Lennox Pressure Switch Replacement Kit -- SLP98UHV & SLP98DFV Units Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Lennox Pressure Switch Replacement Kit -- SLP98UHV & SLP98DFV Units Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Page 1
INSTALLATION INSTRUCTIONS FOR COMBUSTION AIR PRESSURE SWITCH KITS
(74W36, 74W37, 93W75 and 93W76) USED WITH 90% EFFICIENCY VARIABLE CAPACITY
AND MODULATING GAS FURNACES
Litho U.S.A.
506620-01
04/2015
Supersedes 06/2012
PRESSURE SWITCH
REPLACEMENT KIT
GAS KITS & ACCESSORIES
E 2015
Shipping & Packing List
Package 1 of 1 contains:
1 - Pressure switch
Application
Pressure switch replacement kits (74W36, 74W37, 93W75
and 93W76) are used with variable capacity and
modulating furnaces. See table 1 for usage and elevation.
WARNING
This kit is to be installed by a licensed professional
service technician (or equivalent) or other qualified
agency in accordance with the manufacturer's in
structions, all codes and requirements of the author
ity having jurisdiction in the USA, and the require
ments of the CSA-B149 installation codes in Canada.
If the information in these instructions is not fol
lowed exactly, personal injury or loss of life may oc
cur. The qualified agency performing this work as
sumes responsibility for this conversion.
TABLE 1
Kit Number and Elevation
Kit Elevation (ft.)
74W36, 93W76 0 - 7500
74W37, 93W75 7501 - 10,000
Installation
1 - Turn off the electrical power and gas supply to the unit.
2 - Remove the heating compartment access panel.
3 - Remove the tubing and disconnect wires from the
existing pressure switch. Label wires and tubing
making note of tubing color and negative and positive
pressure switch ports.
NOTE - Black tubing is used for the positive port. Red
tubing or red and black tubing is used for the negative port.
4 - Remove the existing pressure switch by carefully
pressing the tab which secures the switch assembly to
the cold end header box. See figure 1.
5 - Reconnect existing wires to replacement pressure
switch.
6 - Install replacement pressure switch. Reconnect
pressure switch tubing as shown in figures 2 and 3.
7 - Replace access panel and restore the electrical power
and gas supply to the unit.
8 - Follow lighting instructions on unit nameplate.
REMOVING PRESSURE SWITCH
FIGURE 1
Tab
Pressure Switch
Assembly
Gas
Valve
Cold End
Header Box
Negative
Port
Positive
Port
Low Fire
High Fire
Page 2
UPFLOW/HORIZONTAL FURNACE
(shown in upflow position)
FIGURE 2
Gas Valve
Cold End Header Box
High-Fire Pressure
Switch
Low-Fire Pressure
Switch
1
2
3
4
1 - Black hose from front port on low-fire pressure switch to
positive port on the gas valve.
2 - Red and black or red hose from rear port on low-fire pres
sure switch to the negative port on the gas valve.
3 - Red and black or red hose from front port on high-fire pres
sure switch to negative port on cold end header box.
4 - Black hose from rear port on high-fire pressure switch to
positive port on cold end header box.
DOWNFLOW FURNACE
FIGURE 3
1
2
3
4
Gas Valve
Cold End
Header Box
High-Fire
Pressure
Switch
Low-Fire
Pressure
Switch
1 - Black hose from front port on low-fire pressure switch to
positive port on the gas valve.
2 - Red and black or red hose from rear port on low-fire pres
sure switch to the negative port on the gas valve.
3 - Red and black or red hose from front port on high-fire pres
sure switch to negative port on cold end header box.
4 - Black hose from rear port on high-fire pressure switch to
positive port on cold end header box.
PRESSURE SWITCH WIRING FOR UPFLOW/
HORIZONTAL AND DOWNFLOW FURNACES
FIGURE 4
NO
C
NO
C
PRESSURE SWITCHES
LOW
FIRE
HIGH
FIRE
PINK
PURPLE
PINK
VIOLET/PURPLE
To P58 12 pin
connector on the
integrated control
To P58 12 pin
connector on the
integrated control
To P58 12 pin
connector on the
integrated control
/