Toro 6" x 2' Soil Chain Kit, Dingo Compact Utility Loader Installation guide

Type
Installation guide

Toro 6" x 2' Soil Chain Kit, Dingo Compact Utility Loader is a device designed to convert a 4-inch soil chain into a 6-inch cutting width chain. It is compatible with Toro's Dingo Compact Utility Loaders and includes all necessary parts for installation, such as left and right soil teeth, spacers, tubes, bolts, and locknuts. The kit is easy to install and can be completed in three steps: removing the spoils auger, installing the teeth, and reinstalling the spoils auger.

Toro 6" x 2' Soil Chain Kit, Dingo Compact Utility Loader is a device designed to convert a 4-inch soil chain into a 6-inch cutting width chain. It is compatible with Toro's Dingo Compact Utility Loaders and includes all necessary parts for installation, such as left and right soil teeth, spacers, tubes, bolts, and locknuts. The kit is easy to install and can be completed in three steps: removing the spoils auger, installing the teeth, and reinstalling the spoils auger.

Form No. 3353-228 Rev -
6in x 2ft Soil Chain Kit
For Dingo® Compact Utility Loaders
Model No. 108–5540
Installation Instructions
Installation
Loose Parts
Use the chart below to verify that all parts have been shipped.
Step
Description
Qty.
Use
1
No parts required
Remove the spoils auger.
Left soil tooth
3
Right soil tooth
3
Spacer 6
Tube
3
Bolt (3/8 x 4 inches)
3
Bolt (3/8 x 1-1/4 inches)
6
2
Locknut (3/8 inch)
9
Install the teeth.
3
No parts required
Install the spoils auger.
Note: Deter mine the left and right sides of the mac hine from the nor mal operating position.
Step
1
Removing the Spoils Auger
No Parts Required
Procedure
1. Lo w er the loader ar ms , stop the engine , and
remo v e the k ey .
2. R emo v e the bolt and n ut securing the spoils
aug er to the trenc her ( Figure 2 ).
3. Star t the engine and raise the loader ar ms
slightly (2 to 3 inc hes).
4. Stop the engine and remo v e the k ey .
5. R emo v e the aug er and retain the bolt and n ut.
Step
2
Installing the Teeth
Parts needed for this step:
3
Left soil tooth
3
Right soil tooth
6 Spacer
3
Tube
3
Bolt (3/8 x 4 inches)
6
Bolt (3/8 x 1-1/4 inches)
9
Locknut (3/8 inch)
Procedure
T he c hain on y our trenc her comes from the
factor y with teeth designed to dig a 4 inc h trenc h
in soil. T his kit contains the par ts y ou need to
con v er t the c hain into an 6 inc h cutting width
© 2005—The Toro® Company
8111 Lyndale Avenue South
Bloomington, MN 55420
Register at www.Toro.com. Original Instructions (EN)
Printed in the USA.
All Rights Reserved
c hain. T he c hain has 24 links , and eac h link can
ha v e dig ging teeth fastened to it and is refer red to
as a tooth position. F or the 4 inc h soil c hain, the a
teeth are fastened onto ev er y other link, for a total
of 16 teeth. T o mak e it into a 6 inc h c hain, y ou add
a 6 inc h tooth configuration betw een 2 existing
teeth ev er y 8 links . At eac h tooth position, the
teeth are fastened in v arious configurations with
spacers and tubes to v ar y the width of cut. T he
tooth configurations are ar rang ed along the c hain
to maximize dig ging efficiency .
T he teeth are cupped differently de pending on the
side of the c hain to whic h they are fastened (left
or right). T he teeth are fastened to the c hain links
with bolts , n uts , tubes , and spacers of v ar ying sizes .
1. Lo w er the loader ar ms , stop the engine , and
remo v e the k ey .
2. On an empty c hain link in the front of the
trenc her , install right and left soil teeth on both
sides of the c hain as illustrated in Figure 1 .
Figure 1
1. Chain link
5. Bolt (3/8 x 1-1/4 inches)
2. Left soil tooth 6. Tube
3. Right soil tooth
7. Locknut (3/8 inch)
4. Bolt (3/8 x 4 inches)
8. Spacer
3. Eight c hain links bac k, install right and left soil
teeth on both sides of the c hain as illustrated
in Figure 1 .
4. Star t the engine , raise the trenc her slightly off
the g round using the loader ar ms , and slo wly
r un the c hain forw ard to mo v e the other 12
links to the top .
5. Lo w er the loader ar ms , stop the engine , and
remo v e the k ey .
6. Eight c hain links bac k from the last tooth y ou
installed, install right and left soil teeth on both
sides of the c hain as illustrated in Figure 1 .
7. T or que all bolts and n uts y ou installed
previously to 27 to 33 ft-lb (37 to 45 N m).
Step
3
Installing the Spoils Auger
No Parts Required
Procedure
Important: F ailing to position the spoils
auger cor r ectl y may dama ge the tr encher .
1. Star t the engine and raise the loader ar ms
slightly (2 to 3 inc hes).
2. Stop the engine and remo v e the k ey .
3. Using the bolt and n ut y ou remo v ed previously ,
connect the spoils aug er to the aug er shaft.
P air the hole far thest from the aug er blade ,
in the end of the aug er with 2 holes , with the
inner hole on the shaft ( Figure 2 ).
Figure 2
1. Spoils auger 3. Hole position for a 6 inch
chain.
2. Hole position for a 4 inch
chain.
2
4. T or que the bolt and n ut to 75 ft-lb . (101 N m).
5. Lo w er the loader ar ms .
3
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

Toro 6" x 2' Soil Chain Kit, Dingo Compact Utility Loader Installation guide

Type
Installation guide

Toro 6" x 2' Soil Chain Kit, Dingo Compact Utility Loader is a device designed to convert a 4-inch soil chain into a 6-inch cutting width chain. It is compatible with Toro's Dingo Compact Utility Loaders and includes all necessary parts for installation, such as left and right soil teeth, spacers, tubes, bolts, and locknuts. The kit is easy to install and can be completed in three steps: removing the spoils auger, installing the teeth, and reinstalling the spoils auger.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI