  • Hello! I am an AI chatbot trained to assist you with the Southern Recreation Park Central Playgrounds Camel Back 80650600 Series Installation Manuallines. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
MODEL NUMBER: 80650600XX
DATE: 08/05/2011
Page 1
INSTALLATION GUIDELINES
CAMEL BACK CLIMBER
80650600XX
USER GROUP: 5 - 12
RECOMMENDED CREW: 2 people
TOOLS REQUIRED:
T-45 TORX tool (supplied by manufacturer)
Level
3/8” allen head tool
Tape measure
Auger / Post hole digger / Shovel
21/64 drill bit
High speed 3/8” electric drill w/clutch
NOTE: Use of any other driver may result in damage to tool and/or hardware!
INSTALLATION TIME: 2 hours
CONCRETE REQUIRED: 9.42 cubic feet
NOTE: Concrete must have a minimum rating of 2,500 psi and must be mixed per
manufacturer’s recommendations.
PRE-INSTALLATION CHECK:
Compare all items received to the packing list. Notify your local sales representative immediately if any
parts are missing or damaged.
We are not responsible for items discovered missing
after 72 hours from time of delivery!
Before beginning installation, make sure that you have read and understand the Installation Introduction
manual that was supplied to you. If you did not receive a copy, or if you have a question regarding
anything covered in this manual, contact your local sales representative.
MODEL NUMBER: 80650600XX
DATE: 08/05/2011
Page 2
INSTALLATION GUIDELINES
STEP 1
Refer to PLAN VIEW and FOOTING LAYOUT to locate position of camel back climber.
STEP 2
Excavate footings as shown in FOOTING LAYOUT and FOOTING DETAIL. Place a 2” spacer in each
hole.
Detail A
3/8”x1-1/4”
TORX Bolt
Top Hump
STEP 3
Select one end post for camel back climber, one camel back top hump and two 3/8”x1-1/4” TORX bolts.
Slide the two pieces fully together, keeping rungs oriented the same way. Drill a 21/64” hole through
the pre-drilled hole in the top hump and into the end post and secure each side with bolt (see Detail A).
Repeat step for other end post and hump.
End Post
MODEL NUMBER: 80650600XX
DATE: 08/05/2011
Page 3
INSTALLATION GUIDELINES
Detail B
Bottom Hump
STEP 4
Select camel back bottom hump, two in-ground legs and two 3/8”x1-1/4” TORX bolts. Slide leg over stub
of bottom of hump as far as it will go. Drill a 21/64” hole through the pre-drilled hole in the leg and into the
bottom hump. Secure with bolt (see Detail B). Repeat for other leg.
STEP 5
Select camel back bottom hump assembly, four 3/8”x1-1/4” TORX bolts and the end hump assemblies
from Step 3. Join pieces together using the same hardware and procedure from Step 3/Detail A.
STEP 6
Set climber in place in footings. Verify that climber is level, plumb and at correct height. Pour concrete in
footings to correct level. Fill remainder of hole with dirt. Allow concrete to harden for at least 48 hours
before use! Concrete must have a minimum rating of 2,500 psi and must be mixed per manufacturer’s
recommendations.
3/8”X1-1/4”
TORX Bolt
Leg
MODEL NUMBER: 80650600XX
DATE: 08/05/2011
Page 4
INSTALLATION GUIDELINES
Surfacing
Grade
ELEVATION VIEW
MODEL NUMBER: 80650600XX
DATE: 08/05/2011
Page 5
INSTALLATION GUIDELINES
FOOTING LAYOUT
FOOTING ELEVATION
/