Guardian Guardrail Safety Swing Gate Operating instructions

Type
Operating instructions
Standard sizes are 18” , 24”, 27“ and 36”
Installing between uprights
Mounting to Angle Iron
Mounting Between Guardrail Posts
2” Max
Diameter
Guardrail Gate
Part #:
1) Attach Guardrail Gate hinges to vertical
support of railing or guardrail with provided
U-Bolts or other appropriate fasteners approved
by Guardian. Leave Guardrail Gate hinges loose as
further adjustments might be needed.
2) Line up top of Guardrail Gate as close as
possible to top rail of guardrail or railing. Ideally,
you want top rail to be continuous through
Guardrail Gate. Ensure that Guardrail Gate always
opens inward and away from fall hazard.
3) Line up hinge brackets so they are at a 90°
angle to Guardrail Gate and mounting surface.
4) Adjust hoop on Guardrail Gate to appropriate
width. Adjustments can be made by loosening
bolts (circled in top picture) and sliding hoop to
desired width. Be sure that stop plate impacts
against opposite vertical column so that Guardrail
Gate is secure and cannot be pushed open. Once
proper adjustment is made, tighten adjustment
bolts down.
5) Operate Guardrail Gate through full range of
motion to insure proper installation before
permanently attaching. When using U-Bolts to
connect to pipe, tighten nuts down to 20 ft/lbs of
torque. Verify that Guardrail Gate is tightly secured
before use.
Adjustment Bolts
Guardian Fall Protection • www.guardianfall.com • 800-466-6385 • 6305 S. 231st St., Kent, WA 98032
15105 15110
15111 15112
85143 (Rev. A)
  • Page 1 1

Guardian Guardrail Safety Swing Gate Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI