Weil-McLain C-1013, AHE User manual

  • Hello! I am an AI chatbot trained to assist you with the Weil-McLain C-1013 User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Part number 550-141-887/0800
2
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
Hazard definitions
The following defined terms are used throughout this manual to bring attention to the presence of hazards of
various risk levels or to important information concerning the life of the product.
Indicates presence of hazards that will cause severe personal injury, death or substantial
property damage.
Indicates presence of hazards that can cause severe personal injury, death or substantial
property damage.
Indicates presence of hazards that will or can cause minor personal injury or property damage.
Indicates special instructions on installation, operation or maintenance that are important but
not related to personal injury or property damage.
Contents
Please read before proceeding .............................................................................. 3
Prepare boiler location ......................................................................................... 4-7
Venting ................................................................................................................ 8-13
Prepare boiler ........................................................................................................ 14
Water piping ..................................................................................................... 15-17
Gas piping ............................................................................................................. 18
Field wiring ............................................................................................................ 19
Jacket installation ................................................................................................. 19
Start-up.................................................................................................................. 20
Checkout procedure ............................................................................................. 21
Operation .......................................................................................................... 22-25
Service and maintenance ................................................................................ 26-31
Troubleshooting ................................................................................................ 32-41
Replacement parts ........................................................................................... 42-45
Dimensions ............................................................................................................ 46
Ratings ................................................................................................................... 47
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Part number 550-141-887/0800
3
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
Please read before proceeding
Installer
Read all instructions before
installing. Follow all instructions in
proper order to prevent personal
injury or death.
Consider piping and installation when determining
boiler location.
Any claims for damage or shortage in shipment
must be filed immediately against the
transportation company by the consignee.
User
This manual is for use only by your qualified
heating installer/service technician.
Please refer to the User’s Information Manual for
your reference.
We recommend regular service by a qualified
service technician, at least annually.
When calling or writing about the boiler— Please have the boiler model number from the
boiler rating label and the CP number from the boiler jacket. You may list the CP number in
the space provided on the Installation and service certificate found on page 21.
Failure to adhere to the guidelines on this page can result in severe personal injury, death
or substantial property damage.
When servicing boiler —
To avoid electric shock, disconnect electrical supply before performing maintenance.
To avoid severe burns, allow boiler to cool before performing maintenance.
Boiler operation —
Do not block flow of combustion or ventilation air to boiler.
Should overheating occur or gas supply fail to shut off, do not turn off or disconnect electrical supply to
circulator. Instead, shut off the gas supply at a location external to the appliance.
Do not use this boiler if any part has been under water. Immediately call a qualified service technician to
inspect the boiler and to replace any part of the control system and any gas control that has been under
water.
Boiler water —
Do not use petroleum-based cleaning or sealing compounds in boiler system. Water seal deterioration
will occur, causing leakage between sections. This can result in substantial property damage.
Do not use "homemade cures" or "boiler patent medicines". Serious damage to boiler, personnel and/or
property may result.
Continual fresh makeup water will reduce boiler life. Mineral buildup in sections reduces heat transfer,
overheats cast iron, and causes section failure. Addition of oxygen and other gases can cause internal
corrosion. Leaks in boiler or piping must be repaired at once to prevent makeup water.
Do not add cold water to hot boiler. Thermal shock can cause sections to crack.
Glycol — potential fire hazard —
All glycol is flammable when exposed to high temperatures. If glycol is allowed to accumulate in or around
the boiler or any other potential ignition source, a fire can develop. In order to prevent potential severe
personal injury, death or substantial property damage from fire and/or structural damage:
Never store glycol of any kind near the boiler or any potential ignition source.
Monitor and inspect the system and boiler regularly for leakage. Repair any leaks immediately to prevent
possible accumulation of glycol.
Never use automotive antifreeze or ethylene glycol in the system. Using these glycols can lead to hazardous
leakage of glycol in the boiler system.
Carbon monoxide detectors — Canada only
Installers must follow local regulations with respect to the installation of CO detectors and follow the
manufacturer’s stated maintenance schedule for this boiler.
Part number 550-141-887/0800
4
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
1a Prepare boiler location — codes & checklist
Installations must follow these codes:
Local, state, provincial and national codes, laws, regulations and ordinances.
National Fuel Gas Code, ANSI Z223/1–latest edition.
Standard for Controls and Safety Devices for Automatically Fired Boilers, ANSI/ASME
CSD-1 when required.
National Electrical Code.
Canada only B149.1 or B149.2 Installation Code, CSA C22.1 Canadian Electrical Code
Part 1 and any local codes.
The AHE boiler gas manifold and controls met safe lighting and other
performance criteria when boiler underwent tests specified in ANSI Z21.13–
latest edition.
Before locating the boiler, check the following:
1. Check for nearby connection to:
System water piping
Venting connections
Gas supply piping
Electrical power
2. Check area around boiler. Remove any combustible materials, gasoline and other flammable
liquids.
Failure to keep boiler area clear and free of combustible materials, gasoline
and other flammable liquids and vapors can result in severe personal injury,
death or substantial property damage.
3. Boiler must be installed so that gas control system components are protected from dripping
or spraying water or rain during operation or service.
4. If new boiler will replace existing boiler, check for and correct system problems, such as:
System leaks causing oxygen corrosion or section cracks from hard water deposits.
Lack of antifreeze in boiler water causing system and boiler to freeze and leak.
5. Boilers cannot be recessed into a wall.
6. Back vented boilers must be mounted on an outside wall.
Part number 550-141-887/0800
5
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
1b Prepare boiler location — clearances
Provide the following clearances:
1. Recommended minimum service clearances See
Table 1.
2. Recommended clearances for enclosed cabinet,
alcove or closet — See Table 1.
Flooring
Boiler must not be installed on or over carpeting.
Do not install boiler on carpeting
even if foundation is used. Fire can
result, causing severe personal
injury, death or substantial property
damage.
Residential garage installation
Take the following special precautions when installing
the boiler in a residential garage. If the boiler is located
in a residential garage, per ANSI Z223.1, paragraph
5.1.9:
Mount the boiler a minimum of 18 inches above
the floor of the garage to assure the burner and
ignition devices will be no less than 18 inches above
the floor.
Table 1 Recommended minimum clearances
Service
clearances
(Note 1)
Enclosed cabinet,
alcove or closet
clearances
Left side 1" 1"
Right side 6" 1"
Front 30" 1"
Top 3" 3"
Bottom 6" 6"
Note 1: If the suggested minimum clearances for service
cannot be met, the AHE boiler must be removed from the
wall for servicing. Piping will be disconnected. System
isolation valves and unions for the supply, return and
gas lines must be provided.
Part number 550-141-887/0800
6
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
1c Prepare boiler location vent system
When removing boiler from
existing common vent system:
At the time of removal of an existing boiler, the following
steps shall be followed with each appliance remaining
connected to the common venting system placed in
operation, while the other appliances remaining
connected to the common venting system are not in
operation.
a. Seal any unused openings in the common venting
system.
b. Visually inspect the venting system for proper size
and horizontal pitch and determine there is no
blockage or restriction, leakage, corrosion or other
deficiencies which could cause an unsafe condition.
c. Test vent system — Insofar as is practical, close all
building doors and windows, and all doors between
the space in which the appliances remaining
connected to the common venting system are
located, and other spaces of the building. Turn on
clothes dryers and any appliance not connected to
the common venting system. Turn on any exhaust
fans, such as range hoods and bathroom exhausts,
so they will operate at maximum speed. Do not
operate a summer exhaust fan. Close fireplace
dampers.
Wall thickness
See Table 2 below for wall thicknesses for venting.
Wall Sleeve Wall Thickness
Minimum Maximum
5" - 9" 5" 9"
9" - 13" 9" 13"
13" - 24" 13" 24"
d. Place in operation the appliance being inspected.
Follow the operating instructions. Adjust
thermostat so appliance will operate continuously.
e. Test for spillage at draft hood relief opening after 5
minutes of main burner operation. Use the flame
of a match or candle.
f. After it has been determined that each appliance
remaining connected to the common venting
system properly vents when tested as outlined
above, return doors, windows, exhaust fans,
fireplace dampers, and any other gas-burning
appliance to their previous conditions of use.
Any improper operation of common venting system
should be corrected so the installation conforms with
the National Fuel Gas Code, ANSI Z223.1–latest edition.
Correct by resizing to approach the minimum size as
determined using the appropriate tables in Part 11 of
that code. Canadian installations must comply with
B149.1 or B149.2 Installation Code.
Table 2
Part number 550-141-887/0800
7
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
1d
Prepare boiler location — air openings
Combustion air
Combustion air must be ducted directly from outside
to the AHE boiler air intake fitting. This method is
defined as direct vent” (also referred to as “sealed
combustion”). Refer to Section 2, page 8, in this manual
for venting instructions. Two options are available: side
venting and back venting.
Sizing air/ventilation openings
Provide openings in the boiler enclosure as described
below. Air is required for ventilation to prevent
overheating of boiler controls and boiler space. Air is
also required for combustion of other appliances if
located in the same space with an AHE boiler.
Provide adequate openings for
ventilation and combustion air as
required by the National Fuel Gas
Code to ensure proper combustion
and operation and to reduce the risk
of severe personal injury, death or
substantial property damage due to
insufficient air.
AHE with no other appliances in same
space
No special air/ventilation openings are required for AHE
installations provided the space is at least:
2,250 cubic feet total volume for AHE-45 or
3,000 cubic feet total volume for AHE-60.
For installations in spaces smaller than above (closet,
for example), provide two openings for ventilation air.
Each opening must be at least:
45 square inches for the AHE-45 or
60 square inches for the AHE-60.
Place one opening within 3 inches of the top of the
boiler, the other opening within 3 inches of the bottom
of the boiler.
AHE sharing space with other
appliances
Unless the space has a total volume of no less than 50
cubic feet for each 1,000 Btuh of total input of all
appliances:
1. Provide two openings into the space, each opening
providing at least 1 square inch free area per 1,000
Btuh of all appliances in the space. Locate one
opening within 12 inches of the ceiling, the other
opening within 12 inches of the floor.
2. For larger spaces (over 50 cubic feet total volume
per 1,000 Btuh of all appliances), no additional air
openings are required unless the space is
categorized as of “tight construction as defined
below.
Tight construction
ANSI Z223.1 defines unusually tight construction
where:
a. Walls and ceilings exposed to the outside
atmosphere have a continuous water vapor retarder
with a rating of 1 perm or less with openings
gasketed, and...
b. Weather-stripping has been added on openable
windows and doors, and...
c. Caulking or sealants are applied to areas such as
joints around windows and door frames, between
sole plates and floors, between wall-ceiling joints,
between wall panels, at penetrations for plumbing,
electrical, and gas lines, and in other openings.
For tight construction installations:
1. Provide two openings into the space, each opening
providing at least 1 square inch free area per 1,000
Btuh of all appliances in the space. Locate one
opening within 12 inches of the ceiling, the other
opening within 12 inches of the floor.
Louver allowance
The free area of openings means the area after reduction
for any installed louvers or grilles
. Be sure to consider
this reduction when sizing the air openings.
Exhaust fans and air movers
The appliance space must never be under a negative
pressure unless all appliances are installed as direct vent.
Always provide air openings sized not only to the
dimensions required for the firing rate of all appliances,
but also to handle the air movement rate of the exhaust
fans or air movers using air from the building or space.
Part number 550-141-887/0800
8
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
2a Venting — vent/air intake pre-installation
General information
Installations must comply with all
local, state and national codes
including National Fuel Gas Code,
ANSI Z223.1–latest edition.
Canadian installations must comply
with B149.1 or B149.2 Installation
Codes.
1. Two venting options are available for AHE boilers
— side venting and back venting.
2. Refer to Section 1, pages 4-7, of this manual
regarding requirements for:
vent system
clearances
air openings
Vent/air intake termination
1. Vent/air intake must not be obstructed.
Boiler will not operate if vent/air
intake is plugged. Be sure that the
vent/air intake is unobstructed to
avoid possibility of severe personal
injury, death or substantial property
damage.
2. Locate or guard the vent to prevent accidental
contact by people or pets.
3. Gases will form a white plume in winter. Plume
could obstruct window view of nearby windows in
multi-story buildings.
4. Prevailing winds could cause freezing of condensate
and water/ice buildup on buildings or plants.
5. Locate or guard vent termination to prevent
condensate from damaging exterior surfaces.
6. Do not terminate vent above any door or window.
Condensate can freeze, causing ice formations.
7. Do not terminate vent in window well or stairwell.
8. Vent must terminate:
a. AHE-45 9" from any opening where gases
could enter building.
b. AHE-60 12" from any opening where gases
could enter building.
c. Bottom of vent/air intake terminal 12"
above expected snowline.
d. Adjacent to public walkways not less than 7
feet above grade.
e. At least 4 feet horizontally (and in no case
above or below unless a 4 foot horizontal
distance is maintained) from electric meters,
gas meters, regulators, relief valves and other
equipment.
Wall preparation
1. Boilers cannot be recessed into a wall. Back vented
boilers must be mounted on an outside wall.
2. Boiler can be mounted directly on wall, but not on
or over carpeting, when conventional framing with
16" stud spacing available or wall is masonry.
Be sure wall structure will support
boiler and its piping. If wall does not
have 16-inch stud spacing or is not
masonry, provide solid mounting
surface. Use ½" plywood cut 26"
high and width large enough to
overlap two studs (minimum 22½"
width). Refer to dimensions table on
page 46 and note boiler weight.
Purchase 3" x
5
/
16
" toggle bolts to
anchor boiler to plywood.
3. See page 46 for boiler dimensions.
Part number 550-141-887/0800
9
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
2b Venting — side venting installation
Prepare mounting panel
Inside
Refer to Figure 3, below, and Figure 32, page 44. Choose
right or left instructions based on venting direction.
1. Remove right (or left) knockouts.
2. Remove right (or left) intake and exhaust cover
plates and discard.
3. Cut round opening in top exhaust gasket using new
cover plate as template. Attach gasket and cover
plate.
4. Seal back intake and exhaust holes by placing a
generous amount of silicone sealant on the back
side of the mounting panel around each opening.
See Figure 2.
5. Mount blank cover plate (provided) over openings
using (4) #10 x ½" Phillips screws (provided).
Figure 1 Side venting access to outside wall
88701
47½"
maximum
(including wall
thickness)
14" minimum
clearance to slide
panel over tubes
(right venting only)
6" min.
clearance to slide
panel over tubes
(left venting only)
38¼"
maximum
(including wall
thickness)
Exterior room wall
Exterior
room wall
Note: Tubes can be enclosed minimum of 1" clearance
from tubes to combustible material.
Select location
Review all connection, clearance and vent/air intake
considerations before selecting location. See Figure 1
for side venting clearance access to outside wall.
Continued next page...
Figure 3 Side venting mounting panel
1
1
2
2
3
3
4
4
88702
1
Exhaust cover plate and gasket (Factory-assembled on
mounting panel. Remove right or left for venting direction.)
2
Intake cover plate and gasket (Factory-assembled on
mounting panel. Remove right or left for venting direction.)
3
Supplied with boiler
4
Supplied with kit
Figure 2 Sealant application
Sealant must
be placed on
stainless steel portion of
exhaust (top) opening to
provide gas-tight seal. Failure
to seal holes gas-tight can
cause flue gas spillage and
carbon monoxide emissions,
resulting in severe personal
injury, death or substantial
property damage.
Silicone
sealant
88703
Part number 550-141-887/0800
10
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
6. Determine boiler location. See Manual Section 2a
on page 8 and “Select location on page 9.
Before installing boiler and venting,
inspect wall locations for
obstructing piping and electrical
supply. Failure to do so will result in
severe personal injury, death or
substantial property damage.
7. Level and tape mounting panel template to wall at
desired height between studs.
Center of mounting panel bolt holes
must be in line with 16" studs unless
extra support board is provided.
Refer to “Wall preparation on page
8. Failure to mount panel properly
can result in severe personal injury,
death or substantial property
damage.
8. To locate side wall vent:
a. Measure from floor to center line of top
exhaust tube on large template.
b. Subtract ¼" per foot of vent run from step “a.
Vent tubes must pitch down from boiler.
c. Level and tape small template on side wall.
Height of top exhaust center line is distance in
step “b”. Note correct “up position for right
or left side venting.
9. Mark location of vent/air intake opening through
template on side wall.
10. Remove template and cut opening in wall.
Outside
11. The following material is required:
a. outside wall plate assembly (see Figure 4 on
this page and Figure 8, page 11).
b. silicone sealant.
c. (4) #10 x 1¼" common screws (provided) or
(4) wall anchors (not provided) for masonry
wall only.
d. screwdriver.
e. drill with small bit (to start screws if necessary).
f. level.
12. Using outside wall plate as template, level and locate
mounting holes.
13. Place a generous amount of silicone sealant around
wall opening. See Figure 5, right and Figure 8 on
page 11.
14. Insert outside wall plate assembly into opening and
attach to wall.
2b Venting side venting installation con’t
Prepare mounting panel
continued
Figure 6 Measure tube lengths
Figure 5 Silicone sealant
Figure 4 Outside wall plate assembly
“UP”
88704
Silicone
sealant
88705
Opening
Exhaust tube
cutlines on template
Large template
Take
measurement
from birdguard
inside both
openings
88707
Part number 550-141-887/0800
11
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
2b Venting side venting installation con’t
Prepare mounting panel
continued
Inside
15. Insert wall sleeve (see Figure 32, item 1, page 44) into outside wall
plate assembly.
16. Measure tube lengths. See Figure 6 on page 10.
17. Cut tube lengths. Top tube will be longer than bottom tube.
18. Final location of boiler will be determined by proper slope to vent/air
intake tubes. Vent must slope downward from boiler ¼" per foot of
vent run to prevent outside moisture from draining into boiler. See
Figure 7, right.
19. Check vent tube slope:
a. Place top tube in top opening of outside wall plate (See Figure 32,
items 1 and 2 on page 44).
b. Measure from floor to bottom of tube at side wall.
c. Measure from floor to bottom of tube at plenum box end of tube.
d. Distance should differ ¼" per foot of vent run (length of top tube).
Adjust large template to locate bottom-of-tube mark at correct
slope.
e. Remove tube.
20. Drill stud holes in template. Remove template.
21. Apply generous bead of silicone sealant around insertion end of tubes,
1" from end of tube.
22. Place tubes in openings. See Figure 8.
23. Place inside wall plate (see Figure 32, page 44, item 3) over tubes, against
wall.
24. Slide mounting panel (Figure 32, page 44, item 5) over tubes. Tubes
will extend into plenum box openings.
25. Securing mounting panel to studs with (2)
5
/
16
" x 2¼" lag screws
provided. Use toggle bolts on plywood.
26. Place a continuous amount of silicone sealant around junctions of tubes
and plenum boxes. Also place sealant in four (4) screw holes where
blank cover plate was attached to the bottom (air intake) plenum box.
Smooth sealant to provide complete seal. See Figure 8.
27. Fasten inside wall plate, using (4) #10 x ½" screws provided.
Reassembly
When vent/air intake system is disconnected for any reason, reassemble
and reseal per this manual section.
Silicone sealant must be used where indicated. Vent/air
intake system must be sealed gas-tight to prevent
possibility of flue gas spillage and carbon monoxide
emissions, resulting in severe personal injury, death or
substantial property damage.
Figure 8 Side venting installation
Fasteners
Screws
88709
Silicone
sealant
Figure 7 Vent slope
88708
¼" slope down
per linear foot
Silicone sealant
Part number 550-141-887/0800
12
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
2c Venting — back venting installation
Prepare mounting panel
Inside
Inspect boiler wall location for obstructing piping and
electrical supply prior to drilling and boiler installation.
Failure to do so will cause severe personal injury, death
or substantial property damage.
1. Level and tape template to wall at desired height between wall studs
Center of mounting panel bolt holes must be in line
with 16" studs unless support board is provided. Refer
to “Wall preparation on page 8. Failure to mount panel
properly can result in severe personal injury, death or
substantial property damage.
2. Mark location on wall of vent/air intake opening (small rectangle in
template). Remove template.
3. Cut opening in wall.
Outside
4. Take the following materials outside:
a. outside wall plate assembly (see Figure 4 on page 11).
b. silicone sealant.
c. level.
d. (4) #10 x 1½" common screws (provided)
e. (4) wall anchors (not provided), for masonry walls only.
f. screwdriver.
g. drill with small bit (to start screws if necessary).
5. Using plate as template, level, locate and start mounting holes.
6. Place a generous amount of silicone sealant around vent/air intake
opening. See Figure 5, page 11.
7. Insert outside wall plate assembly into opening and attach to wall.
Part number 550-141-887/0800
13
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
2c Venting — back venting installation con’t
Prepare mounting panel
continued
Inside
8. Insert inside cover plate assembly into opening.
Inside wall sleeve fits into outside wall sleeve. “Up
stamp must be up.
9. Insert tube into top opening, until it stops. Mark
length ½" longer than plate. Cut tube.
10. Repeat step 9 for lower tube.
11. Remove inside cover plate assembly.
12. Apply generous bead of silicone sealant around
insertion end of tubes, 1" from end of tube.
Silicone sealant must be used where
indicated. Vent/air intake system
must be sealed gas-tight to prevent
possibility of flue gas spillage and
carbon monoxide emissions,
resulting in severe personal injury,
death or substantial property
damage.
13. Insert longer tube in top opening of outside plate,
shorter tube in bottom opening. See Figure 9.
14. Fit inside wall plate into opening. See step 8, above.
Tubes should protrude from plate. Do not fasten
plate to wall. See Figure 9.
15. Apply continuous bead of silicone sealant around
junctions of tubes and inside cover plate. Smooth
sealant to provide thorough seal. See Figure 10.
16. Using mounting panel as template, align (2)
plenum box openings over intake and exhaust
tubes. Level and mark location of (2) lag screw
holes. Drill (2)
3
/
16
" holes.
17. Hang mounting panel. Use (2)
5
/
16
" x 2¼" lag screws
provided. Use toggle bolts on plywood.
Reassembly
When vent/air intake system is disconnected for any
reason, reassemble and reseal per this manual section.
Silicone sealant must be used where
indicated. Vent/air intake system
must be sealed gas-tight to prevent
possibility of flue gas spillage and
carbon monoxide emissions,
resulting in severe personal injury,
death or substantial property
damage.
Figure 9 Back venting installation
Fasteners
88710
Silicone
sealant
Sealant
Sealant
½"
Sealant
Silicone
sealant
Screw
Screw
Figure 10 Inside cover plate
Silicone sealant
88711
Part number 550-141-887/0800
14
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
3 Prepare boiler — placement and setup
Hang boiler on mounting panel
1. Remove crate top and wrapper. Leave bottom skid
attached to boiler to aid hanging boiler.
2. Cut bottom shipping strap located around boiler
base. Do not cut upper strap.
3. Place generous amount of silicone sealant around
plenum box openings on mounting panel. Set
gaskets (provided) in place. See Figure 11.
4. Carefully lift and hang boiler on mounting panel
hooks. Boiler hanger holes are located on upper
boiler back. Bottom skid may be adjusted to allow
boiler to hang on hooks.
Boiler is heavy. Care must be taken
to prevent personal injury or
damage to boiler.
5. Cut upper strap. Remove skid.
6. Fasten cotter pin in hole located in left mounting
panel hook to prevent boiler from lifting off hooks.
7. Use (1) #10 x ½" Phillips screw with holding bracket
to secure boiler. See Figure 11.
Inspect orifices and burners
1. Remove burner inlet plenum cover (see Figure 30,
item 9, page 42).
