Project Source Vinyl Flush Mount Stair Nose Moisture Proof Moulding User manual

Type
User manual
|1
Vinyl Stair Nose Moulding Installation Instructions
6/2023
Vinyl Stair Nose Moulding
Installation Instructions
The Project Source Vinyl ush mount stair nose is a moisture proof moulding that is suitable to
nish step downs and stair installations. The Project Source Vinyl ush mount stair nose is designed
for versatility and beauty. One moulding can accommodate a wide range of oor thicknesses, from
2mm up to 7.5mm in thickness. The width of the stair nose provides a more polished nished stair
tread than other products. The longer length will accommodate more stairs and can be used on
bull-nosed and squared-nosed stair installations. Just follow these simple steps.
78-3/4 in · 2m
Overlap without shim
Flooring
Flush mount with shim
Flooring
Shim
Step 1: Measure and trim to t.
For ush installation, install matching shim to the edge of the stair tread.
A shim is not required for overlap installation.
|2
Vinyl Stair Nose Moulding Installation Instructions
6/2023
Vinyl Stair Nose Moulding
Installation Instructions
Step 2: Apply polyurethane adhesive to underside.
“S” shaped bead on ribbed surface of nosing.
Straight bead under stand-o elbow.
Overlap without shimFlush mount with shim
Step 4: Let adhesive cure for at least 4 hours before walking on it.
Wait 24–48 hours for full trac exposure.
Step 3: Carefully position the trim and press down rmly along the entire stair nose.
  • Page 1 1
  • Page 2 2

Project Source Vinyl Flush Mount Stair Nose Moisture Proof Moulding User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI