WW3019-54

Bilco WW3019-54, W3019-42N, W3019-54N, W3019-66N Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Bilco WW3019-54 Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
STEP 1: Excavate the area to the ad-
equate depth for the window well and
extension. Once the areaway has been
excavated, install the standard window
well on the foundation per the instruc-
tions in the window well carton. The ex-
tension panels will be added after the
standard window well is installed.
STEP 2: Once the window well is in-
stalled, align each extension side panel
with the window well sides as shown in
Figure 1 and attach them to the founda-
tion using masonry anchors. Use (2)
masonry anchors at the very top of each
extension side panel and (1) at the very
bottom. (Note: extension side panel
mounting flanges may be repositioned
to the inside if required, refer to STEP 2
of the installation instructions provided
with the window well).
Attach extension side panels to window
well side panels using the 1/4-20 x 1”
screws provided, see Figure 2.
STEP 3: Attach connector plates to the
side panels as shown in Figure 2 using
the 1/4-20 x 1” screws provided.
STEP 4: Position the extension step
panel as shown in Figure 1, snapping it
into place. Cross-pin the step panel to
each of the extension side panels at the
pre-marked location using nails per
STEP 4 and FIGURE 4 of the installa-
tion instructions provided with the win-
dow well.
STEP 5: Backfill the area per STEP 6 of
the of the installation instructions pro-
vided with the window well.
MSC308 Rev-2
Figure 1
Figure 2
Window Well
Side Panel
Extension
Side Panel
Extension
Step Panel
Panels Attached
Using 1/4” Screws
Window Well
Side Panel
Extension Side Panel
Connector
Plate
Attach to
Side Panels
Using 1/4”
Screws
Installation Questions ?
Call 1-800-854-9724
Monday - Friday
8:15 A.M. - 5:00 P.M. E.S.T.
or log on to www.bilco.com
The Bilco Company, P.O. Box 1203, New Haven, CT 06505
SCAPEWEL
Deep Well Installation Instructions
READ ALL INSTRUCTIONS BEFORE INSTALLATION
®
Building on Our Tradition
TM
/