Temperature Caution: Cable pulling and Tap installation should not be
attempted in temperatures below 32°F / 0°C.
Two installers are recommended!
— one to see that Cable is kept flat in
615CLWA Pull-In Guide and one to pull at far end of run.
For short runs: A length of Cable may be cut from reel and loosely recoiled
to prevent twisting during pull-in.
For longer runs: Cable may be unreeled as it is pulled in.
Tools Required:
• Utility knife
• Hand-held hacksaw or hacksaw blade
• Wiremold PVC Cutter or commercially available anvil blade cutter
NOTE: Tabletop or flat cutting surface recommended for easiest cable preparation.
1d Install
Coupling.
2b Attach CLWEC
Endcap/Puller to Cable.
2d Attach
615CLWA Pull-In
Guide to Strut.
Prepare end of Cable as described in Step 2a. Attach prepared end of Cable to Endcap/Puller per
Step 2b. Pull Cable into Strut the remainder of the way insuring that both Endcap/Pullers are inside
of the Strut. Remove Pull-In rope from Endcap/Puller.
2f Continue pulling Cable into Strut.
IMPORTANT: Engagement of Endcap/Puller and Cable in Strut should be monitored during pull-in. Cable must be kept flat and pre-
vented from twisting between coil or reel and Pull-In Guide. Two installers are recommended.
Pull Cable until the Endcap/Puller is approximately one foot from exiting the end of the Strut run. Remove Pull-In Guide from end of
Strut and cut Cable leaving approx. one foot extending from Strut end.
1e Connect continuing
Strut sections.
1. Align end of Strut
to center of locating
hole on coupling.
2. Tighten two
locking screws.
2. Tighten two
locking screws.
3. Tighten
two locking
screws.
1. Slide strut
into coupling.
1. Insert prepared end of Cable
into bottom half of Endcap/Puller.
Bend cable upward to match
slope of CLWEC base.
2. Make sure that insulation barri-
ers are positioned in cable slits
between each conductor.
Strut end
Install “U” bolt over Strut end
and tighten nuts securely.
3. Snap cover over
cable into bottom half
of Endcap/Puller.
4. Tightly secure
cover screw.
2
Pull in CLWFC Cable . . .
3
Install Endcap . . .
2a Prepare cable for
Endcap/Puller.
1. Using the Wiremold PVC Cutter or an
anvil blade cutter, prepare end of cable
with clean, perpendicular cut.
2. Using utility knife, cut
away side flanges 8-12".
(This allows cable to fit
inside CLWEC.)
3. Using hacksaw blade, slit
1
/
4
" -
1
/
2
"
between each conductor on score
marks. (This allows cable to be posi-
tioned between insulation barriers in
CLWEC.)
2c Attach
Pull-In Rope to
Endcap/Puller.
NOTE: 1/4" diameter Polypro
Rope with 1200 lb. tensile
strength and 210 lb. working
load is recommended.
2. Closed loop knot.
1. Thread pull-in rope through
hole in the direction as shown.
2e Feed
Cable into
Strut.
1. Place cable over Pull-In Guide
rollers. PRINTED SIDE of Cable
must be facing towards rollers.
Cable
Endcap/Puller
2. Feed Endcap/Puller into Strut.
Proper alignment of Cable
& Endcap/Puller in Strut.