RS
hammer
Use the binding posts to connect
the output AC cable LGN and input
cable LGN, then install the bracket
cover.
M4*10MM
M8*30MM
M4*16MM
M8*40MM
Knock off
Cable
1.
3.
2.
Use a flat-blade screwdriver to open the plug After take the plug out, the screwdriver extends into the opened hole
After aligning the knob in the hole, turn the knob clockwise to adjust
the color temperature, the adjustment sequence is 3K-5K-4K cyc
3K
4K
5K
Slim Area light (Dimmabel),120-347V 3Way CCT Adjustable
www.simplyretrofits.com