Gardman R637 Operating instructions

Type
Operating instructions

This manual is also suitable for

Assembly instructions for Gardman screening
Adhering to an already existing fence
1. Remove screening from the package.
2. Slow unfurl the screening. Do not pull it or stretch it, as this can cause a gap to develop
between the slats.
3. Wire or zip ties are proven to be the best ways to secure this to an existing fence.
4. Measure the area you intend to apply the screening to. It is recommended that ties should
be applied horizontally and vertically at 1 foot intervals. For example, the 3 foot screening
would have 3 vertical ties, the 5 foot would have 5 ties , and the 6 foot would have 6 ties.
Repeat this process every 1 foot across until you have reached the end of the 13 foot
screening.
Total ties used:
3 foot-3x13=39
5 foot-5x13=65
6 foot-6x13=78
5. Stand back and enjoy the beautiful transformation of your yard or garden.
Free standing fence
1. Hammer stakes into ground at 1 foot intervals.
2. Follow instructions above for adhering to stakes.
3. Follow item 5 religiously.
  • Page 1 1
  • Page 2 2

Gardman R637 Operating instructions

Type
Operating instructions
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI