GF GFCP Commercial Co-Pilot® Operating instructions

Type
Operating instructions
Co-Pilot
®
Meter Bypass System
Operating Instructions
1 Unlock the Co-Pilot.
2 Turn the Co-Pilot key to
BY-PASS.
3 Remove the old meter. 4 Connect the inlet side of the new
meter & install a nut plug in the outlet.
5 Turn Co-Pilot to PURGE. Purge
for one revolution of ½ ft. mark.
7 Connect the outlet side of
the new meter & turn to OPEN.
8 Lock the security cover
plate.
For more information visit our website
www.centralplastics.com
#CP028 (07/20)
© 2018 Georg Fischer LLC
Printed in USA
Commercial
BYPASS
PURGE
OPEN
BYPASS
PURGE
OPEN
1. Before installation, blow out the service lines so no dirt, debris, or liquids of any kind are
carried into the bypass when the gas is flowing in the line.
2. Place a new connection washer (gasket) on each swivel pilot.
3. Support the Co-Pilot bypass so both hubs are against the connection washers. Hand -tighten the
connection nuts.
4. In alternating fashion, tighten the connection nuts to an appropriate torque for the connect ion size.
5. Support the meter so both hubs are against the connection washers. Hand -tighten the connection nuts.
6. In an alternating fashion, tighten the connection nuts to an appropriate torque for the connection size.
7. After the meter is pressurized, check for leaks by applying a soap solution or other good leak detecting liquid to the
connections.
Installation Instructions
#CP028 (07/20)
© 2018 Georg Fischer LLC
Pri nted i n USA
  • Page 1 1
  • Page 2 2

GF GFCP Commercial Co-Pilot® Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI