Coyote C2C36NG, C2C36LP, C2C42LP Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Coyote C2C36NG Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
www.coyoteoutdoor.com
DIMENSIONAL RENDERINGS
Model No. Gas Supply BTU's Regulator WC Pressure Max PSI Electrical Requirements
C2C36LP Propane 80,000
1/2" Female Pipe
11" .5 PSI Qty 1 - 120 VAC 60 Hz Grounded Plug
C2C36NG Natural Gas 80,000
20 lb Tank Regulator
4" .5 PSI Qty 1 - 120 VAC 60 Hz Grounded Plug
Model No. Height Width Depth
Model No. Height Width Depth
C2C36
C2C36
23"
CJAKTCS36
11"
CJAKTCS36
23"
Cutout Dimensions for Island
Overall Product Dimensions
When using a Coyote insulated jacket, you will want to build your island to the jackets Cutout and Overall Dimensions
listed above (detailed on 2nd page). Once the jacket is installed, the grill will rest on/inside the insulated jacket
35
3
/4"
20
1
/2"
25
1
/2"
10
1
/4"
11"
37
5
/8"
22
1
/8"
32
1
/2"
35
1
/2"
C
2C36 INSTALL GUIDE
Important Note to Installer: This file is not intended to replace your Owners' Manual which contains specific safety
requirements and consumer guidelines. Please refer to your Owners' Manual prior to installing or operating your built-in grill.
11"
23"
35
3
/4"
37
5
/8"
22
1
/8"
www.coyoteoutdoor.com
10
1
/4"
OPENING
HEIGHT
DOORS / DRAWERS
OPENING WIDTH
20
1
/2"
OPENING
DEPTH
OPENING
HEIGHT
GRILL
OPENING
GRILL
OVERHANG
TOP VIEW
OPENING WIDTH
2
1
/2"
OPENING
HEIGHT
DOORS / DRAWERS
OPENING WIDTH
OPENING
DEPTH
OPENING
HEIGHT
24"
LINER
OPENING
7
/8"
JACKET
OVERHANG
TOP VIEW
OPENING WIDTH
24"
FRONT VIEW
FRONT VIEW
1
1
/2" MIN
INCLUDING
COUNTERTOP
Combustible material can not be within 24" of the grills frame
This applies to all directions - horizontal & vertical
Shaded area above on "TOP VIEW" illustrates the 24" minimum
requirement (not to scale for rendering purposes)
The grill is designed to hang from the counter top with no support
underneath
Minimum rear clearance for the hood to open is 2"
If you have a wall/partition behind the grill, the minimum rear clearance
to that wall should be at least 7" to allow for ventilation of the exhaust
24"
If using combustible material within 24" of the grill frame, you MUST use
the corresponding Coyote Insulated Jacket
Using a insulated jacket, does not waive any other standard installation
procedure (ventilation, connections, etc)
The jacket is designed to hang from the counter top with no support
underneath
Minimum clearance for hood to open is 2"
If you have a wall/partition behind the grill, the minimum rear clearance
to that wall should be at least 7" to allow for ventilation of the exhaust
Important Note to Installer: This file is not intended to replace your Owners' Manual which contains specific safety requirements
and consumer guidelines. Please refer to your Owners' Manual prior to installing or operating your built-in grill.
Ventilation Requirements:
Regardless if you are using a combustible or non-combustible building material, you must include at least two vents within
the island.
These vents must be at least 20 sq. in. each and allow fresh air to move from the grill cabinet to the exterior environment.
For a propane setup, the vents should be installed lower as propane is heavier than air.
For a natural gas setup, the vents should be located higher in the island, as natural gas is lighter than air.
Do not locate the two vents on the same wall of the island. Cross ventilation is key to allow any excess heat or trapped
gas to dissipate.
1
1
/2"
1
5
/8"
1
1
/2"
22
1
/8"
1
1
/2" MIN
7
/8"
11"
INCLUDING
COUNTERTOP
35
3
/4"
1
3
/4"
2
1
/2"
2
1
/2"
2"
G
GAS
CONNECTION
G
4
1
/8"
4
1
/8"
G
GAS
CONNECTION
4
1
/8"
G
2
3
/4"
32
1
/2"
C
2C36 INSTALL GUIDE
NON-COMBUSTIBLE CONSTRUCTION
Insulated Jacket NOT Required
COMBUSTIBLE CONSTRUCTION
Insulated Jacket Required - Model # CJAKTCS36
/