Centrometal Cm Pelet-set Touch Technical Instructions

Type
Technical Instructions
HEATING TECHNIQUE
Centrometal d.o.o. - Glavna 12, 40306 Macinec, Croatia, tel: +385 40 372 600, fax: +385 40 372 611
Controller
CPREG-Touch - USER
READY
TU-R-CPREG-T-04-2023-v1.26dT3-ENG
THE FIRST COMMISSIONING MUST BE CARRIED OUT BY AN AUTHORIZED
PERSON, OTHERWISE THE PRODUCT WARRANTY IS NOT VALID.
BOOK 2/2
EKO-CK P + Cm pelet-set 14-90
EKO-CKB P + Cm pelet-set 14-50
Technical manual
ENG
CPREG-Touch
Important
Technical instructions CONTROLLER - CPREG-Touch
2
These instructions are an integral part of this product. All rights reserved.
Reproduction of content of this document and transfer to third parties is
not allowed without written approval from manufacturer.
Make sure the instructions are always with the device, even if its sale /
transfer of another owner to the user or staff authorized for maintenance
or repairs to consult.
i
READ THESE INSTRUCTIONS CAREFULLY BEFORE
INSTALLING THE BOILER TO HEATING SYSTEM.
!
!
Boiler must not be used by children or disabled persons (either
physically or mentally), as well as by person without knowledge or
experience, unless they are under control or trained by s person
responsible for their safety. Children must be supervised in the
vicinity of the product.
!Boiler must not operate in flammable and explosive environment.
!Before any work on the boiler, electric energy must be switched off.
!
Please note that the installation can only be performed by a qualified
heating contractor or service organization. Any work on electrical
and fuel carrying components must be done by a qualified service
technician.
Commissioning and maintenance can only be performed by a
authorized service center. Any work on electrical and fuel carrying
components must be done by a qualified service technician.
Introduction
Boiler controller components used by a user:
Touchscreen with
bicolour LED
Main switch (0/1)
switches the boiler
ON / OFF
Safety thermostat
UTP cable connector
INTRODUCTION
CPREG-Touch Digital controller is an integral part of pellet heating equipment EKO-CK (B) P + Cm
Pellet-set. It is installed on boilers EKO-CK P and EKO-CKB P and is connected to pellet burners
CPPL 14-90 kW which leads as needed for heating and preparation of domestic hot water (DHW).
Boiler control CPREG-Touch characteristics:
microprocessor control, safety thermostat, safety pressure, microswitch for lower boiler door,
controller turns the burner ON and OFF according to set temperatures and operating modes,
regulates the pellet supply via the pellet feeder, operation according to (heating and DHW) or (only
DHW) mode, notes the current boiler status on the screen, error writings on the screen
Technical instructions CONTROLLER - CPREG-Touch 3
EQUIPMENT COMPONENTS FOR PELLET BURNINGS
CM PELET-SET
Legend:
0. pellet burner CPPL-14 (only for EKO-CK P 20)
1. pellet burner:
- CPPL-35 (for boilers EKO-CK P / EKO-CKB P 25-40, CK / EKO-CKB 20-40),
- CPPL 50 (for boilers EKO-CK P / EKO-CKB P 40-50, CK / EKO-CKB 40-50)
2. pipe fitting for connecting the flexible pellet supply pipe
3. backfilling sensor / temperature gauge on inlet tube that
is installed tube for connecting of pellet feeding flexible
tube (backfilling sensor is detailed in the
Technical instructions for use and maintenance)
4. burner cover
5. plastic and silicone pressure switch pipe
6. feeder with electric motor CPPT CPPT / CPPT-50
7. pellet feeder flexible tube
8. pellet tank CPSP
9. cover of opening for filling the pellet tank
10. lower lid for tank cleaning
11. opening for pellet feeder
12. openings for tank cleaning
13.a) set for installation of pellet burner (only new boiler models)
13.b) lower boiler door adapted for pellet burner CPDV
(for boilers EKO-CK P / EKO-CKB P (EKO-CK/CKB))
(only old boiler models)
