Active Ventilation KV-9-GR Installation guide

Type
Installation guide

This manual is also suitable for

Active Ventilation Products, Inc.
311 First Street, Newburgh, NY 12550-4857
800-ROOF VENT (766-3836) Ph: 845-565-7770 Fax: 845-562-8963
Website: roofvents.com Email: [email protected]
5778-11
Installation Instructions for KV-9
For EPDM Membrane Roof or Hot Tar Roof
Page 1 of 2
Step 1:
Turn the vent upside down and make a
cardboard template from the ange. The
template should be the same size as the ange
with the hole in the middle.
Step 2:
Using the template, trace the square and circle
unto the roof as shown.
Step 3:
Remove cardboard template to show the
square and circle pattern shown.
Step 4:
With a razor blade, cut the circle traced out
unto the membrane and remove. Then with a
reciprocating saw, cut a hole in the roof deck
and remove all debris.
Active Ventilation Products, Inc.
311 First Street, Newburgh, NY 12550-4857
800-ROOF VENT (766-3836) Ph: 845-565-7770 Fax: 845-562-8963
Website: roofvents.com Email: [email protected]
5778-11
Installation Instructions for KV-9
For EPDM Membrane Roof or Hot Tar Roof
Page 2 of 2
Step 5:
Apply sealant within the square ange outline.
Step 6:
Place vent within the square outline & attach
using a screw gun or drill.
Step 7:
Required screw: #10 x 1.5" steel sheet metal
screw total number of screws required = 16
(tolerance: 1/2")
Step 8:
Apply roong cement over the screws and
edge of ange. This is how the Keepa Vent
should look when nished.
Width of Flange
15" [38.10cm]
Length of Flange
15" [38.10cm]
Diameter of Opening
9" [22.86cm]
1" [2.54cm]
3 1/4" [8.26cm]
1" [2.54cm]
  • Page 1 1
  • Page 2 2

Active Ventilation KV-9-GR Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI