RGBlink DV8 Quick start guide

Type
Quick start guide
DV8 Quick Start
VIEWSIZE THE WORLD
DVI signal distribution, each DVI input can be
distributed to 2 DVI outputs
Compatible with all kinds of sending cards, 8
install full-color LED sending card slot
System integration, ingeniously designed, which
adopts board pluggable structure
Adopts air cooling processing, energy
conservation and environmental protection
Signal adaptive matching design to solve the
problem of high resolution interference and out
of sync when distribute signal
Point-to point correction technology allows the
manufacturers to relax the requirements in LED
brightness and color, which reduce the
purchasing cost
AddressS603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
1
CONTENT
Product Introduction ............................................................................................................................... 2
Packing Configuration ............................................................................................................................ 3
Hardware Orientation .............................................................................................................................. 4
Back Panel ......................................................................................................................................... 4
Operating Instruction .............................................................................................................................. 5
How to Connect .................................................................................................................................. 5
How to Work ....................................................................................................................................... 5
Sending Card Installation ....................................................................................................................... 6
Contact Information............................................................................................................................... 12
AddressS603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
2
Product Introduction
DV8 sending card install case supports DVI
signal distribution, each DVI input can be
distributed to 2 DVI outputs.
DV8 is ingeniously designed, adopts board
pluggable structure, which can built in 8 install
full-color LED sending card slots (4 sending
card slot for Nova MSD600).
It compatible with all kinds of sending cards,
including Linsn 801/802, Nova MSD300, Nova
System Connection
RGBlink offers solutions to
demanding technical problems.
Any application questions, or
required further information,
please contact with our
customer Support Engineers.
DV8 System Connection Diagram
AddressS603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
3
Packing Configuration
Note: Chinese Standard, American Standard or European Standard power cord is option.
Power Cord
Antistatic Bag
DVI HDMI 线
防静电袋
Certification
AddressS603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
4
Hardware Orientation
Back Panel
Input Interface
1
DVI Input DVI-I port
Other Interface
3. 5
Outputs of Sending Card
4. 6
DVI Input Port of Sending Card
7
Power IEC-3 Port
8
Switch
Output Interface
2
DVI Output DVI-I port
AddressS603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
5
Operating Instruction
How to Connect
Operation steps are as follows:
1. Connect the device or computer with DVI interface to the DVI input interface in the first row of DV8
with the DVI cable.
2. Connect each DVI output interface to the corresponding DVI input interface of sending card with the
DVI cable.
3. Connect the outputs of sending card to LED display with the network cable.
4. Plug into power cord with IEC connector.
Same connections for the second row, the third row and the fourth row interfaces, as shown:
How to Work
Push the power button to ON position, the device will operate as follows:
1. Input DVI signal, each DVI input interface will output the signal to the 2 output interfaces.
2. The output interfaces will output the signal to the corresponding inputs of sending card.
3. The inputs interfaces of sending card will output the signals to the outputs of sending card.
4. The outputs of sending card will output the signal to LED display.
AddressS603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
6
Sending Card Installation
DV8 supports the sending cards include the following:
Sending Card Type
Sending Card Model
Linsn
801, 802
Nova
MSD300MSD600
Mooncell
VCMA7-V30
Colorlight
IT7
DBstar
Q2011
We will introduce the sending card installation in the following parts. The installation steps of
Linsn 801/802, Nova MSD300, Colorlight IT7 and DBstar Q2011 sending card are the same, take
Linsn 801 for example, specific steps are as follows:
1. Choose any sending card block (commend choose the first row or the third row on both sides of the
sending card block, as default binding the power cords in these positions), and unscrew the captive
screws, then pull out the sending card block, as shown in figure 1:
(Figure 1)
AddressS603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
7
2. Untie the power cords, and unscrew the fixed screws on sending card block, as shown in figure 2:
(Figure 2)
3. Put Linsn 801 sending card into the sending card block and fix it with 2 fixed screws, as shown in
figure 3:
AddressS603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
8
(Figure 3)
4. Plug the power cord into the sending card, and push the sending card into the device along the slide
rail, then screw the captive screws, as shown in figure 4:
(Figure 4)
Note: It needs the power adapter when install the Mooncell sending cards, as shown in figure 5, the
install steps are the same as above. (Customers are advised to purchase the power adapter as we
will not provide it, and the salesman must list it explicitly in the order. Should you have any
further queries, please contact our salesman.)
AddressS603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
9
Power adapter Power interface
(Figure 5)
The install steps for Nova MSD600 are the same as above, but the following 3 points need to be
noted:
1. Before install the Nova MSD600 sending card, user should unscrew the 12 fixed screws on the side
panels (6 pieces each side), and remove the top panel, as shown in figure 6:
(Figure 6)
Then move the unilateral fixed groove on the base panel from position 1 to position 2 (As the circuit
board of Nova MSD600 is wider than other sending cards, the purpose of moving the unilateral fixed
groove is to increase the sending card installation width. User can also move the other unilateral fixed
groove, according to the install quantity of sending card. Assemble the top panel when complete. As
shown in figure 7.
AddressS603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
10
Position 1 Position 2
(Figure 7)
2. It needs the Nova MSD600 block (Customers are advised to purchase the Nova MSD600 block
as we will not provide it, and the salesman must list it explicitly in the order. Should you have
any further queries, please contact our salesman.), and fix the Nova MSD600 sending card to
the block with fixed screws, as shown in figure 8:
(Figure 8)
3. It needs the power adapter (Customers are advised to purchase the power adapter as we will
not provide it, and the salesman must list it explicitly in the order. Should you have any
further queries, please contact our salesman.), and connect to the power interface with the
dedicated power cord of Nova MSD600, as shown in figure 9:
AddressS603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
11
Power interface
(Figure 9)
The picture after install can be seen in figure 10:
(Figure 10)
AddressS603-604 Weiye Building Torch Hi-Tech Industrial Development Zone Xiamen, Fujian Province, P.R.C
Tel: 00865925771197 Fax: 00865925788216
Email: [email protected] http://www.rgblink.cn
12
Contact Information
Warranty:
All video products are designed and tested to the highest quality standard and backed by
full 3 years parts and labor warranty. Warranties are effective upon delivery date to
customer and are non-transferable. RGBlink warranties are only valid to the original
purchase/owner. Warranty related repairs include parts and labor, but do not include
faults resulting from user negligence, special modification, lighting strikes,
abuse(drop/crush), and/or other unusual damages.
The customer shall pay shipping charges when unit is returned for repair.
Headquarter: S603~604 Weiye Building Torch Hi-Tech Industrial Development Zone
Xiamen, Fujian Province, P.R.C
Tel: +86-592-5771197
Fax: +86-592-5788216
Customer Hotline: 4008-592-315
Web:
~ http://www.rgblink.com
~ http://www.rgblink.cn
E-mail: support@rgblink.com
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13

RGBlink DV8 Quick start guide

Type
Quick start guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI