KV-5-BL

Active Ventilation KV-5-BL Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Active Ventilation KV-5-BL Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Active Ventilation Products, Inc.
311 First Street, Newburgh, NY 12550-4857
800-ROOF VENT (766-3836) Ph: 845-565-7770 Fax: 845-562-8963
Website: roofvents.com Email: [email protected]
5778-11
Installation Instructions for KV-5
For EPDM Membrane Roof or Hot Tar Roof
Page 1 of 2
Step 1:
Turn the vent upside down and make a
cardboard template from the ange. The
template should be the same size as the ange
with the hole in the middle.
Step 2:
Using the template, trace the square and circle
unto the roof as shown.
Step 3:
Remove cardboard template to show the
square and circle pattern shown.
Step 4:
With a razor blade, cut the circle traced out
unto the membrane and remove. Then with a
reciprocating saw, cut a hole in the roof deck
and remove all debris.
Active Ventilation Products, Inc.
311 First Street, Newburgh, NY 12550-4857
800-ROOF VENT (766-3836) Ph: 845-565-7770 Fax: 845-562-8963
Website: roofvents.com Email: [email protected]
5778-11
Installation Instructions for KV-5
For EPDM Membrane Roof or Hot Tar Roof
Page 2 of 2
Step 5:
Apply sealant within the square ange outline.
Step 6:
Place vent within the square outline & attach
using a screw gun or drill.
Step 7:
Required screw: #10 x 1.5" steel sheet metal
screw total number of screws required = 8
(tolerance: 1/2")
Step 8:
Apply roong cement over the screws and
edge of ange. This is how the Keepa Vent
should look when nished.
Width of Flange
10" [25.40cm]
Length of Flange
10" [25.40cm]
Diameter of
Opening
5" [12.69cm]
1" [2.54cm]
4" [10.16cm]
1" [2.54cm]
/