APEC Water Systems UG-UVSET-1-4-SS User manual

Type
User manual
INSTALLATION FOR RO SYSTEM WITH UV LIGHT OPTION
©2019 APEC Water Systems. All rights reserved. v.2019.1 www.FreeDrinkingWater.com
Yellow Tubing
to Tank
Clear Tubin
g
to Faucet
Red Tubing
from
Wa
ter Source
G
F
J
Install UV BULB into UV Light:
1) Please connect UV bulb to transformer.
2) Connect the UV bulb pins to the transformer (Fig. 2)
3) Insert the UV bulb all the way into the UV light securely
and make sure the transformer fully covers the UV light
bulb entry point (Fig. 3 & Fig. 4)
Fig. 2
Fig. 3 Fig. 4
Tank Connection: See Fig. 1 below.
Remove the plastic end plug from the UV Light T-fitting at Point G. To remove the end plug, push in
and hold down on the collet ring squre into the fitting. With the ring in this position, you can now
remove the end plug. Next, connect the Yellow tank tubing to the T-fitting. To connect, simply push the
tubing into the Quick Connect fitting then gently pull back on the tubing to make sure connection is
secured.
Your RO system includes a UV light option. The UV light is added to your system at Stage-5 (before
final stage carbon filter). So instead of feeding the tank Yellow tubing to the Stage-5 filter T-fitting, you
will now feed the yellow tubing into the UV light T-fitting.
Note: The rest of the RO installation is the same as stated in the Installation Manual, please
follow the Manual step by step for all the other connections.
Fig. 1
  • Page 1 1

APEC Water Systems UG-UVSET-1-4-SS User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI