11
G. General (continued)
H. Boiler Stacking
1. For installations with unusually high space heating
and/or domestic hot water heating loads, where
and boiler redundancy, Phantom boilers may be
installed stacked maximum one boiler on top of
another. Refer to Table 3 “Phantom Boiler Model
Stacking Combinations” for details.
PHNTM399
PHNTM399
PHNTM500 PHNTM399 or PHNTM500
2.
II “Unpacking Boiler” and III “Pre-Installation
& Boiler Mounting” of the manual for details.
Always position higher input boiler model as
bottom boiler.
b. Each Phantom boiler is factory packaged with
2 stacking boiler attachment brackets (P/N
101679-01) and the bracket mounting hardware
[six (6) self-drilling hex washer head plated
#8 x ½” long screws]. Locate and remove the
brackets and the hardware. The stacking boiler
attachment bracket has three 7/32” diameter
holes punched in a triangular pattern. See
Figure 3 “Stacking Boiler Attachment Bracket
Placement”.
c. Phantom boiler left and right side panels have a
series of dimples at panel top and bottom. These
dimples are positioning dimples for stacking
boiler attachment bracket mounting screws. Side
panel bottom positioning dimples are evenly
spaced from boiler front and back, while side
pattern to compensate for Phantom boiler model
variable depth.
d. Position the upper boiler on top of the bottom
with each other.
onto the upper boiler left side panel, at the
panel lower left corner and align bracket two
upper holes with corresponding side panel
lower dimples.
with a matching bottom boiler left side panel
top positioning dimple.
top and bottom boiler left side panels with
the mounting screws.
e. Repeat above procedure to install second
stacking boiler attachment bracket and secure the
stacked boiler right side panels together at the
front right corner.
f. Install the third stacking boiler attachment
bracket to secure top and bottom boiler left side
panels at the rear left corner. Align the bracket
holes with corresponding positioning dimples in
the top boiler and bottom boiler left side panels,
then secure bracket with the screws.
g. Repeat above procedure to install the fourth
stacking boiler attachment bracket to secure
stacked boiler right side panels at the rear right
corner.
3. When installing stackable boiler combinations
observe the following guidelines:
a. Venting - Top and bottom boilers must have their
individual vent piping and vent terminals.
WARNING
For sidewall venting individual model vent
terminals must terminate no closer than 12
in. (300 mm) horizontally and 3 ft. (900 mm)
vertically from each other in order to prevent
combustion air contamination. For vertical
through the roof venting, individual vertical
vent terminals, if level with each other, must
be spaced no closer than 12 in. (300 mm)
horizontally. If vertical terminals cannot end in
one plane, they must be spaced no closer than 3
ft. (900 mm) horizontally.
Follow instructions in Section IV “Venting”
vent termination. Follow instructions in Section
V “Condensate Disposal” for each individual
condensate disposal. Terminating individual
boiler condensate lines into common pipe prior
to drain disposal is permissible, providing
to handle combined condensate volume of
stackable combination.
b. Gas Piping - Follow instructions in Section