Anritsu IQ Fiber Master MT2780A User manual

  • Hello! I am an AI chatbot trained to assist you with the Anritsu IQ Fiber Master MT2780A User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Part Number: 10580-00467
Revision: B
Published: April 2020
Copyright 2020 Anritsu Company, USA. All Rights Reserved.
Anritsu Company
490 Jarvis Drive
Morgan Hill, CA 95037-2809
USA
http://www.anritsu.com
User Guide
IQ Fiber Master™
MT2780A
Sensor and Analyzer for LTE RF over CPRI and PIM over CPRI
Front-2 PN: 10580-00467 Rev. B MT2780A UG
MT2780A UG PN: 10580-00467 Rev. B Contents-1
Table of Contents
Chapter 1 — Introduction to IQ Fiber Master
1-1 Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
1-2 IQ Fiber Master Basics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
Sensor Power and Network Connections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
Sensor and Tap Ports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
Connecting the IQ Fiber Master . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-2
1-3 Trademark Acknowledgments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
1-4 Warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
Limitation of Warranty . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
Disclaimer of Warranties . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
No Liability For Consequential Damages . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
1-5 Regulatory Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
Trademark Acknowledgments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-5
Notice . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6
Updates . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-6
Product Compliance, and Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-7
Chapter 2 — Installation and IQ Fiber Master Analyzer Basics
2-1 Installation of the IQ Fiber Master Control Software (MX280020A) . . . . . . . . . . . . . . . . . . . . . 2-1
Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Installation of IQ Fiber Master Control Software . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
Preliminary Configuration Checking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-4
Final Configuration Checking . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-5
Connecting to the Tap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-6
2-2 Main Window Features. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-8
2-3 Main Menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
File. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-9
View. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-10
Help . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-11
Sensor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-12
2-4 Preparation Tabs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-16
Site Editor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-16
Roster Editor . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-21
Run Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-23
2-5 Analysis Tabs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-25
Analyzer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-25
PIM vs Time. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-27
PIM Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-28
PIM Daily (for PIM Failure) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-29
Heat Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-30
PIM Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-32
2-6 Control Buttons . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-32
2-7 Status Line . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-33
IQ Master User Guide
Contents-2 PN: 10580-00467 Rev. B MT2780A UG
2-8 Upgrading IQ Fiber Master . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-34
2-9 Preferences. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-35
General Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-35
dB Units . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-36
Plot Settings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-37
Config Check Rules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-38
Heatmap Rules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-40
Chapter 3 — Making LTE RF over CPRI Measurements (Option 752)
3-1 Preparing the Site’s Details (Site Editor). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
Auto-detect a Site’s Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
Manual Editing (Advanced View). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-2
Load an Existing Configuration File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-3
3-2 Site Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-4
3-3 Starting the LTE RF over CPRI Mode. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-5
Export Image... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-6
Settings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-7
Axes. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-8
Plot. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9
Traces . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-9
Markers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-12
Capture & Playback . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-15
Advanced (Set the Noise Floor). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-16
Zoom . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-21
3-4 Stopping/Restarting LTE RF over CPRI Mode . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-24
Chapter 4 — Making PIM-over-CPRI Measurements (Option 754)
4-1 Preparing the Site’s Details (Site Editor). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
Auto-detect . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
Manual Editing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
Existing File . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-3
4-2 Site Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-4
4-3 Editing the List of Test Scenarios (Roster Editor) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5
4-4 Select a Test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5
4-5 Configuration Check . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6
Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-6
4-6 PIM Measurement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7
4-7 Analyzer: PIM over CPRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8
Main Buttons and Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-8
Context Menu . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-9
4-8 PIM Location, Distance, and Calibration. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13
Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-13
PIM Calibration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-15
PIM Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-17
Auxiliary PIM Location Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-18
4-9 Cross-Sector Analysis. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-19
IQ Master User Guide
MT2780A UG PN: 10580-00467 Rev. B Contents-3
Chapter 5 — PIM Analytics (Option 755)
5-1 PIM vs Time (Long-term Monitoring) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-1
Events.... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
Clear . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
LoadFile... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
Save File.... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
Previous/Next . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
Date/Summary. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-2
5-2 PIM Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-3
5-3 PIM Daily Report. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-4
5-4 Heat Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5-5
Appendix A — Reports
A-1 PIM over CPRI Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1
New Report . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1
Report Header . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-2
Check Configuration . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-3
PIM Level. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-4
PIM vs. Time . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-5
PIM Distribution . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-6
PIM Daily (Long-term Monitoring) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-7
Heat Map . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-8
PIM Location . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-8
A-2 LTE RF over CPRI . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-9
IQ Master User Guide
Contents-4 PN: 10580-00467 Rev. B MT2780A UG
MT2780A UG PN: 10580-00467 Rev. B 1-1
Chapter 1 — Introduction to IQ Fiber Master
1-1 Introduction
This guide provides setup instructions for the connection and usage of the PIM over CPRI and LTE RF over
CPRI sensor and analyzer.
