled out, a system sep-
aration is advisable
- TheheatingwaterpHvaluemustbebetween8.2and8.5
- Ingeneral,llandtop-upwatermustbedesalinated;soften-
ing by means of a single stage de-ioniser is not permissible.
For this, the permissible methods and limits should be
obtained from the chapter “Technical information for water
treatment”(NOTEthelimitvaluesarespecictothesystem).
- Inhibitors and antifreeze are not permissible.
- A system log must be kept (see Technical information for
water treatment)
Aftercorrectllingofthesystem,thesystemmustbeheatedup
tothemaximumlevelandthenthetotalhardnessandpHvalue
must be measured again and adjusted as necessary. These
values must be checked and adjusted again after 6-8 weeks.
Heatingwater
Themaximumowratemustnotexceed
6000l/h(100l/min).
carryoutaleaktestonthepiping:
Testpressureonheatingwatersidemax.8bar.
Prior to testing, close the shut-off valves in
theheatingcircuitfortheappliance,because
otherwise,thesafetyvalve(accessory)opens
at3bar.Theappliancehasalreadybeentested
atthefactoryfortightnessat6bar.
Iftheapplianceisnotwatertight,thereisarisk
ofleaksandresultingmateriallosses.
Additionalrequirementsforoperationwithoutalowloss
header
- Systems with only one CGB-75/100
- Sludge separator in the boiler return of the CGB-75/100
- Desalinationoftheheatingwaterto2-3°dH
- Control of cylinder charging only via the MM module (con-
gurations1and10)
- Cylinder charging pump at least DN 25 with at least 6 m
head
- Themax.owtemperaturemustbeadjustedwithparameter
HG08to75°C
Thetechnicalinformationforwatertreatment
mustbeobserved,otherwisesystemdamage
duetowaterleaksmayoccur.
The manufacturer does not assume liability for any damage
to the heat exchanger caused by oxygen diffusion in the heat-
ing water. In the event of oxygen penetrating the system, we
recommend a system separation through the interconnection
of a heat exchanger.
For a specic system volume of >50 l/kW, adjust the total
hardnessto2-3°dHusingadesalinationprocess.
193062555_201804
10.Installation
Condensatedrainconnection
Connect the trap supplied to the connector on the combustion
chamber pan.
Note: Fill the trap with water prior to commissioning.
If condensate is directly routed to the drain pipe, ensure ventila-
tion, so that the drain pipe cannot affect the condensing boiler.
Fig.: Trap
Trap
Thetrapmustbelledwithwaterpriorto
commissioning.Operatingtheappliancewith
anemptytrappresentsariskofpoisoningor
asphyxiationduetotheescapeofuegases.
Undothetrap,removeandlluntilwaterruns
outofthedrainholeontheside.Retthetrap
andensurethegasketsealstightly.
The condensate must only be routed through pipes that are
resistant.
Observe the relevant instructions if you install a neutralising
system (accessory).
Fig.: Neutralising system (accessory)
Condensatepump
When using a condensate pump, the alarm output can be con-
nectedatconnectionE1.SettheboilerparameterHG13to"2".
The alarm output switches the appliance OFF if condensate
cannot be pumped out correctly.
20 3062555_201804
10.Installation
Gasconnection
Fig.: Straight-through gas ball valve (accessory)
Onlyalicensedgasttermayroutethegaspipe
andmakethegasconnections.Closethegas
ballvalveonthecondensingboilertopressure
testthegaspipe.
Removeallresiduesfromtheheatingpipework
andthegaspipepriortoconnectingthecon-
densingboiler,particularlyinoldersystems.
Priortocommissioning,testallgaspipesand
connectionsforleaksaccordingtoTRGI.Only
foaming leak detection sprays which are ap-
provedbytheDVGWshouldbeused.
Inappropriate installation or using unsuitable
components or assemblies may lead to gas
escaping,whichresultsinariskofpoisoning
andexplosion.
Install a gas ball valve with fire protection
in the gas supply line upstreamof the Wolf
condensingboiler.Otherwiseexplosionsmay
occurifthereisare.Sizethegassupplypipe
in accordance with DVGW-TRGIregulations
[Germany].
Gasttingsontheappliancemayonlybepres-
sure-testedtoamaximumof150mbar.Higher
pressuremaydamagethegastrain,resultingin
ariskofexplosion,asphyxiationorpoisoning.
Closethegasballvalveonthegascondensing
centretopressuretestthegaspipe.
Mountthegasballvalveinaneasilyaccessible
place.
- Prior to installation, ensure that the boiler corresponds to the
local gas type. The factory settings for the particular type of
gas can be obtained from the following table.
Table: Factory setting according to gas type
1)
Not applicable for Austria/Switzerland
2)
Does not apply to Switzerland
NaturalgasE/H:
Ws=11.4-15.2kWh/m
3
=40.9-54.7MJ/m
3
NaturalgasLL:
1)
Ws= 9.5-12.1kWh/m
3
=34.1-43.6MJ/m
3
LPG P:
2)
Ws=20.2-21.3kWh/m
3
=72.9-76.8MJ/m
3
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64

Wolf CGB-75 Installation And Operating Instructions Manual

Category
Water heaters & boilers
Type
Installation And Operating Instructions Manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI