Sioux Chief 863-FN, 832-4HNQV, 863-325NR, 863-325NRT, 863-335NRT, 863-43NRT, 863-44NRT, 863-FA, 863-HA23, 863-HA23T, 863-HP23 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Sioux Chief 863-FN Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
1 Set Drain
Connect the Finish Line Rough-in Fixture to the piping
system as you would a typical fl oor drain or cleanout.
Adjust the fi xture, by threading the coring sleeve up or
down, so the top is fl ush to the concrete pour level.
2 Pour Concrete
The concrete is poured level with the top of the Rough-in
Fixture. The concrete contractor can easily power-trowel
the slab and eliminate the need to hand fi nish around
fi x t u r e s .
3 Remove Coring Cap
Remove the temporary coring cap by breaking through
the protective label, inserting pliers into the slot, and
threading the plug out from the coring sleeve.
4 Install Finish Fixture
The fi nish fi xture (head adapter and strainer or cover)
can then be installed and adjusted up or down to meet
the fi nished fl oor covering. For fi nished concrete fl oors,
permanently secure the fi nish fi xture by applying silicone
to the threads.
Installing the Finish Line
5 Adjust Finish Fixture
Strainers and covers may be set to the proper height by
the fl ooring contractor. Adjustments can be made up to
1 ¼" higher than the top of the coring sleeve.
A Perfect Finish Every Time!
Achieve a perfect fi nish to each strainer or cover every
time. Threading adjustments allow for the proper height
with every installation.
/