LTE RF over CPRI differs from PIM over CPRI in these ways:
LTE RF over CPRI (Option 752): Provides full spectral analysis of CPRI IQ streams either in absolute or
relative frequency, and of LTE UL and DL signals. This function is analogous to a spectrum analyzer.
PIM over CPRI (Option 754): (Requires options 752) Supports multiple PIM configurations while
measuring PIM power level. Provides distance-to-PIM (DTP). PIM over CPRI measures PIM against live
traffic to provide a truer picture of the impact of PIM at a cell site.
PIM Analytics (Option 755): (Requires options 752 and 754) Provides, PIM vs. Time, PIM distribution,
PIM daily, and Heat Map data views. Reports include detailed pass/fail configuration check, long-term
(24-hour) monitoring, a pass/fail of each UL showing the external or internal nature of failures, and UL
and PIM spectra for each antenna branch.
1-2 IQ Fiber Master Basics
This section gives quick instructions in setting up and using the IQ Fiber Master sensor, MT2780A.
Sensor Power and Network Connections
Figure 1-1 shows the power and network connections for the IQ Fiber Master.
1. Power input port
2. Ethernet Port (primary)
3. Ethernet Ports (synchronization)
(The remaining ports are reserved for future use.)
Figure 1-1. IQ Fiber Master Network and Power Connections
1
3
2
1-2 IQ Fiber Master Basics IQ Master User Guide
1-2 PN: 10580-00467 Rev. B MT2780A UG
Sensor and Tap Ports
This diagram locates the ports on the sensor and the tap.
Connecting the IQ Fiber Master
To connect the IQ Fiber Master:
1. Connect computer to the Web.
2. Connect an Ethernet cable from computer to the IQ Fiber Master sensor, (1) in Figure 1-1. You may also
use an Ethernet hub to connect the computer to the sensor. Local IT might have restrictions regarding
this scheme.
1. Sensor Power light
2. Sensor Status light
3. Status lights for Small Form Pluggables (SFPs)
4. SFP modules (optional; see the Technical Data Sheet 11410-01153 for specific, recommended SPFs)
5. Tap ports (see the Technical Data Sheet 11410-01153 tap part numbers)
Figure 1-2. Sensor (top) and Tap (bottom) Ports and Status Lights Identification
1
2
3
5
4
IQ Master User Guide 1-2 IQ Fiber Master Basics
MT2780A UG PN: 10580-00467 Rev. B 1-3
3. Connect power to the IQ Fiber Master, (2) in Figure 1-1, and wait for status light (STS) to turn green.
4. Start the app.
The analyzer will take several seconds to recognize the sensor and draw the license data from it.
5. On the Site Editor tab:
a. Press the menu arrow in the Sensor: field.
b. Select the sensor by serial number.“Status Line” on page 2-33
1. Power input port
2. Ethernet Port (primary)
3. Ethernet Ports (synchronization)
(The remaining ports are reserved for future use.)
Figure 1-3. IQ Fiber Master Network and Power Connections
Figure 1-4. Selecting Sensor Serial Number
1
3
2
1-2 IQ Fiber Master Basics IQ Master User Guide
1-4 PN: 10580-00467 Rev. B MT2780A UG
6. Press Connect.
7. Sensor and SFP statuses are shown in the bottom bar. See “Status Line” on page 2-33 for more about
status.
If you press File>Licensing, this dialog displays with the license key automatically entered into the
License Key field, the sensor ID in the Machine ID field, and the licensed options:
Figure 1-5. Connecting IQ Fiber Master
Figure 1-6. Sensor Connection Status
Figure 1-7. License Key and Machine ID Location
IQ Master User Guide 1-3 Trademark Acknowledgments
MT2780A UG PN: 10580-00467 Rev. B 1-5
1-3 Trademark Acknowledgments
The following trademark acknowledgments are listed for one or more of the products mentioned in this
publication:
Windows, Microsoft Paint, Microsoft Word, Microsoft Access, Microsoft Excel, Microsoft PowerPoint, and
Visual Studio are registered trademarks of Microsoft Corporation.
USB ports (2.0 and C) is a trademarkof the USB Implementers Forum, Inc
Intel i7 and i3 are registered trademarks of Intel Corporation
BTS Master, Cell Master, LMR Master, PIM Master, Site Master, Spectrum Master, VNA Master,
easyMap Tools, and Distance-to-PIM are trademarks of Anritsu Company.
All other trademarks mentioned are the property of their respective companies.
1-4 Warranty
The Anritsu sensor described in this guide is warranted against defects in materials and workmanship for
three (3) years from the date of shipment. The accessories are warranted against defects in materials and
workmanship for one (1) year from the date of shipment. Anritsu’s obligation covers repairing or replacing
products which prove to be defective during the warranty period. Buyers shall prepay transportation charges
for equipment returned to Anritsu for warranty repairs. Obligation is limited to the original purchaser.
Anritsu is not liable for consequential damages.
Limitation of Warranty
The foregoing warranty does not apply to Anritsu connectors that have failed due to normal wear. Also, the
warranty does not apply to defects resulting from improper or inadequate maintenance, unauthorized
modification or misuse, or operation outside of the environmental specifications of the product. No other
warranty is expressed or implied, and the remedies provided herein are the Buyer’s sole and exclusive
remedies.
Disclaimer of Warranties
To the maximum extent permitted by applicable law, Anritsu Company and its suppliers disclaim all
warranties, either expressed or implied, including, but not limited to, implied warranties of merchantability
and fitness for a particular purpose, with regard to the product. The user assumes the entire risk of using the
product. Any liability of provider or manufacturer will be limited exclusively to product replacement.
No Liability For Consequential Damages
To the maximum extent permitted by applicable law, in no event shall Anritsu Company or its suppliers be
liable for any special, incidental, indirect, or consequential damages whatsoever (including, without limitation,
damages for loss of business profits, business interruption, loss of business information, or any other pecuniary
loss) arising out of the use of or inability to use the product, even if Anritsu Company has been advised of the
possibility of such damages. Because some states and jurisdictions do not allow the exclusion or limitation of
liability for consequential or incidental damages, the above limitation may not apply to you.
1-5 Regulatory Compliance
Trademark Acknowledgments
IQ Fiber Master is a trademark of Anritsu Company. Windows is a registered trademark of Microsoft
Corporation. Intel CORE i7 and i3 are a registered trademarks of Intel Corporation. All other trademarks
mentioned are the property of their respective companies.
1-5 Regulatory Compliance IQ Master User Guide
1-6 PN: 10580-00467 Rev. B MT2780A UG
Notice
Anritsu Company has prepared this manual for use by Anritsu Company personnel and customers as a guide
for the proper installation, operation, and maintenance of Anritsu Company equipment and computer
programs. The drawings, specifications, and information contained therein are the property of Anritsu
Company, and any unauthorized use is prohibited; they shall not be reproduced, copied, or used in whole or in
part as the basis for manufacture or sale of the equipment or software programs without the prior written
consent of Anritsu Company.
Updates
For additional information and literature covering your product, visit the product page of your instrument on
http://www.anritsu.com and select the Library tab.
Updates, if any, may be downloaded from the Anritsu Website.
For the latest service and sales contact information in your area, please visit:
http://www.anritsu.com/contact-us.
Not all instrument models offer every option. Please refer to the Technical Data Sheet of your instrument for
available options.
IQ Master User Guide 1-5 Regulatory Compliance
MT2780A UG PN: 10580-00467 Rev. B 1-7
Product Compliance, and Safety
Warning
Laser radiation may be present at fiber-optic cable connectors and ports. This laser radiation
could present a nominal ocular hazard from either direct viewing or by diffuse reflection. Do
not view the emitted laser radiation directly or indirectly because damage to the eye or
permanent blindness may result.
This family of product works in conjunction with class 1 laser products. Work should only be
undertaken by trained individuals. Proper precaution should be taken when using class 1
lasers and fiber optics.
The CE mark is a registered trademark of the European Community.
The WEEE mark is a registered trademark of the European Community.
The RCM mark is a registered trademark of the Australian Communications and Media
Authority.
Administrative Measure on the Control of Pollution Caused by Electronic Information
Products is a Chinese government regulation to control hazardous materials.
Anritsu affixes the Korean Communications Commissions (KCC) mark onto its conforming
products in accordance with the electromagnetic compliance regulations of Korea.
1-5 Regulatory Compliance IQ Master User Guide
1-8 PN: 10580-00467 Rev. B MT2780A UG
MT2780A UG PN: 10580-00467 Rev. B 2-1
Chapter 2 — Installation and IQ Fiber Master
Analyzer Basics
2-1 Installation of the IQ Fiber Master Control Software (MX280020A)
This guide helps those personnel familiar with computers and test and measurement equipment to understand
the IQ Fiber Master sensor, tap, and accompanying software, and to understand detecting and locating PIM.
Requirements
Ensure that the computer (laptop, desktop, or tablet) meets these minimum requirements:
Windows 10 (recommended; Windows 7 minimum)
10 GB RAM memory (recommended; 8 GB minimum)
Intel CORE i7 (recommended; Intel i3-6100 or AMD FX4350 minimum)
16 GB long-term storage (recommended; 8 GB minimum) 142 MB free
USB ports (2.0 and C)
Network port
Installation of IQ Fiber Master Control Software
To install the IQ Fiber Master Control Software (p/n MX280020A) onto a computer:
1. If IQ Master MS280020A is previously installed, go to Control Panel>Programs> Programs and Features
to uninstall the program.
