Buderus GB312 Series Technical Service Bulletin

  • Hello! I am an AI chatbot trained to assist you with the Buderus GB312 Series Technical Service Bulletin. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Technical service bulletin
BIM Module Change Procedure
Bulletin Number: TBG-19 | Model: GB312 Series Boilers
Tools Needed
• Drill
• Rivetingtool
• Phillipsheadscrewdriver
• 30TTorxscrewdriverorangletorx
•
BIM Module Change Procedure
1. Disconnectignitiontransformerbyunpluggingtheignition
cables(Fig.1,pos.A)andthepowersupplycable(Fig.1,
pos.B).Loosentwotorxscrewsandremovetransformer
(Fig.1,pos.C).
Figure 1
A
B
C
2. DisconnectgroundingcableundercablecoverofSAFecontrol
(Fig.2).PressbothplasticclampsofSAFecontrolcoveron
backsideofmetalholdingplate(Fig.3)andpullcomplete
SAFecontrolloosefromholdingplate(payattentiontowiring
ofcontrol).
Figure 2
Figure 3
3. UnscrewscrewsNo.20(installation&maintenancemanual
page109)andremoveholdingplatetogetherwiththeoldBIM
programmingmodule(Fig.4).
Figure 4
4. DrilloutrivetwhichxesBIMmoduletometalplate(Fig.5).
Figure 5
Bulletin Number: TBG-19
|
GB312 Series Boilers Technical service bulletin
Datasubjecttochangewithoutnotice|BTC431002101A|02.2010
Buderus
BoschThermotechnologyCorp.
50WentworthAve
Londonderry,NH03053
Tel:(603)552-1100
Fax:(603)584-1681
www.buderus.net
5. RemoveoldBIMmoduleandinsertnewmodule.Secure
BIMmodulewithnewrivet(includedinshipment)and
adequaterivetingtool(Fig.6).
Figure 6
6. Reassembleholdingplate(payattentiontothesmall
bendedfansupportsheet(Fig.7,pos.A)whichshouldbe
locatedonthemetallicfanmotormount(Fig.8,pos.A;see
alsopage109).Fastenscrews20(IMpage20;seealso
Fig.9).
Figure 7
A
Figure 8
A
Figure 9
7. ReassembleSAFecontrolbyreconnectingthegrounding
cable(Fig.2)andattachingtheSAFecontroloverthenew
BIMmoduleontheholdingplate.SAFecoverPlasticlatches
(Fig.10,pos.A)mustsnapintotheholdingplatemounts(Fig.
10,pos.B).
Figure 10
A
B
8. Reinstalltransformerandsecurewithtwotorxscrews
(Fig.1,pos.C).
9. Reconnecttheignitiontransformerbyplugginginthe
connection/ignitioncables(Fig.1)
/