JasonL CUBEPB-DB-MC Operating instructions

Type
Operating instructions
PAGE 1
ASSEMBLY INSTRUCTIONS
Telepod
Meeting Room
Booth
Need help!
Call us on
1300 527 665
www.jasonl.com.au
PAGE 2
Before we start, here are some things to be aware of:
1.
2.
3.
4.
5.
6.
Make sure you have all the required tools listed(Page03)
We recommend leaving at least 100 cm of space between the
wall or between multiple units of Sharing Pod
Position and assemble Sharing Pod as close to its final placement
as possible. If needed, a fully assembled Sharing Pod can be
repositioned by retracting its four levelier feet and moved with its
bottom rollers. When moving the unit,DO NOT push the unit
against the rollers’ direction! You may risk tipping Phone Booth or
damaging its rollers.
Please assemble with caution and make sure that the installation
site is protected to prevent any injuries or risks of damaging the
product and surrounding.
A packaged Sharing Pod unit weights 605.5 Kg and will require
2-3 persons to install. It takes an average of 45 mins - 1 hour
to install Sharing Pod
This is the assembly instruction for right hand opening door
Sharing Pod without stool.
REV .02
04-10-2022
PAGE 3
DRILL SCREW DRIVER
REQUIRED TOOLS LIST
REV .02
04-10-2022
PAGE 4
COMPONENT PACKING LIST
TOP METAL BRACKET
x 1pc
M1
BASE METAL BRACKET
x 1pc
M2 M3
SIDE PANEL L
x 1 SET (3pcs)
M5
M6 M7 M8
TOP ACOUSTIC PANEL
x 1pc
M9
M4
SIDE PANEL R
x 1 SET (3pcs)
GLASS WALL
x 1 SET (2pcs)
GLASS DOOR
x 1pc
FRONT GLASS WALL
x 1 SET (2pcs)
GLASS DOOR BAR
x 1SET (2pcs)
M12
PANEL STABILIZER
x 1pc
GLASS DOOR PLATFORM
x 2pcs
SIDE PANEL PLATFORM
x 4pcs
M10
M11 M17
BASE PANEL
x 1 SET (3pcs)
M18
SOFA
x 1 SET (2pcs)
REV .03
07-11-2022
PAGE 5
HARDWARE PACKING LIST
P1 P2 P3 P4
DOOR KNOB
x 1pc
DOOR HINGE
x 2pcs
CUBE TRIM
x 50pcs
CUBE COVER
x 4pcs
2103mm x 2pcs
2032mm x2pcs
P5
CUBE COVER
x 6pcs
2103mm x 2pcs
530mm x 4pcs
ALLEN KEY SET
ALLEN KEY SIZE 5mm x 1pc
ALLEN KEY SIZE 4mm x 1pc
ALLEN KEY SIZE 3mm x 1pc
ALLEN KEY SIZE 1.5mm x 1pc
P6
REV .03
02-11-2022
PAGE 6
SCREW PACKING LIST
JCBC SCREW M8X 50mm
x 16pcs
S1 S3 S4
S-CSKT #10X1/2
x 50pcs
S5
S-AH-CSK-M5X10
x 6pcs
S6
JCBC SCREW M6X25mm
x12pcs
S-CB4X32
x 8pcs
S-AH-CSK-M8X16
x 8pcs
S2
REV .02
04-10-2022
STEP 1
NOTES
~LOOSE 2 SCREWS FROM EACH
ACOUSTIC PANEL & REMOVE THEM
~SLIDE OUT ALL THE ACOUSTIC PANEL &
WHITE BOARD PAGE 7
FACE UP
R1
FACE UP
R2
FACE UP
R3
M4
ACOUSTIC
FOAM
SIDE PANEL R
FACE UP
R1
FACE UP
R2
FACE UP
R3
ACOUSTIC
FOAM
SIDE PANEL L
M3
SIDE PANEL
BASE
FACE UP
LEGEND
ACCOUSTIC PANEL GUIDE
INSTALL IN
REMOVE OUT
ACOUSTIC PANEL MAIN FRAME
CONNECTOR GUIDE
UP
DOWN
SIDE PANEL
BASE
FACE UP
REV .02
04-10-2022
PAGE 8
S1 X16pcs
M8X 50mm
S5 X8pcs
M3
M4
M1
M2
S4 X12pcs
M6X25mm
STEP 2
CAUTION POINT
~ALL COMPONENT PART MUST BE ALIGN
~ALL SCREWS MUST BE TIGHTEN
M12
M11x 4pcs
NOTES
~PUT THE SIDE PANEL PLATFORM UNDER THE SIDE PANEL
~SCREW SIDE PANEL TO BASE FRAME BRACKET WITH 2
SCREWS ON 2 HOLES EACH FOUR CORNERS
~PLEASE INSTALL THE PANEL STABILIZER AT THE SIDE
PANEL
~SCREW SIDE PANEL TO THE TOP FRAME
~REMOVE THE PANEL STABILIZER & SIDE PANEL PLATFORM
ONCE FINISH SCREW
S6 x 2pcs
M6X35mm
NOTES
~Please use S2 screws on panel stabilizer
for temporary stable the side panel &
remove the it after screw the top panel.