2. Carefully remove ignitor and ignitor gasket. Use
caution — ignitor is brittle and can break.
Wait several minutes until ignitor
cools down before removing. Failure
to do so will cause severe personal
injury.
3. Check for correctly-size burner orifices. See Table
3 for sizing. (The orifice size is stamped on the
orifice spud barrel.)
Correctly-sized manifold orifices
must be used. Failure to do so will
result in severe personal injury,
death or substantial property
damage.
4. Replace ignitor, ignitor gasket and burner inlet
plenum cover.
Figure 11
88706
Cotter pin
Holding bracket and screw (1)
1
1
1
2
2
2
2
Supplied with boiler
(in envelope)
Attached per venting instructions,
Manual Section 2
Table 3 Manifold orifice sizing
Location Natural gas Propane gas
U.S.
0-2,000 ft. over 2,000 ft. 0-2,000 ft. over 2,000 ft.
#48 (see Note) 1.15 mm (see Note)
Canada
0-2,000 ft. 2,000-4,500 ft. 0-2,000 ft. 2,000-4,500 ft.
#48 #49 1.15 mm #58
Note: For elevations above 2,000 feet, contact your local Weil-
McLain sales office for details.
Part number 550-141-887/0800
15
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
4a Water piping general information
Expansion tank
1. A correctly-sized diaphragm-type expansion tank
must be provided. Ensure expansion tank will
handle boiler and system water volume and
temperature.
2. Follow tank manufacturer’s sizing procedure to
determine proper size.
3. Locate expansion tank as shown in Figure 12.
External heat exchangers
AHE boilers can be used with storage tank/heat
exchanger unit for domestic hot water. Boiler/tank
combination should be installed and wired in
accordance with tank manufacturer’s instructions,
which will also show any additional components
required. A zone valve must be installed to regulate
production of hot water.
General piping information
1. Pipe as shown in Figure 12. Refer to I=B=R
Installation and Piping Guides for additional
recommendations.
2. If system is to comply with ASME or Canadian
requirements, an additional high temperature limit
is needed. Install control in supply outlet piping
close to the boiler. See page 23 for wiring.
3. A low water cutoff device is required for hot water
boilers installed above radiation level or by certain
state or local codes or insurance companies. Block
temperature switch, installed as standard
equipment on the boiler, monitors surface
temperature, causing gas controls to shut down
should low water condition occur.
4. Install cold water fill as shown in Figure 12.
5. Where heat distributing units are below boiler,
provide a drain valve at low point in system.
6. Use zone valves for multiple zone applications.
Refer to manufacturer’s literature for wiring and
application.
To avoid water damage or scalding
due to relief valve operation:
Discharge line must be connected to relief valve
outlet and run to a safe place of disposal. Terminate
the discharge line to eliminate possibility of severe
burns should the valve discharge.
Discharge line must be as short as possible and be
the same size as the valve discharge connection
throughout its entire length.
Discharge line must pitch downward from the valve
and terminate at least 6" above the floor drain
where any discharge will be clearly visible.
The discharge line shall terminate plain, not
threaded, with a material serviceable for
temperatures of 375 °F or greater.
Do not pipe the discharge to any place where
freezing could occur.
No shutoff valve shall be installed between the relief
valve and boiler, or in the discharge line. Do not
plug or place any obstruction in the discharge line.
Failure to comply with the above guidelines could
result in failure of the relief valve to operate,
resulting in possibility of severe personal injury,
death or substantial property damage.
Test the operation of the valve after filling and
pressurizing system by lifting the lever. Make sure
the valve discharges freely. If the valve fails to
operate correctly, replace it with a new relief valve.
Relief valve
Verify relief valve is installed with spindle in vertical
position. See Figure 33, item 1, page 45 and the tag
attached to the relief valve for manufacturer’s
instructions.
Figure 12 Water piping diagram
Cold water fill
Expansion
tank
To system From system
Shutoff valves
Drain valves
Supply
Return
Note: Use zone valves in each circuit for multiple circuit applications.
88712
Part number 550-141-887/0800
16
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
4b Water piping — low temp systems
Figure 13 Low temp boiler-bypass piping
Low water temperature boiler-
bypass piping
1. Do not use conventional bypass piping on radiant
panel systems or systems requiring water
temperature lower than boiler temperature. For
these systems, follow piping diagram shown in
Figure 13.
2. Adjust valves to maintain system supply and return
at design temperature.
Water treatment
See WARNING on page 3 for important information
regarding boiler water.
For unusually hard water areas or low pH water
conditions (below 7.0) consult local water treatment
company.
Freeze protection
See WARNING on page 3 for important information
regarding glycol hazard.
Do not use ethylene glycol,
automotive or undiluted antifreeze.
Severe personal injury or death can
result.
4a Water piping general information con’t
1. Determine antifreeze quantity according to system
water content. Boiler water content is listed on page
47.
