ICM Controls ICM200FB Installation guide

Type
Installation guide
ICM
200/201/202
DELAY ON BREAK
6333 Daedalus Drive, Cicero, N.Y. 13039
visit us on the web at: www.icmcontrols.com
800-365-5525
ICM CONTROLS
LII273-1
2-Wire Compressor
Lockout/Anti-Short
Cycle Timer
VPS
SPECIFICATIONS
Input
Voltage: 18-30 VAC
Frequency: 50/60 Hz
Output
Output Ratings:
– Maximum: 1.5 amps
– Minimum: 40 mA
– Inrush: 15 amps
Time Delay
3 or 5 minute xed, 10 minute
adjustable
INSTALLATION
1. Disconnect power.
2. Connect terminals in series with the
starting device as shown in the wiring
diagram below.
3. Select desired time delay
(adjustable models only).
4. Reapply power, check operation.
5. Trickle current bypass resistor
T1 to T3 <1K ohm.
MODE OF OPERATION
With application of power, the load is
energized. When the thermostat opens
or there is a loss of power, the load is de-
energized and the delay period begins.
The compressor will not start again during
the delay period.
WIRING DIAGRAM
TIMING DIAGRAM
3 or 5 minute xed or 10 minute adjustable delay
Works with anticipator thermostats
Y
R
C
T’STAT
Contactor
Compressor
Control
Transformer
Line
Voltage
Time Delay Initiated
Load
Energized
Load
Energized
Time
Delay
Load
Voltage
0
V
0
V
Input
Voltage
Switch Open or
Loss of Power
Switch
Closed
Time
Time
  • Page 1 1

ICM Controls ICM200FB Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI