Ametrix CPP User manual

Type
User manual

This manual is also suitable for

Installation Instructions
Vault w/ visor
C-Scroll w/ visor
Roundel w/ visor
These installation instructions are valid with the above Ametrix styles
Warning
: Before starting any work ensure
that all sources of power are turned off. All
work must meet local/national codes and be
performed by a certified electrician.
Do not
mount fixtures vertically.
Small, INDOOR
CPP/CPS
(Continuous Pendant)
Visor and Non-Visor
Sheet 1 of 5
ADY071477 REV A (ECN080352)
Pendant tube
Yoke arm
10-32 x5/8"
End screw
Pendant nut
(x2)
End pendant
assembly
Center pendant
assembly
Pendant tube
Power wire
from J-box
#10-32 x 5/8"
End screw
(2x)
Fixture wire
Center cover plate
#10-32 x 3/8"
Pan head screws
(2x)
Swivel pendant shown
Exploded view and part call-out
J-box
(by others)
These instructions are valid for both PP and PS mounting
assemblies. Secure both pendant assemblies to ceiling before
attaching fixture head.
1. Remove canopy and allow it to slide down pendant.
2. Refer to power orientation supplementary sheet for power
location.
3. Run wiring from j-box down pendant tube and using
#8-32 x1/2" Pan head screws, secure mounting plate to j-box.
Reinforce J-box with additional bracing.
1.
Secure pendant yoke to pendant tube using both pendant
nuts prior to installation.
Mounting non power side pendant
These instructions are valid for both PP and PS mounting
assemblies
1. To secure non-power pendant, remove canopy and allow it
to slide down pendant.
2. Replace #8 Pan head screws with appropriate fasteners(by
others) Use additional bracing to secure pendant.
3. Secure mounting plate on center using dimensions provided
on next page.
Warning
: Before starting any work ensure
that all sources of power are turned off. All
work must meet local/national codes and be
performed by a certified electrician.
Do not
mount fixtures vertically.
Installation Instructions
Vault w/ visor
C-Scroll w/ visor Roundel w/ visor
These installation instructions are valid with the above Ametrix styles.
2
1
Sheet 2 of 5
Small, INDOOR
CPP/CPS
(Continuous Pendant)
Visor and Non-Visor
ADY071477 REV A (ECN080352)
PS Exploded assembly
Canopy
PS mounting
plate
#8-32 x1/2"
Screw
(2x)
#10-32 x5/8"
End Screw
Pendant yoke
PP canopy
#8-32 x1/2"
Screw
(2x)
PP mounting
plate
Pendant
nut
1.
Secure pendant yoke to pendant tube using both pendant
nuts prior to installation.
PP Exploded assembly
Mounting power-side pendant to J-box
plate
PS mounting
Canopy
(2x)
Screw(by others)
#8-32 x1/2"J-box
Run wiring into
pendant tube
PS mounting
plate
PS canopy
#8-32 x1/2"
Screw
(2x)
#10-32 x5/8"
End screw
Pendant yoke
Pendant
nut
2
3
32
"
52.84
Installation Instructions
Vault w/ visor
C-Scroll w/ visor
Roundel w/ visor
These installation instructions are valid with the above Ametrix styles
Warning
: Before starting any work ensure
that all sources of power are turned off. All
work must meet local/national codes and be
performed by a certified electrician.
Do not
mount fixtures vertically.
Small, INDOOR
CPP/CPS
(Continuous Pendant)
Visor and Non-Visor
Sheet 3 of 5
ADY071477 REV A (ECN080352)
52
7
8
"
1343
4ft fixture
16
"
5
8.25
4
5
32
"
105.71
40
25
32
"
1036.22
3ft fixture
15
1
16
15
1 "
49.4336.95
"
32
5
1
32
"
127.84
PP (Pendant) mounting plate dimensions
PS (Pendant Swivel) mounting plate dimensions
32
"
49.92
4.86
"
16
19.05
"
3
4
3
62.08
"2
16
7
1
31
R
19
32
"
14.99
Center dimensions for PP and PS mounting assemblies
28
7
8
"
733.40
2ft fixture
2
1
1
"
12.70
3.30
"
8
25.40
1"
1
1
32
"
25.91
Wiring fixtures to J-box
1.
Remove both #6-32 x3/8" Pan head screws and slide center
cover plate down.
2.
Run power wire from fixture through hub and into center
yoke bracket.
3.
Secure first fixture to center yoke bracket using #10-32 x5/8"
end screw.
1.
Mount next center or end pendant depending on length of
run.
2.
Run new fixture wire into center yoke bracket.
3.
Using #10-32 x5/8" end screws, secure new fixture head to
both pendants.
Warning
: Before starting any work ensure
that all sources of power are turned off. All
work must meet local/national codes and be
performed by a certified electrician.
Do not
mount fixtures vertically.
Installation Instructions
Vault w/ visor
C-Scroll w/ visor Roundel w/ visor
These installation instructions are valid with the above Ametrix styles.
4
6
5
Sheet 4 of 5
Small, INDOOR
CPP/CPS
(Continuous Pendant)
Visor and Non-Visor
ADY071477 REV A (ECN080352)
3
Securing first fixture to wired center yoke
bracket
Power wire
from J-box
Fixture wireFixture wire
1.
Attach wires and ensure connections are properly matched.
(wire nuts by others)
2.
Replace center cover plate and secure using both #6-32 x
3/8" Pan head screws.
Center cover plate
Center cover
plate
First fixture
head
#10-32 x 5/8
End screw
Fixture wire
Power wire
from J-box
#6-32 x 3/8"
Pan head screws
Securing first fixture to first pendant
1.
Choose first fixture in run. First fixture depends on length of
run, refer to page four(4) for fixture identification. The final
fixture will have to have the extra wire capped off.
2.
Secure fixture head to pendant assembly using
#10-32x 5/8" end screw.
#10-32 x5/8
End screw
Canopy
Fixture wire
Securing additional fixtures in run
#10-32 x 5/8"
End screw
Center cover
plate
Fixture wire
Installation Instructions
Vault w/ visor
C-Scroll w/ visor
Roundel w/ visor
These installation instructions are valid with the above Ametrix styles
Warning
: Before starting any work ensure
that all sources of power are turned off. All
work must meet local/national codes and be
performed by a certified electrician.
Do not
mount fixtures vertically.
Small, INDOOR
CPP/CPS
(Continuous Pendant)
Visor and Non-Visor
Sheet 5 of 5
ADY071477 REV A (ECN080352)
(Custom row configurations are available however pricing may be affected)
Continuous Pendant Row Layouts
Nominal
Row
Length
(ft)
Actual
Overall
Row
Length:
Pendant
(ft)
Row Breakdown/
Installation Sequence
Nominal
Row
Length
(ft)
Actual
Overall
Row
Length:
Pendant
(ft)
Row Breakdown/ Installation
Sequence
3
2.6 2C
27
25.4 3C,4C,4C,4C,4C,3C
4
3.6 3C
28
27.4 4C,4C,4C,4C,4C,4C
5
4.6 4C
29
28.9 4C,4C,3C,3C,3C,4C,4C
6
5.1 2C,2C
30
29.9 3C,4C,4C,4C,4C,4C,3C
7
6.1 2C,3C
31
30.9 4C,4C,4C,3C,4C,4C,4C
8
7.1 3C,3C
32
31.9 4C,4C,4C,4C,4C,4C,4C
9
8.1 3C,4C
33
31.9 4C,4C,4C,4C,4C,4C,4C
10
9.1 4C,4C
34
32.5 2C,4C,4C,4C,4C,4C,4C,2C
11
10.7 3C,3C,3C
35
34.5 3C,4C,4C,4C,4C,4C,4C,3C
12
11.7 4C,2C,4C
36
35.5 4C,4C,4C,4C,3C,4C,4C,4C
13
12.7 4C,3C,4C
37
36.5 4C,4C,4C,4C,4C,4C,4C,4C
14
13.7 4C,4C,4C
38
38.0 4C,4C,4C,3C,3C,3C,4C,4C,4C
15
14.2 3C,3C,3C,3C
39
39.0 3C,4C,4C,4C,4C,4C,4C,4C,3C
16
15.2 3C,3C,3C,4C
40
39.0 3C,4C,4C,4C,4C,4C,4C,4C,3C
17
16.2 3C,4C,4C,3C
41
40.0 4C,4C,4C,4C,3C,4C,4C,4C,4C
18
17.2 4C,4C,4C,3C
42
41.0 4C,4C,4C,4C,4C,4C,4C,4C,4C
19
18.2 4C,4C,4C,4C
43
42.6 4C,4C,4C,4C,3C,3C,3C,4C,4C,4C
20
19.8 4C,3C,3C,3C,4C
44
43.6 3C,4C,4C,4C,4C,4C,4C,4C,4C,3C
21
20.8 3C,4C,4C,4C,3C
45
44.6 4C,4C,4C,4C,4C,3C,4C,4C,4C
22
21.8 4C,4C,3C,4C,4C
46
45.6 4C,4C,4C,4C,4C,4C,4C,4C,4C,4C
23
21.8 4C,4C,3C,4C,4C
47
46.1 3C,3C,4C,4C,4C,4C,4C,4C,4C,3C,3C
24
23.4 2C,4C,4C,4C,4C,2C
48
47.1 4C,4C,4C,4C,3C,3C,3C,4C,4C,4C,4C
25
23.4 2C,4C,4C,4C,4C,2C
49
48.1 3C,4C,4C,4C,4C,4C,4C,4C,4C,4C,3C
26
25.4 3C,4C,4C,4C,4C,3C
50
49.1 4C,4C,4C,4C,4C,3C,4C,4C,4C,4C,4C
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5

Ametrix CPP User manual

Type
User manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI

in other languages