8
2.
Enter the name of the new connection in the Connection Description dialog box, and
click OK. Select a port from the Connect using drop-down list.
3. Set serial port parameters. Set the bits per second to 9600, data bits to 8, parity to None,
stop bits to 1, and flow control to None.
4. Click OK to enter the HypterTerminal window,
5. Select File > Properties in the HyperTerminal window to access the Properties window.
Click Settings in the Window, select VT100 for terminal emulation, and click OK.
Power on the switch
To power on the switch, perform the following steps:
1. Turn on the power switch of the power source providing power to the switch.
2. Turn on the power switch of the PWR on the switch.
H3C recommends that you check the following conditions after the switch is powered on:
• The cooling system is working (you can hear the noise caused by fan rotation and feel air
exhausted out.)
• All the system LEDs on the MPUs function normally.
• All the LEDs on the PSUs function normally. Input LED IN and output LED OUT is on, and the
fault LED FAIL is off.
Verify the installation
Make sure that you have turned off the power before checking the installation to avoid bodily injury and
device damage.
After installing the switch, verify the installation against the following list. For the successful
installation, all items must be normal.
Table 2 Installation checklist
Item
Result
Remarks
Yes No
The PGND cable is correctly grounded.
Fan trays are correctly installed and have a tight contact
with the backplane.
PSUs are correctly installed and have a good contact with
the frames.
Power cords are correctly connected.
MPUs are correctly installed and have a good contact
with the backplane.