2. Follow antifreeze manufacturer’s instructions.
3. A 50% solution of propylene glycol/water provides
maximum protection to about -30 °F. Do no exceed
50% solution.
4. Local codes may require a back flow preventer or
actual disconnect from city water supply.
5. When using antifreeze in a system with automatic
fill, install a water meter to monitor water makeup.
Glycol will leak before the water begins to leak,
causing glycol level to drop. Added water will dilute
the antifreeze, reducing the freeze protection level.
To system From system
Thermometer
Balancing valve
Boiler
Supply
Return
Auxiliary pump
88713
Part number 550-141-887/0800
17
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
4d Water piping — pressure test
Perform hydrostatic pressure
test
Pressure test boiler before attaching gas piping or
electrical supply.
1. Close shutoff valves between boiler and system.
Remove air vent cap on top of boiler and open air
vent on circulator/mixing valve 2 full turns.
2. Feed water into the boiler through cold water fill
Do not exceed 45 psig. Boiler is filled and air
is vented when boiler air vent valve is depressed
and water spurts from valve. Screw cap back on air
vent on boiler and close air vent on circulator/
mixing valve completely, then open both one full
turn. Turn off cold water fill.
3. Test at 45 psig for more than 10 minutes.
Do not leave boiler unattended.
Cold water fill could expand and
cause excess pressure, resulting in
severe personal injury, death or
substantial property damage.
4. Make sure constant gauge pressure has been
maintained throughout test. Check for leaks. Repair
if found.
Leaks must be repaired at once.
Failure to do so can damage boiler,
resulting in substantial property
damage.
Do not use petroleum-based
cleaning or sealing compounds in
boiler system. Severe damage to
boiler will occur, resulting in
substantial property damage.
5. With shutoff valves still closed, attach hose adapter
and hose to one drain valve and discharge water
through other drain valve until no air is present.
Use line water pressure.
6. Close both drain valves. Remove hose and adapter.
7. Open cold water fill. Fill pressure should be
between 30-40 psig
.
8. Open shutoff valves.
4c Water piping — refrigeration systems
Prevent chilled water from
entering boiler
Install boiler so that chilled medium is piped in parallel
with the heating boiler. Use appropriate valves to prevent
chilled medium from entering boiler. See Figure 14 for
typical installation of balancing valve and check valve.
If boiler is connected to heating coils located in air
handling units where they can be exposed to refrigerated
air, use flow control valves or other automatic means to
prevent gravity circulation during cooling cycle.
Figure 14 Piping refrigeration systems
Part number 550-141-887/0800
18
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
Natural gas piping
1. Refer to Table 4 for pipe length and diameter. Base
on rated boiler input (divide by 1,000 to obtain
cubic feet per hour). Table 4 is only for gas with
specific gravity, 0.06, with a pressure drop through
the gas piping of 0.03" w.c. For additional gas pipe
sizing information, refer to ANSI Z223.1 (or B149.1
or B149.2 for Canadian installations).
2. Inlet gas pressure:
maximum: 13" w.c.
minimum: 5" w.c.
manifold pressure: 3½" w.c.
3. Install 100% lockup gas pressure regulator in supply
line if inlet pressure exceeds 13" w.c. Adjust for 13"
w.c. maximum.
Propane gas piping
1. Contact gas supplier to size pipes, tanks and 100%
lockup gas pressure regulator.
2. Adjust propane supply regulator provided by gas
supplier for 13" w.c. maximum pressure.
2. Inlet gas pressure:
maximum: 13" w.c.
minimum: 11" w.c.
manifold pressure: 10" w.c.
3. Install 100% lockup gas pressure regulator in supply
line if inlet pressure exceeds 13" w.c. Adjust for 13"
w.c. maximum.
Connecting gas piping to boiler
1. Refer to Figure 15 for recommended gas piping.
2. Use pipe dope compatible with propane gases.
Apply sparingly only to male threads of pipe joints
so that pipe dope does not block gas flow.
Failure to apply pipe dope as
detailed above can result in severe
personal injury, death or substantial
property damage.
3. Install drip leg at inlet of gas connection to boiler.
See Figure 15. Where local utility requires drip leg
to be extended to the floor, use appropriate length
of pipe between cap and tee.
4. Install manual main shutoff gas valve and ground
joint union in gas piping according to local utility
requirements.
5. In Canada, when using manual main shutoff gas
valve, it must be identified by the installer.
6. Support piping with hangers, not by boiler or its
accessories.
7. Purge all air from gas supply piping.
8. Before placing boiler in operation, check boiler and
its gas connection for leaks.
Do not check for gas leaks with open
flame use bubble test. Failure to
use bubble test or check for gas leaks
can cause severe personal injury,
death or substantial property
damage.
a. Close manual main shutoff valve during any
pressure test less than 13" w.c.
b. Disconnect boiler and gas valve from supply
piping during any pressure test greater than
13" w.c.