2. Download the software installer file (e.g., iq-fiber-master-offline-1.7.4.14.exe) and the repository file (e.g.,
repository-1.7.4.14.zip) from the Downloads page for IQ Fiber Master from
www.anritsu.com. Make sure
that the version numbers match (e.g., 1.7.4.14).
3. Run the installation executable.
4. Press Next on the IQ Fiber Master Setup Welcome screen.
5. Choose the application installation folder.
6. Choose from these components to install (choose both for a new or replacement installation):
IQ Fiber: This is the main GUI application.
IQ Fiber Master Firmware: If you need to upgrade the firmware in the hardware sensor.
(See “Sensor” on page 2-12 for information about updating firmware for the sensor.)
7. Read and accept the License Agreement.
8. Choose the Start Menu shortcuts in which to place the application shortcut.
9. Press Install on the Ready to Install screen.
If you want to run IQ Fiber Master immediately, check Run IQ_Fiber_Master now. Without a sensor
connected however, you choice of sensor will be limited to Sensor Emulation.
10. Press Finish.
2-1 Installation of the IQ Fiber Master Control Software (MX280020A) IQ Master User Guide
2-2 PN: 10580-00467 Rev. B MT2780A UG
If you want to view a demo of the app, select 3. Run Tests tab, then press Help>Walkthrough. You can press the
arrows to view the demo to get an overview of the app, or press the red X any time to leave it. You may view the
demo at any time.
Note
Firewalls, such as Windows Defender or Windows Firewall, might ask for permission to run, install,
or communicate on behalf of the app. Check with your local IT department to ensure that the
analyzer has the appropriate permissions.
Some analyzer features require options 752, 754, or 755.
IQ Master User Guide 2-1 Installation of the IQ Fiber Master Control Software (MX280020A)
MT2780A UG PN: 10580-00467 Rev. B 2-3
2-1 Installation of the IQ Fiber Master Control Software (MX280020A) IQ Master User Guide
2-4 PN: 10580-00467 Rev. B MT2780A UG
Preliminary Configuration Checking
Configuration checking for any test is accomplished by building and saving, or loading a Site Configuration
(sector-mapping to optical-fiber) file and a (test) Roster file. The Site Editor and Roster Editor tabs maintain
contents of the files, which can be done ahead of time, if site data are known.
1. Connect to the Fiber Master sensor. See “Connecting the IQ Fiber Master” on page 1-2.
2. Load a Site configuration file into the Site Editor tab.
3. Edit the settings as desired.
4. Press Apply, if edits are made.
5. Load a Roster configuration file into the Roster Editor tab.
6. Edit the settings as desired.
7. Press Apply, if edits are made.
8. Press the Run Tests tab.
The analyzer checks the tests and posts available or invalid test in the Status column.
Figure 2-1. Preliminary Configuration Test Suite
IQ Master User Guide 2-1 Installation of the IQ Fiber Master Control Software (MX280020A)
MT2780A UG PN: 10580-00467 Rev. B 2-5
Final Configuration Checking
After the preliminary configuration check and the fiber connections are complete, the system is ready for the
final configuration check.
To final-check a configuration:
1. Select Config Check test.
2. Press Run: config check to check that the parameters pass.
More details about configuration checking are contained in “Configuration Check” on page 4-6, and
“Config Check Rules” on page 2-38.
3. The PIM Level button should activate. The results of the Configuration Check, failure or success, are
displayed in the Results box.
Figure 2-2. Configuration Check Status
Figure 2-3. Running a Configuration Check
Figure 2-4. Configuration Check Status
2-1 Installation of the IQ Fiber Master Control Software (MX280020A) IQ Master User Guide
2-6 PN: 10580-00467 Rev. B MT2780A UG
Connecting to the Tap
The analyzer provides a diagram, based on data in the Site and Roster Editor tabs, to show how to connect the
fibers from the BBU and RRH to the sensor and tap. If multiple tests are defined (for example, several tests are
defined in the configuration), it is likely each will have its own, different, fiber-connectivity diagram.
To connect to the Tap:
1. Power up the sensor and ensure the analyzer is connected (refer to the status bar at its bottom).
2. Load Site and Roster data, and press Apply.
3. Select a test on the Roster Editor tab by pressing it; the highlighted test will be shown in green.
4. Press the Run Tests tab.
5. Press the Fiber Diagram button.
This shows a graphic of the fiber connections based on data in the Site and Roster tabs. You can
physically make the connections as shown.
Figure 2-5. Selecting a Test from a Site Roster
Figure 2-6. Generating a Fiber Diagram
/