14. connector for pressure switch silicone pipe on the lower boiler door CPDV
15. boiler control unit CPREG-Touch
16. micro switch for lower boiler door
17. ceramic nozzle (only CPPL-14)
220
260
220 (CPPL-35)
260 (CPPL-50)
CPPL-35
CPPL-50
80°C
120°C
0%
1700
15k
30%
60°C
70°C
50°C
55°C
Equipment components
Technical instructions CONTROLLER - CPREG-Touch
4
Legend:
1. pellet burner CPPL-90
2. tube for conne cting of pellet feeding flexible tube
3. flame tube extension
4. Backfilling sensor / temperature gauge on inlet tub e that
is installed tube for connecting of pellet feeding flexible
tube (backfilling sensor is detailed in the Technical instructions
for use and maintenance)
5. burner cover
6. plastic and silicone pressure switch pipe
7. feeder with electric motor CPPT-90
8. pellet feeder flexible tube
9. pelet tank CPSP-800
10. cover of opening for filling the pellet tank
11. lower lid for tank cleaning
12. opening for pellet feeder
13. openings for tank cleaning
15. connector for pressure switch silicone pipe on the lower boiler door CPDV
16. boiler control unit CPREG-Touch
17. micro switch for lower boiler door
400 370
240
370
3
14. a) set for installation of pellet burner (only new boiler models)
14. b) lower boiler door adapted for pellet burner CPDV 60/70
for burner CPPL-90 (for boilers EKO-CK P 60 and 70) and CPDV 90/110
(for boilers EKO-CK P 90) (only old boiler models)
b
14a
80°C
120°C
0%
1700
15k
30%
60°C
70°C
50°C
55°C
Technical instructions CONTROLLER - CPREG-Touch 5
Equipment components
Status of delivery, additional equipment
STATUS OF DELIVERY
ADDITIONAL EQUIPMENT
- temperature sensors PT1000 (2 pcs. for storage tank, 2 pcs. flow line,
1 pcs. domestic hot water and 1 pcs. outdoor sensor)
- code key (14kW / 20-35kW / 40-50kW / 60-90kW), in a nylon bag (an authorized service
technician must install the correct code key depending on the burner power to which the
CPREG-Touch control is connected))
Temperature sensors that come with controller:
- 1 x sensor boiler (PT 1000)-PVC, factory installed
- 1 x outdoor sensor (PT 1000), in its own cardboard box
- 5 x sensor (PT 1000)-PVC, (including 2 x (PVC handhold, PVC shoelace, paste for mounting
sensors on the pipe)), in a nylon bag
Safety thermostat (STB) (factory installed to the controller):
- STB thermostat switch-off temperature 110-9 °C
CAL set
for alarm
(speaker /
light )
CM2K modul
for steering
2+ heating
circuits
CMNET module
for steering the
boiler cascades
GSM module
for the alarm
alert by mobile
network
Vacuum
supply of
pellets
Cm Wifi-box
(Internet
boiler operation
monitoring)
- air cleaning
- burner flap (14-50)
- pellet level sensor in the tank CPSP / CPSP 70-110
Technical instructions CONTROLLER - CPREG-Touch
6
Room corrector
(CSK-Touch)
Room corrector
(CSK)
Installation of the pellet controller
INSTALLATION OF THE PELLET CONTROLLER
- remove the perforated part of the upper boiler cover and through the hole place the safety
thermostat sensor and boiler temperature sensor (regulation) in the boiler sleeve (on EKO-CK P +
Cm Pelet-set on upper part of the boiler, on the EKO-CKB P + Cm Pelet-set from the front side
of the boiler - run the sensors to the sleeve on the lateral side of the boiler).
- connect the 4-pole and 6-pole connectors to the burner and fasten the connectors to the burner
body bolts. Attach the wire cable between the regulation and the burner to the boiler with the
supplied plastic retainers (secure the cable holder to the boiler using the 3,9 x 16 mm lattice bolts).
- in the lower left or right corner of the front lower boiler cover insert the microswitch (1) (depending on
the direction of opening the lower boiler openings) (3), fasten it with 2 screws, adjust the microswitch
cover (2) as shown and tighten it with the screw. Check that the pellet door (4), when closed, presses
the microswitch (see figure below).
- according to the technical instructions for the assembly of the pellet tank and pellet transporter
prepare the pellet tank CPSP and place it on the right or left side of the boiler on the horizontal
surface. The boiler and the tank must be set to the same level and you need to align the front
side cover of the tank with the front side cover of the boiler.
- in the pellet tank place the pellet transporter for feeding of the pellet CPPT and with a transparent
flexible tube connect it with the pellet burner CPPL. One end of the transparent flexible tube is
touched to the burner (to the feeding tube) to the filling sensor / temperature gauge on the inlet pipe
in the burner, and the other end to the transporter so that the tube can not fall off. The transparent
tube must be as flat as possible between the transporter and the burner so that the pellets can freely
descend from the transporter to the burner (in case the pellets are retained in the tube, the tube must
be leveled or if necessary, shorten the PVC tube).
- The power cable for the screw conveyor (CPPT) should be connected to the connector (2) at the
rear of the CPREG-Touch control unit.
- connect the CPREG-Touch controller power supply to the appropriate input on the printed circuit
board (PCB) in the CPREG-Touch control unit. The power supply of the CPREG-Touch control
MUST NOT be connected via the factory-installed pump thermostat on the back of the boiler cover.
- connect the built-in pumps and accessories to the appropriate outputs on the CPREG-Touch
controller board according to el. schemes (connection of certain elements to certain outputs
depends on the selected configuration and additional equipments).
Safety elements of the CPREG-Touch controller:
- safety thermostst via controller CPREG-Touch switch off the fan operation of the burner and pellet
transporter when temperature in the bolier goes over 110°C (+0°C / -9°C).
INSTALLATION OF THE PELLET CONTROLLER TO THE BOILER
Technical instructions CONTROLLER - CPREG-Touch 7
Microswitch installation
2
4
1
3
2
4
3
1
Microswitch position when the lower boiler door opens on right side (factory)
Microswitch position when the lower boiler door opens on left side
Microswitch holder
Microswitch holder
Microswitch position
when the lower boiler
door opens on right
side (factory)
Microswitch position
when the lower boiler
door opens on left side
At standard delivery (lower boiler door opens on right side) microswitch is installed on front lower
side of boiler casing cover (casing cover side have prepared holes for installing microswitch with
holder).
At installation on boiler on which is changed lower boiler door opening direction (lower boiler door
opens on left side) is necessary to dismantle microswitch from holder (it’s fasten to holder with two
screw and two nuts), rotate it on opposite drection and fasten it with same screws and nuts.
After that, microswitch is install to lower front right side of boiler casing cover (casing cover side have
prepared holes for installing microswitch).
Microswitch installation
Technical instructions CONTROLLER - CPREG-Touch
8
- Prior to switching on the control unit for the first time, the authorized service technician must install
the correct code key (depending on the burner power (14kW / 20-35kW / 40-50kW / 60-90kW) to
which the CPREG-Touch control unit is connected) in the place intended for the code key on the
control board. (picture a)
Code keys are delivered in a nylon bag with CPREG-Touch controller.
INSTALLATION OF CODE KEY IN CONTROLLER
(PERFORMED ONLY BY AN AUTHORIZED SERVICER)
Installation of code key in controller
Picture a) Example of code key installation 20-35kW
Technical instructions CONTROLLER - CPREG-Touch 9
Mark on
code key
14
35
50
90
Burner
power
14 kW
20-35 kW
40-50 kW
60-90 kW
Basic scheme of EKO-CK (B) P + Cm Pelet-set boiler installation on closed heating system
bar
Basic scheme of EKO-CK (B) P + Cm Pelet-set boiler installation on open heating system
Legend:
1. Boiler EKO-CK P + Cm Pelet-set (14-90) or boiler EKO-CKB P + Cm Pelet-set (14-50)
2. Safety-vent group (safety valve 2,5 bar)
3. Pump P1
4. Closed expansion vessel (approximately 10% of the total volume of the installation)
5. Open expansion vessel (approximately 7% of the total volume of the installation)
X. - Installation of the boiler on heating system and backflow protection
YZ. - Heating circuits and DHW
REMARK:
Boilers EKO-CKB P + Cm Pelet-set must have a install expansion vessel and safety valve for DHW.
The manual shut-off valves are not shown on the schemas.
All boilers can be installed on a close or open heating system. Below the instructions, all schemes are
shown with installation on an close heating system.
Above the highest
heating body
OPC
TYPE OF HEATING SYSTEMS - CLOSED AND OPEN HEATING SYSTEMS
Scheme 1)
Scheme 2)
YZX
YZX
1
3
5
3
1
2
4
Boiler installation with the central heating installation
Technical instructions CONTROLLER - CPREG-Touch
10
HEATING SYSTEM AND BACKFLOW PROTECTION INSTALLATION
SCHEME (first mark X, configuration YZ)
X
Boiler installation with the central heating installation
Technical instructions CONTROLLER - CPREG-Touch 11
Scheme 1) - configurations A YZ Scheme 2) - configurations B YZ
Scheme 3) - configurations C YZ
bar
5
8
4 9
10
bar
2
6
8
4 9
10
M
1
11 3
bar
2
12
1
bar
2
4 6
12
1
3
M
11
Scheme 4) - configurations D YZ
bar
2
4
13
1
3
Scheme 5) - configurations E YZ
YZ-1
YZ-1 YZ-2
YZ-2
YZ-1
bar
4 6
1
3
M
YZ-2
1
2
3
459
10
8
1
2
4
11 369
10
8
1
2
435
12
1
2
411 36
12
11
2
435
13
4
2
13
6
3
Scheme 6) - configurations F YZ
A - boiler connection to the ACCUMULATION TANK
via 3-way thermostatic valve (60°C backflow
protection)
B - boiler connection to the ACCUMULATION TANK
via 3-way valve with actuator (backflow
protection)
C - boiler connection to the HYDRAULIC
CROSSOVER via 3-way thermostatic valve
(60°C backflow protection)
D - boiler connection to the HYDRAULIC
CROSSOVER via 3-way valve with actuator (backflow
protection)
E - boiler connection to the HYDRAULIC
CROSSOVER+SENSOR via 3-way thermostatic
valve (60°C backflow protection)
F - boiler connection to the HYDRAULIC
CROSSOVER+SENSOR via 3-way valve with actuator
(backflow protection)
Technical instructions CONTROLLER - CPREG-Touch
12
Scheme 7) - configurations H YZ
Scheme 9) - konfiguracije J YZ
1
M
4
bar
2
3
11
7 YZ-3
1
M
4
7
bar
2
8
9
10
3
11
YZ-2
3
1
M
7
4
bar
2
12
YZ-2
3
1
M
7
4
bar
2
13
YZ-2
Legend:
1. Boiler EKO-CK (B) P + Cm Pelet-set
2. Safety-vent group (safety valve 2,5 bar)
3. Pump P1
4. Closed expansion vessel
5. (variant - 1) - backflow protection:
- 3-way mixing valve (min. 60 C )
6. (variant - 2) - backflow protection:
- 3-way mixing valve with actuator
7. (variant - 3 / variant - 4 if the heating circuits and DHW are directly connected to 4-way mixing valve)
- Backflow protection
- 4-way mixing valve with actuator
8. Accumulation tank
9. Lower sensor of the accumulation tank (BUFFER2)
10. Upper sensor of the accumulation tank (BUFFER1)
11. Backflow sensor
12. Hydraulic crossover HS
13. Hydraulic crossover HS + sensor HS (BUFFER1)
YZ-1 - Heating circuits and DHW - (variant - 1 - backflow protection)
YZ-2 - Heating circuits and DHW - (variant - 2 - backflow protection)
YZ-3 - Heating circuits and DHW - (variant - 3 - backflow protection)
YZ-4 - Heating circuits and DHW - (variant - 4 - backflow protection)
1
1
1
1
4
4
4
4
3
7
13
2
12
7
3
2
2
11 3
778
7
9
3
11
2
Remark:
Manual shut-off valves and expansion vessel forDHW are not shown on the schemas.
Scheme 8) - configurations I YZ
Scheme 10) - configurations K YZ
H - boiler connection to the 4-WAY VALVE with actuator
(backflow protection)
I - boiler connection to the ACCUMULATION TANK via
4-way valve with actuator (backflow protection)
J - boiler connection to the HIDRAULIC CROSSOVER
via 4-way valve with actuator (backflow protection)
K - boiler connection to the HYDRAULIC CROSSOVER +
SENSOR via 4-way valve with actuator (backflow
protection)
Boiler installation with the central heating installation
HEATING CIRCUITS AND DHW (second and third configuration symbols X Y Z )
Technical instructions CONTROLLER - CPREG-Touch 13
Boiler installation with the central heating installation
M
X
MM
1
4
X
X
b) 2 heating circuits with mixing valve
c) the DHW tank circuit
POSSIBLE FOR: YZ-1 YZ-2 YZ-3
M
X
d) 1 heating circuit with mixing valve and
DHW tank
e) 2 heating circuits with mixing valve and
DHW tank
MM
X
f) the DHW tank circuit with recirculation
X
a) 1 heating circuit with mixing valve
2
1
5
7
6 5
7 7
6
1
2
576
8
7
6
1
2
3
4
2
3
Important: For easy managing use YZ - variants from the previous point 5.5)
YZ-4
X 01, X 71, X81
X = "A", "B", "C", "D", "E", "F", "H", "I", "J", "K"
Possible configurations:
X = "A", "C", "E"
X 02, X 72, X82
Possible configurations:
X 10
X = "A", "B", "C", "D", "E", "F", "H", "I", "J", "K"
Possible configurations: X 11
X = "A", "B", "C", "D", "E", "F", "H", "I", "J", "K"
Possible configurations:
POSSIBLE FOR: YZ-1 YZ-2 YZ-3 YZ-4 POSSIBLE FOR: YZ-1 YZ-2 YZ-3 YZ-4
POSSIBLE FOR: YZ-1 - -YZ-4
POSSIBLE FOR: YZ-1 - -YZ-4
X = "A", "C", "E"
X 12
Possible configurations: X 20
X = "A", "B", "C", "D", "E", "F", "H", "I", "J", "K"
Possible configurations:
POSSIBLE FOR: YZ-1 YZ-2 YZ-3 YZ-4
5
Technical instructions CONTROLLER - CPREG-Touch
14
Boiler installation with the central heating installation
H 00, H 70
Possible configurations:
X
M
g) 1 heating circuit and DHW tank with
recirculation
M
XM M
X
h) 2 heating circuits and DHW tank with
recirculation
*i) direct heating circuits with pump (one or
two heating circuits, depends on the selection)
*j) direct heating circuits without pump (one or
two heating circuits, depends on the selection)
XM
*k) direct heating circuits with pump + DHW
(one or two heating circuits, depends on the
selection)
*l) direct heating circuits without pump + DHW
(one or two heating circuits, depends on the
selection)
57
8
2
1
657
8
6
1
2
3
4
10
11
9
X
M
9
13
12
10
11
57
9
XM
12
13
57
9
X 21
X = "A", "B", "C", "D", "E", "F", "H", "I", "J", "K"
Possible configurations:
POSSIBLE FOR: YZ-1 YZ-2 YZ-3 YZ-4 POSSIBLE FOR: YZ-1 - -YZ-4
X = "A", "C", "E"
X 02, X 72, X82
Possible configurations:
POSSIBLE FOR: - - -YZ-4
POSSIBLE FOR: - - -YZ-4
POSSIBLE FOR: - - -YZ-4 POSSIBLE FOR: - - -YZ-4
* valid with the
condition:
- that CM2K was not
connected
- that direct heating
circuits are additionally
selected
* valid with the
condition:
- that CM2K was not
connected
- that direct heating
circuits and pumps
are additionally selected
H 00, H 70
Possible configurations:
H 10
Possible configurations:
* valid with the condition:
- that CM2K was not connected
- that direct heating circuits and pumps are additionally selected
H 10
Possible configurations:
Remark:
Possible selection: room corrector
or room thermostat
Remark:
Possible selection: room corrector
or room thermostat
Remark:
Possible selection: room corrector
or room thermostat
* valid with the condition:
- that CM2K was not connected
- that direct heating circuits are additionally selected
Remark:
Possible selection: room corrector
or room thermostat
Technical instructions CONTROLLER - CPREG-Touch 15
Boiler installation with the central heating installation
Legend:
1 - 1. mixing heating circuit (radiator, floor...)
2 - Sensor 1. mixing circuit (CIRCUIT1) + pump (P4) + actuator (MVAL1)
3 - 2. mixing heating circuit (radiator, floor...)
4 - Sensor 2. mixing circuit (CIRCUIT2) + pump (P5) + actuator (MVAL2)
5 - DHW tank
6 - DHW tank pump (P2)
7 - DHW tank sensor (DHW)
8 - DHW recirculation (P3)
9 - 4-way mixing valve + actuator (MVAL2)
10 - Direct heating circuit (radiator) with room thermostat or room corrector + pump (P4)
11 - Direct heating circuit (radiator) with room thermostat or room corrector + pump (P5)
12 - Direct heating circuit (radiator) with room thermostat or room corrector + pump
13 - Direct heating circuit (radiator) with room thermostat or room corrector + pump
Remark:
Manual shut-off valves and expansion vessel for DHW are not shown on the schemas.
XM
*m) Direct heating circuits with pump + DHW
with recirculation (one or two heating
circuits, depends on the selection)
10
11
5
9
7
8
XM
12
13
5
9
8
7
*n) direct heating circuits without pump +
DHW with recirculation (one or two heating
circuits, depends on the selection)
POSSIBLE FOR: - - -YZ-4 POSSIBLE FOR: - - -YZ-4
H 20
Possible configurations:
H 20
Possible configurations:
* valid with the condition:
- that CM2K was not connected
- that direct heating circuits and pumps are additionally selected
Remark:
Possible selection: room corrector
or room thermostat
* valid with the condition:
- that CM2K was not connected
- that direct heating circuits are additionally selected
Remark:
Possible selection: room corrector
or room thermostat
INSTALLATION OF A 3-WAY / 4-WAY MIXING VALVE WITH ACTUATOR
Installation of the 3-way / 4-way mixing valve (backflow protection)
A three-way or four-way mixing valve with a motor in the backflow protection function can be installed
on the left or right side of the boiler, see examples of installation on the right side of the boiler
(Example 1 and Example 2). Example 1 shows a 3-way mixing valve, and Example 2 shows a four-
way mixing valve. Installing the mixing valve on the left side of the boiler is the mirror image shown in
Example 1 and Example 2. The direction of opening of the actuator must be in accordance with the
actual direction of opening for the individual situation, the electric diagram of this technical
instructions and directions "Close MV!" and "Open MV!" in a manual control test.
Technical instructions CONTROLLER - CPREG-Touch
16
Installation of a 3-way / 4-way mixing valve with actuator
Example 1: 3-way mixing valve
bar
M
Valve 100% closed
bar
M
Valve 100% open
Example 2: 4-way mixing valve
bar
M
Boiler
flow
Installation flow
Installation
backflow
Boiler
backflow
Boiler
flow
Installation
flow
Installation
backflow
Boiler
backflow
Valve 100% closed Valve 100% open
bar
M
OPEN DIRECTION CLOSING DIRECTION
OPEN DIRECTION CLOSING DIRECTION
Actuator installation (backflow protection)
Technical instructions CONTROLLER - CPREG-Touch 17
Installation of a 3-way / 4-way mixing valve with actuator
An example of the ESBE actuator installation on a 4-way mixing valve (the pre-installation of a 3-way mixing valve
is the same).
1. Engine position when valve is closed. 2. Valve position (valve closed) - axle
marking (A).
A
3. The position of the motor-drive clutch position before
the drive is installed; the clutch mark (B).
B
4. Install the actuator as shown in the figure below (the
moving part of the actuator must be facing the green
stop (C) with the handle of the handle (D).
C D
6. Position the drive handle, tilt it to the left until it
reaches the crank position, to set it to DOWN -
automatic operation
5. Tighten the drive clamping screw (when the bolt clamps, the
propulsion part of the drive will rotate from right to bottom to
the end position)
Drive handle
Boiler
flow
Installation flow
Installation
backflow
Boiler
backflow
OPEN DIRECTION
7. Position of the drive in the DOWN position (drive handle pressed) - automatic operation; boiler ready for operation
Installation
backflow
Installation flow
Boiler
flow
Boiler
backflow
CLOSING DIRECTION
Valve 100% closed
Valve 100% open
Installation of a 3-way / 4-way mixing valve with actuator
Technical instructions CONTROLLER - CPREG-Touch
18
Touchscreen must not be pressed while switching the main switch on, otherwise
the controller will show a firmware update mode, which is used by an authorized
person only. If this happens, please switch the main switch off and switch it back
on without pressing the touchscreen.
SWITCHING ON / DISPLAY
Button ’’OK’’
Initial message countdown
Software version
Language selection
Burner power:
- 14 kW (Cm Pelet-set 14)
- 20-35 kW (Cm Pelet-set 35)
- 40/50 kW (Cm Pelet-set 50)
- 60-90 kW (Cm Pelet-set 90)
After switching the main switch on, the language selection and software version will appear on the screen. You can
choose between different languages. To select the preferred language press a flag on display.
Software version
Burner power:
- 14 kW (Cm Pelet-set 14)
- 20-35 kW (Cm Pelet-set 35)
- 40/50 kW (Cm Pelet-set 50)
- 60-90 kW (Cm Pelet-set 90)
The possibility of online boiler
monitoring and online boiler
operation management
(it is necessary to have
Cm Wifi-box as an additional
equipment)
If the option ''LANGUAGE SELECTION'' is ''OFF'' in the main menu under the name ''DISPLAY'', the initial message will
appear on the screen (see the picture below) and it will stay as long as is set in the submenu ''INITIAL MESSAGE TIME''
or until you press the ''OK'' button.
Scroll page
Technical instructions CONTROLLER - CPREG-Touch 19
Switching on / Display
The main menu, symols
THE MAIN MENU
SYMBOLS
The main menu is used to select a preferred submenu. To enter into a certain menu press an icon on the
screen. To switch between the ''Main menu'' and ''Boiler working display'' press the ''VIEW SELECTION''
button. To display drop-down menu (if it is enabled) use the ''SHORTCUTS'' button.
Button ’ON / OFF’
options: on / off boiler operation’
Button ’VIEW SELECTION’
options: main menu / home screen
Button ’SHORTCUTS’: Drop-down
menu (if it is active)’’
Button ’ENTER’
Button ’BACK’
Button ’’PREVIOUS SCREEN’
Button ’’NEXT SCREEN’’
Button ’OK’
Tipka ’START’’/’STOP’’
Navigation buttons:
’LEFT’, ’RIGHT’’, ’UP’’,’DOWN’
Button ’DELETE’
Button ’’FACTORY SETTINGS
Button ’’INFORMATION’’
Button ’COPY’Button ’PASTE’’
View selection:
Main menu / work
Time
Boiler start / stop
Date
Shown if additional equipment
CM2K is enabled only
Shortcuts:
drop-down menu
(if it is active)
Current boiler status
(Work phase)
Technical instructions CONTROLLER - CPREG-Touch
20
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77
  • Page 78 78
  • Page 79 79
  • Page 80 80
  • Page 81 81
  • Page 82 82
  • Page 83 83
  • Page 84 84
  • Page 85 85
  • Page 86 86
  • Page 87 87
  • Page 88 88
  • Page 89 89
  • Page 90 90
  • Page 91 91
  • Page 92 92
  • Page 93 93
  • Page 94 94
  • Page 95 95
  • Page 96 96
  • Page 97 97
  • Page 98 98
  • Page 99 99
  • Page 100 100
  • Page 101 101
  • Page 102 102
  • Page 103 103
  • Page 104 104
  • Page 105 105
  • Page 106 106
  • Page 107 107
  • Page 108 108
  • Page 109 109
  • Page 110 110
  • Page 111 111
  • Page 112 112
  • Page 113 113
  • Page 114 114
  • Page 115 115
  • Page 116 116
  • Page 117 117
  • Page 118 118