5 Gas piping
Table 4
Pipe capacity for 0.60 specific gravity natural gas
Figure 15 Gas supply piping
Length of
pipe
(feet)
Capacity of pipe
(in cubic feet of gas per hour)
½"
¾" 1"
10 132 278 520
20 92 190 350
30 73 152 285
40 63 130 245
50 56 115 215
75 45 93 175
100 38 79 150
150 31 64 120
Boiler
Nipple
Nipple
Manual main shutoff
gas valve
Tee
Ground joint union
Nipple
Drip leg
Cap
Gas supply
88715
Supply
Return
Part number 550-141-887/0800
19
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
6 Field wiring
For your safety, turn off electrical
power supply at service entrance
panel before making any electrical
connections to avoid possible shock
hazard. Failure to do so can cause
severe personal injury or death.
Wiring must be N.E.C. Class 1.
Boiler must be electrically grounded
as required by National Electrical
Code ANSI/NFPA 70–latest edition.
If original wiring as supplied with
boiler must be replaced, use only
type 105 °C wire or equivalent.
If original rollout thermal fuse
element wire as supplied with boiler
must be replaced, type 200 °C wire
or equivalent must be used.
Electrical installation must
comply with:
1. National Electrical Code and any other national,
state, provincial or local codes or regulations.
2. In Canada, CSA C22.1 Canadian Electrical Code
Part 1, and any local codes.
Wiring connections
Boiler is shipped with controls completely wired.
Electrical supply to boiler should be a separate branch
circuit with a fused disconnect (15 amp.).
Wire electric supply to supply leads in junction box.
Refer to wiring diagram inside jacket door or on page
23.
For addition of zone valves to system, a separate
transformer is required to power zone valves. Refer to
manufacturer’s recommendations for sizing
requirements and wiring recommendations. Zoning
with circulators requires a relay for each circuit.
Thermostat
1. Connect thermostat to control wire harness inside
boiler, as shown on wiring diagram inside jacket
door, or manual page 23.
2. Install on inside wall away from influences of drafts,
hot or cold water pipes, lighting fixtures, television,
sunrays, or fireplaces.
3. If thermostat has a heat anticipator, set heat
anticipator in thermostat to match power
requirements of equipment connected to it. Refer
to wiring diagram on jacket door. For multiple
zoning, set the heat anticipator to match the current
draw of the zone valve.
7 Jacket installation
Assemble jacket as shown in Figure 31, page 43,
using the appropriate Jacket Assembly Carton for
your boiler model.
Mounting
1. Bend corner tabs on mounting panel toward boiler.
2. Slide jacket assembly (without front panel) over
mounted boiler.
3. Upper back lip hooks over top of mounting panel.
4. Jacket swings toward mounting panel and snaps
into place.
5. Slide front panel upper lip under grill. Place against
side panels. Slide down until lower lip hooks behind
bottom panel edge.
Part number 550-141-887/0800
20
AHE Series 4 Direct Vent Wall-Mounted Boilers — Boiler Manual
8a Start-up
Final check before starting
boiler
Boiler water
Review Manual Section 4, pages 15 through 17,
regarding water piping, treatment, freeze protection and
system pressure testing.
Verify boiler is filled with water.
Check for gas leaks
Before starting the boiler and during
initial operation, smell near the floor
and around the boiler for gas
odorant or any unusual odor. Do not
proceed with start-up if there is any
indication of a gas leak. Repair any
leak at once.
Propane boilers only Your
propane supplier mixes an odorant
with the propane to make its
presence detectable. In some
instances, the odorant can fade, and
the gas may no longer have an odor.
Before start-up (and periodically
thereafter), have the propane
supplier verify the correct odorant
level in the gas.
Start the boiler
Follow the “Operating instructions” found on pages 24-
25 to start the boiler. Refer to Section 8b, below, if boiler
fails to start.
Check burner flames
1. Refer to Figure 30, item 9 on page 42. Remove
burner input plenum cover.
2. Visually inspect burner flames:
Proper main burner flame (see Figure 16):
a. Yellow-orange streaks may appear (caused
by dust).
Improper main burner flame:
a. Overfired — Large flames.
b. Underfired — Small flames.
c. Lack of primary air Yellow tipping on
flames (sooting will occur).
Figure 16 Typical main burner flame
26024
Transparent
blue flame
Inner flame
8b Start-up — if boiler fails to start...
Check for:
1. Loose connections, blown fuse or service switch?
2. High limit switch set below boiler water
temperature?
3. Thermostat set below room temperature?
4. Gas not turned on at meter?
5. Gas not turned on at boiler (manual main shutoff
and gas valve)?
6. Incoming gas pressure less than:
5" w.c. for natural gas?
11" w.c. for propane gas?
If none of the above corrects the problem, refer to
“Troubleshooting section, pages 32-41.
/