H3C S9500E Series Quick start guide

  • Hello! I am an AI chatbot trained to assist you with the H3C S9500E Series Quick start guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1
H3C S9500E Series Routing Switches
Quick Start Guide
Hangzhou H3C Technologies Co., Ltd.
http://www.h3c.com
2
Copyright © 2003-2010, Hangzhou H3C Technologies Co., Ltd. and its licensors
All Rights Reserved
No part of this manual may be reproduced or transmitted in any form or by any means without
prior written consent of Hangzhou H3C Technologies Co., Ltd.
Trademarks
H3C, , Aolynk, , H
3
Care,
, TOP G, , IRF, NetPilot, Neocean,
NeoVTL, SecPro, SecPoint, SecEngine, SecPath, Comware, Secware, Storware, NQA, VVG,
V
2
G, V
n
G, PSPT, XGbus, N-Bus, TiGem, InnoVision and HUASAN are trademarks of Hangzhou
H3C Technologies Co., Ltd.
All other trademarks that may be mentioned in this manual are the property of their respective
owners.
Notice
The information in this document is subject to change without notice. Every effort has been made
in the preparation of this document to ensure accuracy of the contents, but all statements,
information, and recommendations in this document do not constitute the warranty of any kind,
express or implied.
Environmental Protection
This product has been designed to comply with the requirements on environmental protection. The
storage, use, and disposal of this product must meet the applicable national laws and
regulations.
3
S9500E Installation Quick Start Guide
About this guide
This guide provides steps for basic installation and configuration for the S9500E series. Further
information, such as optional installation and configuration procedures are available in the
S9500E Installation Guide.
Product overview
The S9500E series include the following models:
S9505E:The S9505E provides five line processing unit (LPU) slots and two MPU slots,
horizontal
S9508E-V:The S9508E-V provides eight LPU slots and two main processing units (MPU)
slots, vertical
S9512E:The S9512E provides twelve LPU slots and two MPU slots, horizontal
Prepare for installation
Safety recommendations
To avoid possible bodily injury and equipment damage, read the following safety
recommendations before installing an H3C S9500E switch. Note that the recommendations do
not cover every possible hazardous condition.
Take adequate safety measures to avoid injury and switch damage.
Make sure that the ground is dry and flat and anti-slip measures are in place.
Keep the chassis clean and dust-free.
Do not place the switch in a moist area and avoid liquid surrounding the switch.
Keep the chassis and installation tools away from walkways.
Multiple people should move the switch and heavy components.
Examine the installation site
The H3C S9500E series can only be used indoors. Make sure that the floor can support the
weight of the switch and its accessories.
To ensure the normal operation of the switch, ensure that the following elements meet
requirements described in “Preparing for installation” in the S9500E Installation Guide: room
temperature; humidity, cleanness; EMS; grounding; power supply; space; and cabinet-mounting.
4
Installation tools
Table 1 Required installation tools
Category Tool
Measure and
lineation tools
Long tape, ruler (1 meter in length), gradienter, marking pen, powder marker, pencil
Drills One percussion drill, several drill bits, one vacuum cleaner
Fastening tools
Plain screwdriver P4 - 75 mm
Cross-head screwdriver P1 – 100 mm, P2 – 150 mm and P3 – 250 mm
Box wrench M5
Ring spanner M6
Double ring spanner (10-12) or open ended spanner (10-12)
Small tools
Sharp-nose pliers, diagonal pliers, vices, hand-held electric drill, file, handsaw,
crowbar, rubber hammer
Auxiliary tools Brush, tweezers, paper knife, hand bellows, electric iron, solder wire, fork, ladder
Special tools
ESD-preventive wrist strap, cable stripper, crimping pliers, RJ-45 crimping pliers, wire
punch-down tool
Meters
Multimeter, 500 V Meg-ohmmeter (used for measuring the insulation resistance), error
detector, optical power meter, earth resistance tester
The instruments and tools are not shipped with the S9500E series.
Install the switch
This guide provides basic installation steps. See the S9500E Installation Guide for comprehensive
procedures for installing the switch.
To avoid bodily injury, do not touch any wire, terminal, or part marked with a high-voltage hazard sign.
5
Installation workflow
Figure 1 Installation flow of the switch
Install the switch on a rack
This S12500 Quick Start Guide provides steps to install the switch on a rack. The S12500
Installation Guide also provides steps to install the S12500 on a workbench.
This section explains how to install mounting and cable management brackets for the S9505E
and S9512E. See the S9500E Installation Guide for steps on installing the mounting brackets and
cable management brackets for the S9508E-V.
Preparation
Check that the cabinet is well grounded and secured. Make sure the layout inside the rack
for the switch installation is done and there is no debris left inside or around the cabinet.
There is enough space around the cabinet for heat-dissipation.
Install the mounting brackets and cable management brackets for the S9505E and S9512E
1. Install the cable management brackets on the mounting brackets with tapping screws.
6
2.
Attach the mounting brackets onto the left and right sides of the switch, as shown in Figure
2.
Figure 2 Install the mounting brackets and cable management brackets
(1) Mounting brackets (2) Cable management bracket (3) Mounting screws
Install the switch in the rack
1. Place the switch on the support tray and slide the switch along the slide rails until the
mounting brackets on the switch reach the rack posts.
2. Use mounting screws to fix the mounting brackets to the rack posts.
Connect the PGND cable
The switch must be well grounded. The resistance reading between switch chassis and the ground must be
less than 1 ohm.
Connection in generic grounding environment
This section describes connecting in a generic grounding environment. See the S9500 Installation
Guide for methods for grounding the switch in different grounding environments.
1. Remove the screw from the grounding hole on the switch chassis.
2. Put the supplied OT terminal of the PGND cable on the grounding screw.
3. Insert the grounding screw into the grounding hole and screw it down.
4. Connect the other end of the PGND cable to the grounding strip of the cabinet.
7
Install a power system
See the S9500 Installation Guide for instructions for installing a power system.
Install a card
Before installing a card, follow these preparations.
1. Put on an ESD-preventive wrist strap and make sure that the wrist strap is properly
grounded.
2. Remove the blank panel (if any) from the slot to be used.
3. Prepare the card to be installed.
Follow these steps to install a card:
1. Move the ejector levers outwards, hold the module by the handle, and push the board into
the slot along slide rails slowly.
2. Push the ejector levers inward to ensure a firm contact between the board and the
backplane.
3. Position the screws into the holes and fasten them with a screwdriver to fix the board.
Install a fan tray
This guide provides steps to install a fan tray for an S9505E or S9512E. See the S9500E
Installation Guide for steps to install a fan tray for an S9508E-V
1. Put on an ESD-preventive wrist strap and make sure the wrist strap is well grounded.
2. Push the fan tray along the guide rails until it has a good contact with the backplane.
3. Fasten the screws on the fan tray panel.
Log in to the switch
Connect the console cable
This section provides information on connecting the console cable. See the S9500E Installation
Guide for information on connecting the AUX cable, network cables and optical fibers.
1. Plug the DB-9 female connector of the console cable to the serial port of the PC or terminal
where the switch is to be configured.
2. Connect the RJ-45 connector of the console cable to the console port of the switch.
Set up a configuration environment
1. Launch a terminal emulation utility. Select Start > Programs > Accessories >
Communications > HyperTerminal to access the HyperTerminal window. Click
in
the window to set up a new connection. The Connection Description dialog box
appears.
8
2.
Enter the name of the new connection in the Connection Description dialog box, and
click OK. Select a port from the Connect using drop-down list.
3. Set serial port parameters. Set the bits per second to 9600, data bits to 8, parity to None,
stop bits to 1, and flow control to None.
4. Click OK to enter the HypterTerminal window,
5. Select File > Properties in the HyperTerminal window to access the Properties window.
Click Settings in the Window, select VT100 for terminal emulation, and click OK.
Power on the switch
To power on the switch, perform the following steps:
1. Turn on the power switch of the power source providing power to the switch.
2. Turn on the power switch of the PWR on the switch.
H3C recommends that you check the following conditions after the switch is powered on:
The cooling system is working (you can hear the noise caused by fan rotation and feel air
exhausted out.)
All the system LEDs on the MPUs function normally.
All the LEDs on the PSUs function normally. Input LED IN and output LED OUT is on, and the
fault LED FAIL is off.
Verify the installation
Make sure that you have turned off the power before checking the installation to avoid bodily injury and
device damage.
After installing the switch, verify the installation against the following list. For the successful
installation, all items must be normal.
Table 2 Installation checklist
Item
Result
Remarks
Yes No
The PGND cable is correctly grounded.
Fan trays are correctly installed and have a tight contact
with the backplane.
PSUs are correctly installed and have a good contact with
the frames.
Power cords are correctly connected.
MPUs are correctly installed and have a good contact
with the backplane.
9
Item
Result
Remarks
Yes No
Interface cards are correctly installed and have a good
contact with the backplane.
The console cable is correctly connected.
/