Intermetro MetroMax Q Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Intermetro MetroMax Q Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
®
ASSEMBLY
INSTRUCTIONS
ASSEMBLY
INSTRUCTIONS
For MetroMaxQ Super Slide
L01-257
9/96
Information and specifications are subject to change
without notice. Please confirm at time of order.
Super Slides must be used with
MetroMax Q 24" deep Shelving.
Slides may be used with both
Open Grid or Solid Shelf Mats.
Shelf Mat
Shelf
Frame
Super Slide
Tote Box
Center Snake
Fig. 1
Fig. 2
Fig. 3
Fig. 4
5. Replace the shelf mats. If
necessary, adjust the location of the
slides so that clips falls between the
ribs on the underside of the mat(s).
6. Install tote boxes into slides
(Fig. 4).
4. Replace the two center snakes
(Fig. 3).
3. The front of the slide is the open
end. Drop the slide into the shelf
frame. The clips must attach to
the top wires of the shelf frame
(Fig. 2).
1. Construct the shelving unit per
the instructions supplied in the
shelving carton.
2. On the shelf to which the slide is to
be mounted, remove the shelf mats
and two (2) center snakes from the
shelf frame (Fig. 1).
SUPER SLIDE
®
InterMetro Industries Corporation
North Washington Street, Wilkes-Barre, PA 18705
For Product Information Call: 1-800-433-2232
Visit Our Web Site: www.metro.com
/