~S2 screws will be re-use on table top later
REV .03
07-11-2022
CARPET FINGER PULL
NOTES
~FOR OPEN BOTTOM PANEL TO ADJUST
THE LEVELER
NOTES
~ALL BOTTOM LEVELLER ARE
ADJUSTABLE WITH ALLEN KEY
~PLEASE ADJUST THE LEVELLER TO
SUITABLE HEIGHT & BALANCE
HORINZONTAL LINE
~OPTIONAL TO ADJUSTMENT AT FIRST
OR LAST OF THE PROCESS
PAGE 9
REV .02
04-10-2022
PAGE 10
END PROFILE
GLASS WALL
GLASS SEAL
CUBE TRIM
NOTES
~PLEASE SCREW CUBE TRIM TO END PROFILE
~BE SURE NO GAP IN BETWEEN GLASS WALL TO
END PROFILE
~PLEASE CLIP CUBE COVER ON TO CUBE TRIM
P1 P2
CUBE COVER
P1 X 22pcs
M6
P1
P2
S2 X 22pcs
STEP 3
STEP 4
STEP 5
REV .02
04-10-2022
PAGE 11
M9
M9
M8
P1
P5
P1 X 28pcs
S2 X 28pcs
S6 X 8pcs
END PROFILE
GLASS WALL
GLASS SEAL
CUBE TRIM
NOTES
~PLEASE SCREW CUBE TRIM TO END PROFILE
~BE SURE NO GAP IN BETWEEN GLASS WALL TO
END PROFILE
~PLEASE CLIP CUBE COVER ON TO CUBE TRIM
P1 P2
CUBE COVER
STEP 6
STEP 7
STEP 8
STEP 9
STEP 10
REV .02
04-10-2022
PAGE 12
DOOR HINGE INSTALLATION DETAIL DOOR KNOB INSTALLATION DETAIL
P3
P4 X 2pcs GLASS DOOR GLASS DOOR
STEP 11 STEP 12
NOTES
~PLEASE ADJUST THE
RUBBER TO FACE RIGHT
SIDE AS THE PHOTO
REV .02
04-10-2022
NOTES
~THE RUBBER AT HINGES IS ADJUSTABLE
MOVE GLASS DOOR LEFT & RIGHT
(RECOMMENDED TO FACE RIGHT SIDE)
DOOR HINGE RUBBER GUIDE
HINGE RUBBER LEFT HINGE RUBBER RIGHT
PAGE 13
S3 X 6pcs
GLASS DOOR SIDE PANEL
HINGE
10mm
M7
P4 X 2pcs
STEP 13
M10 x 2pcs
NOTES
~PUT THE GLASS DOOR PLATFORM BELOW THE
GLASS DOOR DURING INSTALLATION
~10mm GAP IS NEEDED BETWEEN PANEL & GLASS
DOOR
~REMOVE THE GLASS DOOR PLATFORM AFTER
SCREW THE HINGES
REV .02
04-10-2022
PAGE 14
1)POWER PSU
2)LIGHT SENSOR
3)JUKEBOX SOCKET
5)EYEBALL MODEL
4)NETBOX SOCKET
6)LED DIMMER
CABLE CONNECTION GUIDE
POWER SUPPLY
NETBOX SOCKET
OUTLET
1 2 3456
REV .03
02-11-2022
JUKEBOX SOCKET
OUTLET
EYEBALL MODEL
LED DIMMER
7
8
7)FAN
8)LED STRIP LIGHT
PAGE 15
M5
STEP 17
M1
M5
SUPPORT
BRACKET
HOOK ON
REV .02
04-10-2022
PAGE 16
Configuration
CUE-PB-BS1
COMPLETED
Configuration
CUE-PB-DK1
Configuration
CUE-PB-DK3
Configuration
CUE-SOFA-110A
Configuration
CUE-PB-BS1
REV .02
04-10-2022
Configuration
CUE-PB-DK2
S8
JCBC SCREW M6X16mm
x 6pcs
S7
M13 M14
S-AH-CSK-M6X16
x 6pcs
TABLE TOP
x 1pc
TABLE TOP BASE
x 1pc
P7
SOCKET X1 NOS
COMPONENT PACKING LIST
SCREW PACKING LIST
HARDWARE PACKING LIST
Assembly Instruction Model : MUE-CUE-PB-DK1
PAGE 17
REV .02
04-10-2022
CARPET
S7 X 4pcs
PAGE 18
STEP 1
M14
NOTES
~SCREW THE METAL BRACKET TO
BOTTOM FRAME
~PLACE THE CARPET ON IT, WITH THE
COVER RING AS WELL
REV .02
04-10-2022
SOCKET INSTALLATION DETAIL
M13 STEP 3
P7
NOTES
~PLACE THE SOCKET ON THE TABLE
TOP
S7 X 2pcs
S8 X 6pcs
M6X16mm
PAGE 19
M13
STEP 2
NOTES
~SCREW THE TABLE TOP TO THE BASE
REV .02
04-10-2022
PAGE 20
COMPLETED
REV .02
04-10-2022
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28

JasonL CUBEPB-DB-MC Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI