Toro CE Bagger Compliance Kit, TimeCutter HD Riding Mower Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Toro CE Bagger Compliance Kit, TimeCutter HD Riding Mower Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
FormNo.3415-409RevA
CEBaggerComplianceKit
TimeCutter
®
HDRidingMower
ModelNo.137-5001
InstallationInstructions
Installation
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
ProcedureDescription
Qty.
Use
1
Nopartsrequired
Removetheexistingcurtainandknob.
Curtain
1
2
Bolt(1/4x5/8inch)
1
Installthenewcurtain.
WARNING
CALIFORNIA
Proposition65Warning
ThisproductcontainsachemicalorchemicalsknowntotheStateofCalifornia
tocausecancer,birthdefects,orreproductiveharm.
1
RemovingtheExisting
CurtainandKnob
NoPartsRequired
Procedure
1.Parkthemachineonalevelsurface,shutoffthe
engine,engagetheparkingbrake,andremove
thekey.
2.Removetheexistingcurtainbylooseningthe
boltsholdingthecurtaintotheframeandthe
mowerdeck(Figure1).
g213267
Figure1
1.Bolts
2.Curtain
©2017—TheToro®Company
8111LyndaleAvenueSouth
Bloomington,MN55420
Registeratwww.T oro.com.
OriginalInstructions(EN)
PrintedintheUSA
AllRightsReserved
*3415-409*A
3.RemovetheknobshowninFigure2.
g201515
Figure2
1.Knob3.Beltcover
2.Poweredbaggercover
2
InstallingtheNewCurtain
Partsneededforthisprocedure:
1
Curtain
1
Bolt(1/4x5/8inch)
Procedure
1.Removetheboltsandretainingnutsfromthe
straightrodintheexistingcurtainandretainthe
nutsandbolts.
2.Removethestraightrodfromtheexisting
curtain.
3.Installthestraightrodintothenewcurtain
andinstallthepreviouslyremovedboltsand
retainingnuts.
4.Installthenewcurtaintotheframeandthe
mowerdeckusingtheexistinghardware(Figure
3).
5.Installthebolt(1/4x5/8inch)intothehole
wheretheknobwasremoved(Figure3).
g213343
Figure3
1.Existingcurtainhardware3.Newcurtain
2.Bolt(1/4x5/8inch)
2
/