Bulletin Number: TBG-19
|
GB312 Series Boilers Technical service bulletin
Datasubjecttochangewithoutnotice|BTC431002101A|02.2010
Buderus
BoschThermotechnologyCorp.
50WentworthAve
Londonderry,NH03053
Tel:(603)552-1100
Fax:(603)584-1681
www.buderus.net
5. RemoveoldBIMmoduleandinsertnewmodule.Secure
BIMmodulewithnewrivet(includedinshipment)and
adequaterivetingtool(Fig.6).
Figure 6
6. Reassembleholdingplate(payattentiontothesmall
bendedfansupportsheet(Fig.7,pos.A)whichshouldbe
locatedonthemetallicfanmotormount(Fig.8,pos.A;see
alsopage109).Fastenscrews20(IMpage20;seealso
Fig.9).
Figure 7
A
Figure 8
A
Figure 9
7. ReassembleSAFecontrolbyreconnectingthegrounding
cable(Fig.2)andattachingtheSAFecontroloverthenew
BIMmoduleontheholdingplate.SAFecoverPlasticlatches
(Fig.10,pos.A)mustsnapintotheholdingplatemounts(Fig.
10,pos.B).
Figure 10
A
B
8. Reinstalltransformerandsecurewithtwotorxscrews
(Fig.1,pos.C).
9. Reconnecttheignitiontransformerbyplugginginthe
connection/ignitioncables(Fig.1)