Installation Instructions:
D980R
Westbrass
2429 E Olympic Blvd., Los Angeles, CA 90021 • www.westbrass.com • info@westbrass.com • (213) 627-8441
3”
1/4” - 20 x 1-1/2”
Machine Screw
3”
1/4” - 20 x 1-1/2”
Machine Screw
798-BAR Bracket for
Integral Overflow Tubs
2-Hole Overow Replacement
Integral Overow Replacement
1. Wrap end of screws with PTFE tape.
2. Place screws through 980-RING
3A. For 2-Hole Overow installation:
Thread screws into top elbow until rm.
Do not overtighten.
3B. For Integral Overow Installation:
Thread screws loosly, through 980-RING
into 980-BAR.
Position 980-BAR behind tub wall with
980-RING inside of tub. Tighten until rm.
Do not overtighten.
4. Thread on cover
2429 East Olympic Blvd. Los Angeles, CA 90021
t'"9tXXXXFTUCSBTTDPN
D980R
'MPBUJOH0WFSøPX,JU
'PS5XP)PMF'BDF1MBUFT
Fine Decorative Plumbing Since 1935
WESTBRASS
1/4”- 20 x 3/4”
Pan Head Screws
7/8”
2-3/4”
1/4”- 20 UNC-2B
Thread Through
1/4”- 20 UNC-2A
5/16”
2-7/8”
15/16”
2.75”
1/4”- 20 UNC-2B
3/4”
2.125 ” dia.
980-RING
980-BAR
980-SCREW
$"1
2.30”
5VC8BMM
Instrucciones de instalación:
1. Enrolle el extremo de los tornillos con cinta de
PTFE.
2. Coloque los tornillos a través del 980-RING
3A. Para instalación de desbordamiento de 2 oricios:
Enrosque los tornillos en el codo
superior hasta que queden rmes.
No lo apriete demasiado.
3B. Para la instalación de desbordamiento integral:
Enrosque los tornillos a través del anillo 980
En 980-BAR. Posición 980-BAR detrás de la
pared de la bañera con
980-RING dentro de la bañera. Apriete hasta
que esté rme.
No lo apriete demasiado.
4. Hilo en la cubierta.
Illusionary Overow
(No-Hole) Floating
Cover