LAUREL CANYON HPG-1010 User manual

Type
User manual

This manual is also suitable for

10'x10' Pergola
WARNING:
Fabric meets CPAI-84 specification for flame resistance. It is Not
Fire Proof. The fabric will burn if left in continuous contact with
any flame source. The application of any harsh chemicals to the
fabric may render the flame-resistant properties ineffective.
Always read and follow the instructions before use. When assembling
and using this product, basic safety precautions must always be fol
lowed to reduce risk of personal injury and damage to the product or
surroundings.
Be sure to keep all children and pets away from assembly area. Some
parts contain sharp edges. Wear protective gloves when handling these
items. It is recommended that, for safety issues, at least 2 people as
semble the pergola. It may take to 90 minutes to assemble this pergola.
It is important to schedule enough time to complete the assembly. You
should not leave the unit unattended if it is not fully assembled, even if
it is already anchored to the ground. You should begin the assembly no
less than 6 feet from any permanent structures such as fences,a garage,
a house, overhanging branches, electrical wires or laundry lines. You
must assemble your unit on level ground or a platform.
The unit must be anchored to the ground with proper anchors. Failure
to do so may risk it blowing away.
Check that all screws are tight before and during usage. Do not place
any type of heat conductor or source under, or within 5 feet of the unit
including, but not limited to, a barbeque or space heater.
The pergola is designed to provide shade only. Do not use this pergola
in strong wind and rain. Wind and rain can damage the pergola and
could result in injury to you and others. It is recommended that the Canopy
be removed during strong winds and stormy conditions.
Check all available parts. Before assembling the pergola, check to make
sure you have all the parts listed in the Parts List.
PARTS LIST
Description
Post
Cross Beam
Cross Beam
Cross Beam
Cross Beam
Roof Tube
Pulling Rod
Pulling Rod
Guide Tube
Bracket
Corner Support
Corner Support
Bracket
Bracket
Post Decoration
Base Plate Cover
Post Hoof
Shade Fabric
Sketch QTY.
Bolt
Bolt
Bolt
Bolt
Anchor
Allen Key
Roof Tube
4 pcs
2 pcs
2 pcs
2 pcs
2 pcs
6 pcs
2 pcs
2 pcs
4 pcs
8 pcs
4 pcs
4 pcs
4 pcs
4 pcs
4 pcs
4 pcs
4 pcs
2 pcs
84 pcs
8 pcs
2 pcs
12 pcs
8 pcs
8 pcs
6 pcs
A1
B1
B2
C1
C2
D1
E1
E2
F
G
H1
H2
M
N
O
R
S
P
AA
BB
CC
DD
EE
FF
D2
M6x12mm
M6x35mm
M6x55mm
M6x75mm
Assembly
STEP 1
A1
B1
C2
Fig. 1 Fig. 2
Fig. 1
R
S
B1
C2
A1
DD
N
BB
Fig. 2
O
O
A1
R
S
AA
Fig.1: Let Post Decoration (R) pass through Post (A1) first. Then use Bolt (M6x12) (AA) to
connect Post (A1) and Post Hoof (S).
Fig.2: Let Post Decoration (O) pass through Post (A1) first. Please make sure to complete
this steps before next following steps. Then use Bolt (M6x75) (DD) and Bracket (N) to assemble
Cross Beam (C2) and Cross Beam (B1) to Post (A1).
Use Bolt (M6x35) (BB) to connect Post Decoration (Q) and Cross Beam (C2).
Repeat these instructions for the other posts.
Assembly
STEP 2
A1
B2
C1
Fig. 3 Fig. 4
A1
R
AA
Fig. 3
A1
B2
C1
O
BB
NDD
O
Fig. 4
S
Fig.3: Let Post Decoration (R) pass through Post (A1) first. Then use Bolt (M6x12) (AA) to
connect Post (A1) and Post Hoof (S).
Fig.4: Let Post Decoration (O) pass through Post (A1) first. Please make sure to complete
this steps before next following steps. Then use Bolt (M6x75) (DD) and Bracket (N) to assemble
Cross Beam (C1) and Cross Beam (B2) to Post (A1). Use Bolt(M6x35) (BB) to connect Post
Decoration (Q) and Cross Beam (C1).
Repeat these instructions for the other posts.
Assembly
STEP 3
A1 H1 H2
C2
C1
C1
C2
B1
B2
B2
B1
H1
H2
Fig. 5
Fig. 5
Fig. 5
B1 / C1
B2 / C2
AA
Fig. 6 Fig. 7
Fig. 6
A1
A1
A1
Fig. 7
Fig. 7
A1 H1
H2
AA
H1 / H2
AA
B1 / B2 / C1 / C2
Fig. 8
Fig. 8
FF S
Fig.5: Use Bolt (M6x12) (AA) to connect Cross Beam (B1)
and Cross Beam (B2).
Use Bolt(M6x12) (AA) to connect Cross Beam (C1) and
Cross Beam C2.
Fig.6: Use Bolt(M6x12) (AA) to connect Connector (H2/H1)
and Post (A1).
Fig.7: Use Bolt(M6x12) (AA) to connect Connector (H2/H1)
and Cross Beam (B1/B2/C1/C2).
Fig.8: Hammer Anchors (FF) through one of the holes at
each post base, into the ground to stablize the .
Repeat these instructions for the other posts.
Assembly
STEP 4
Fig. 9 Fig. 10
D1
D2
D1
D2
D1
D2
AA
Fig. 9
B1 / B2
CC
D1 / D2
F
F
G
G
G
Fig. 12
Fig. 11
Fig. 10
Fig. 10
Fig. 12
AA
A1
F
G
Fig.9: Use Bolt(M6x12) (AA) to connect Roof Tube (D1) and
Roof Tube (D2).
Fig.10: Use Bolt (M6x55) (CC) to assemble Roof Tube (D1/D2)
and Cross Beam (B1/B2).
Repeat these instructions for the other roof tubes.
Fig.11: At the bottom of Post (A1), using Bolt (AA) to connect
Bracket (G) and Post (A1). Insert Guide Tube (F) through to
Bracket (M) , then to Bracket (G).
Fig.12: At the top of Post (A1), insert Guide Tube (F) to Bracket
(G), then using Bolt (AA) to connect Bracket (G) and Post (A1).
Repeat these instructions for the other roof tubes.
Fig. 11
F
G
A1
AA
M
Assembly
STEP 5
P
Fig. 13 Fig. 14
E1
E2
CLICK!
Fig. 13
P
E1
E2
E1
Fig. 14
E1 & E2
P
Fig. 13
Fig.13: Insert the Pulling Rod (E1) to Pulling Rod (E2).
Fig.14: Pass the 2pcs Shade Fabric (P) through the Roof Tube (D1/D2) in turn as above diagram.
Insert the Pulling Rod (E1/E2) to Shade Fabric. After assembled, please pull the Shade Fabric,
make sure it runs smoothly.
Fig.15: Using Bolt (AA) to connect Bracket(M) to Pulling Rod(E1/E2).
Fig. 15
F
AA
M
Any questions on assembly or parts, please contact: [email protected]
Made in china
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8

LAUREL CANYON HPG-1010 User manual

Type
User manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI