Legrand Power Packs and Slave Packs Installation guide

Type
Installation guide
WARNING Turn the power off at the circuit breaker before
installing power/slave packs!
Only qualified electricians should attempt to install
PASS & SEYMOUR/LEGRAND
®
power/slave packs!
The power pack is attached to existing junction boxes. All low voltage wiring
should be at least 22 gauge wire. All high voltage connections should be at
least 14 gauge. Always check local building codes. After initial wiring is
complete, check to verify power pack is wired correctly. Improper wiring can
cause damage to power pack, lighting system, and occupancy sensor.
Part No. 340399 Rev B.
Printed in U.S.A.
Control Output 24VDC
Common
+24VDC
White / Neutral
Red (Load)
Red (Line)
White
BlackHot
N
Power Pack
Slave Pack
Red (load)Red (line)
Hot
OFF switch
Black
Blue
Red
Black
Blue
Switch
N
Lighting
Load
Lighting
Load
Any 24VDC Sensor
Ceiling or Wall Mount
Power Pack
High Voltage
Connection Made
inside J-Box
Two phase
circuit lighting
with two loads
INSTALLATION INSTRUCTIONS
POWER PACKS and SLAVE PACKS
CAT. NOs. PWP220, PWP277, AR120/277
P.O. Box 4822
Syracuse, NY 13221
(800) 223-4185
  • Page 1 1

Legrand Power Packs and Slave Packs Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI