MAG SL100DC Series Installation guide

Category
Gate Opener
Type
Installation guide

MAG SL100DC Series is a complete sliding gate automation system, designed to automate gates weighing up to 600kg. It features a powerful motor, limit switches for precise gate positioning, and a control board with adjustable force settings for obstacle detection. The system also includes a remote control receiver and two transmitters for convenient operation.

With its robust design and comprehensive safety features, the MAG SL100DC Series is an ideal solution for automating gates in residential, commercial, and industrial applications.

MAG SL100DC Series is a complete sliding gate automation system, designed to automate gates weighing up to 600kg. It features a powerful motor, limit switches for precise gate positioning, and a control board with adjustable force settings for obstacle detection. The system also includes a remote control receiver and two transmitters for convenient operation.

With its robust design and comprehensive safety features, the MAG SL100DC Series is an ideal solution for automating gates in residential, commercial, and industrial applications.

© Install_CelmerSL100P - All specification and suggested dimension is for reference only- subject to change without further notice. 1
MAG SL100ACx series is a complete sliding gate automation system.
Components in MAG SL100DCx series
Preliminary check
To ensure trouble-free operation, make sure that the gate (whether existing or yet to be installed) has the following
specification:
Max gate weight 600kg
Strong and rigid leaf frame
Flat leaf face, with no protruding parts and no vertical members
Straight, smooth and even movement of the least over its entire travel
No sideway oscillation of the leaf
Upper and lower sliding system in perfect condition
The use of floor tracking with a rounded channel is preferred because it reduces friction in the sliding
movement
Only two slide wheel
If any welding or brazing is required on the gate, it should be done before installing the automation system. The
condition of the gate structure will have direct affect on the reliability and safety of the automation system. We are
ready to install SL100P after making sure all the above items are checked.
App
lication not
e
1 PVC box
2 Control board
3 Motor
4 Limit switch
5 Mountin
g
bracket
6 Base plate
7 Limit switch stopper
8 Gear rack
9Ke
y
to unlock clutch
10 Pinion
g
ear
11
A
lan ke
y
to release clutch
12 Spacer
(
with screw tread
)
13 Bolt
14 Remote control transmitter
15 Remote control receiver
SL100DCx series –
Sliding gate system
Installation guide
Gate Automatic S
stem
© Install_CelmerSL100P - All specification and suggested dimension is for reference only- subject to change without further notice. 2
Suggested installation steps include the following:
1. Doing the wiring groundwork at installation site
2. Installation of the operator motor
3. Installing control panel to the pillar wall
4. Installation of gear rack to gate
5. Mounting the limit switch stopper to the gear rack
6. Remove 4 extra washers from the motor operator
7. Testing and verifying wiring
** Step 2 and 3 might be interchanged while waiting for the cement base to dry. Special chemical can be added to the
cement base to shorten the dry time.
Standard installation layout
The below typical layout can be used to plan wiring groundwork at actual installation site. Use suitable rigid and/or
flexible pipes for laying power cables. Always keep low voltage accessory cables separated from 230V power cables.
To avoid interference, use separate sheaths. It is suggested to use the following recommended cable specification.
Door Door
frame
Rimlock
Wiring :1,2,
5
is 1.5mm 3 core.3is1.5mm 2 core.4is 2.5mm 3 core.
5
Lock remain secured
during power failure
- weatherproof
Description Wire specification
1 Connectin
g
limit switch si
g
nal from motor to control unit.
(Close, common and open) 3 core, 1.5 mm diameter
2 AC230V power supply from control unit to the motor 3 core, 1.5 mm diameter
3 In door push button for manual control of the gate. 2 core, 1.5 mm diameter
4 AC230V power supply to the control unit 3 core, 2.5 mm diameter
5 Pillar light power supply 3 core, 1.5 mm diameter
© Install_CelmerSL100P - All specification and suggested dimension is for reference only- subject to change without further notice. 3
Installing the motor operator
© Install_CelmerSL100P - All specification and suggested dimension is for reference only- subject to change without further notice. 4
Installing control panel
The PVC box base is mounted onto the wall through using screws. The hole into the control box can be sealed with
silicon to prevent insects, or water to go in.
Wiring conduit
travels underground
and conceals into
the pillar wall
Let the remote control yellow
wire (antenna) come out 3
inch from the PVC box lower
ventilation hole.
Control
board
Remote
control
receiver
Pillar wall
Sideview
F11 control board
UR2 adjustable rotar
y
switch is to adjust the amount of force
(
or wei
g
ht
)
for the controller to interpret as a valid obstacle to pause the gate motion.
Adjusting to the HARD (+) side means that it will required greater amount
of force.
Select limit switch
input mode
(Normally closed –
N.C or normally
opened –N.O). N.O.
option is to be
selected for Celmer
motor.
LDR Sensor
Pillar Light will only
function during the night
Cut the jumper wire to enable brake function to stop the
gate motion. Leave the jumper wire connected (default)
for Celmer. Celmer motor does not require this function.
A
uto Close
Gate will automatically
close after 20 seconds
© Install_CelmerSL100P - All specification and suggested dimension is for reference only- subject to change without further notice. 5
Wiring connection
R30
D4
J6
ML43
R26
R24
R26
R29
R25
D5
C12
RLY5
F2
5A
FUSE
U1
I
C10 D1
D2
R22
R27
317T
J10
CON9
12V
+
-
12V
+
-
D3
J7J4
RL4
R23
NO
NC
RLY2
NO
NC
RLY1
-
+
~
~
NO
NC
RLY3
J6 J2
J8
J9
R21 R34
R35
R32
R31
R33
R19
R20
R17
R18
R14
R13
R12
R11
R10
R9
R8
R7
R6
R5
R4
R3
R15
R16
R1
R2
D8
D9
2003
F11
J5 J1
Q7
C6
C5
C3
C4
C2
FORCE C
O
C1
C9
TIMER HI- SPEED
FORCE
OVERLOAD
SOFT HARD
VR2VR1
LDR
C8
LN
AC230V
PL
LN
TRANSFORMER 21 12 0
12 0 12 DC
MOTOR DC12V OPNCMCLS
LIMITSW CM O/C CL OP
P/SW ONLY NC CM
P/BEAM
C11
OPN CLS OC CL OP
CON7 CON8 CON6 CON5 CON4 CON3 CON2 CON1
LIMIT SWITCH
NO NC
AUTO CLOSE
20S OFF
SW4
0
J3
4Amp
TRANSFORMER
12 0 12
SECONDARY
PRIMARY
230v 0v
BLACK
RED RX
TX
DC12v
Optional
Photo Beam
*
Remove Jumper when
Photo Beam Connected
*
Sliding Gate
DC Motor
LimitSwitch
Motor Coil
Single Push Button
CM O/C
Double Push Button
CM CL OC
Pillar Light
LightSwitch
LN
AC230v LN
AC230v
Note: AC Power Supply and Pillar
Lighting must be same electrical phase
ManualPushButton
Connection
12V7Ah
IN THE CONTROL PANELAT THE GATEINSIDE IN
THE HOUSE
RC330 Remote
Control Receiver
White
Brown/Grey
© Install_CelmerSL100P - All specification and suggested dimension is for reference only- subject to change without further notice. 6
Installing the gear rack
Gear rack mounting location must be parallel to the pinion gear horizontal axis after the operator motor is fully
mounted at that specific installation site. Using alignment liquid level ruler or simply following the gate frame is not an
accurate method. The gear rack location must be determined relative to the pinion gear location. The following is the
method suggested. Release the motor clutch for free rotation during installation.
Now the gear rack horizontal axis should be aligned to be parallel to the pinion gear axis. With minima effort try to
slide the gate back and forth within the gear rack length and make sure the movement is smooth and even.
Repeat the same installation procedure for all subsequent gear racks that are needed to reach the position of
complete closing. Use a section of rack of about 150 mm to ensure that the teeth-to-teeth distance of subsequent
gear rack is spaced correctly - see illustration below.
After installing all the required gear racks, manually check if the gate can open completely and the movements of the
gate is smooth and even. Full weld all the spacer to the gate frame. Tighten the motor clutch back. IMPORTANT: Do
not weld the rack section to the spacers or to each other. Do not apply grease or other lubricant to the pinion and rack.
Slide the
g
ate open b
y
hand. Place the first section
of the rack on the pinion, aligning it with the first
spacer. The pinion gear teeth should fit into the
gear rack teeth with almost no spacing.
Secure the gear rack to gate using a clamp.
Spot weld the first spacer to the gate frame.
Slide the
g
ate towards its closed position until
the third spacer of gear rack is on top of the
pinion gear.
Secure the position of the bolt and spacer to
gate through gear rack's last screw hole.
Spot weld the second and third spacer to the
gate frame
Correct teeth-to-teeth distance at the joint
© Install_CelmerSL100P - All specification and suggested dimension is for reference only- subject to change without further notice. 7
Installing the limit switch stopper
The exact location of the limit switch on gear rack shall be adjusted in such a way that it will be able to trigger the limit
switch at desired fully closed and fully open position. This limit switch act as an indicator to the controller to stop the
gate movement.
Removing the washer from the motor operator
The washer slip into the side of the motor operation during earlier installation is for the convenient and eases of
installing the gear rack. After the gear rack is fully installed, loose the raw bolt screw a little and remove 4 of the top
washer. There will be still remaining 4 washers. Tighten the raw bolt.
This is to allow the motor operator to drop approximately 1.5 mm on vertical axis and easily create required 1.5 mm
gap between the pinion and the gear rack’s teeth. This gap is essential for the gate to move smoother and will not
damage the pinion in the long run.
1.5 mm
CAUTION: Pinion gear will be DAMAGED if there is NO 1.5mm gap.
Final testing and verification
The correct connection of L and R on Celmer motor depends on the
direction it is installed. Therefore as final steps testing, free the clutch,
slide the gate to the center and tighten the clutch.
Turn on the power and press push button to open it. If the gate does not
move to the desired direction, reverse the L and R connection on Celmer
motor.
The limit switch position might also need some fine tuning to make sure the gate is fully closed and fully opened at
desired location. The force or weight of obstacle setting at the control board might need some fine tuning also to make
sure maximum safety.
© Install_CelmerSL100P - All specification and suggested dimension is for reference only- subject to change without further notice. 8
Remote Control
The following diagram illustrates the functions of a remote control.
Press again to CLOSE.
Press once to OPEN.
Press again to STOP.
Press again to CLOSE.
Press once to OPEN.
Press again to STOP.
Button Functions
Button 1 and button 2 on the wireless remote
control transmitter has the same function.
Press once to OPEN.
Press again to STOP.
Press again to CLOSE.
If the operating range of the remote control
weakens, please check the battery in the
remote control transmitter. Battery needs to
be changed every 3 months depending on the
frequency of usage. Type of battery used is
AE23, 12V.
Batter
y
slot
AE23, 12V
Matchin
g
codin
g
between transmitter
and receiver
Remote control transmitter
opened.
Ever
y
set of remote control consist of transmitter and receiver. Each transmitter transmission codin
g
is exact match to the receiver. There are 6561 variation of coding available by setting through DIP
switch. User can set to any coding desired. For security reason, it is recommended that user
change the coding from the default setting for higher security.
Operatin
g
the
g
ate with remote control
© Install_CelmerSL100P - All specification and suggested dimension is for reference only- subject to change without further notice. 9
Manual Operation
Should the need arise to operate the gate manually because of power failure or malfunction, release the clutch so that
the motor are free to rotate. This can be done with the following procedure:
CAUTION: DO NOT turn the Alan key all the way to the end – this will cause the clutch to be completely
disengage from the gear system and unable to be tighten back later. Turn the Alan key only 2 round or less
will be able to free the clutch for manual sliding. The clutch needs to be tighten back for the automatic gate
system to resume operation.
Optional installation of photo beam
The approved photo beam to be used together with SL100P system is ART104 from DEA (Italy). Photo beam is to be
installed on the wall pillar facing each other aligning to an horizontal axis. The corresponding jumper wire on F1 board
needs to be cut to enable photo beam function. The following is the detailed wiring of the photo beam:
NO
-
CNC
+
AC24V - shared power
supply with remote
control receiver. Common CM
share with limit switch
PIB input F1 control panel
Power selection
No jumper - AC24V
W
ith jumper - DC12V
-
+
AC24V - shared power
supply with remote
control receiver.
Power selection
No jumper - AC24V
With jumper - DC12V
Transmitter (TX)
Receiver (RX)
IR beam passing horizontal across
the gate entrance. Trigger signal
will be sent to control board once
IR beam is blocked by obstacle.
pillar wall
© COPYRIGHT 20 Feb 2012. All diagrams are for illustration only and does not necessary reflect the actual exact assembly/installation. This
documentation served as a reference only. It is subject to change without further notice. All the diagrams and information in this documentation
may not be duplicated or modified in any form without the written approval from MAG®.
1
)
Use the ke
y
supplied to unlock the
clutch
2) Turn the Alan key TWO round anti-
clockwise to release the clutch
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9

MAG SL100DC Series Installation guide

Category
Gate Opener
Type
Installation guide

MAG SL100DC Series is a complete sliding gate automation system, designed to automate gates weighing up to 600kg. It features a powerful motor, limit switches for precise gate positioning, and a control board with adjustable force settings for obstacle detection. The system also includes a remote control receiver and two transmitters for convenient operation.

With its robust design and comprehensive safety features, the MAG SL100DC Series is an ideal solution for automating gates in residential, commercial, and industrial applications.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI