Fresh Air Screens 1231-C-168-RP Operating instructions

Type
Operating instructions
Installation Instructions
Models C with Rope & Pull Kit
STEP 1
Cut the roll of self-adhesive hook & loop into 3 strips, two lengths equal to the height of the
door jambs, and one long strip for the header.
STEP 2
Install and align the self-adhesive hook & loop strips on both door jambs about 1” in front
(street side) of the door stops/weather strips. Next add the hook & loop strip to the header, so
that is allows a smooth surface edge with both door jamb strips.
STEP 3
Starting at either upper corner, attach the screen to the hook & loop strip which is mounted
already on the header. Next attach the screen to the hook & loop strips that are mounted on
either of the door jambs of the garage door.
STEP 4 Attach cleat to the door jamb between garage door and screen, about 5’ high on
whichever side willing to pull from, and using wood screws.
Not Included
Hammer and Step Ladder
5/8” Roofing Nails (Optional for Step 8)
¾” plastic pipe cut to width of screen (Step 5)
Included
One roll of self-adhesive hook & loop
3 Mounting brackets
4 Eyelets
3 Cords (Each different lengths)
1 Cleat
8 Wood Screws
STEP 5
Install eye screws. All 4 eye screws should go into the header on the inside of the screen
approximately 1” away.
Eye Screw 1- Place in center of header. (Equally centered from both sides of garage opening.)
Eye Screw 2- Screw into header 12” from the end of the header furthest away from the cleat.
Eye Screw 3- Screw into header 12” from the end of the header closest to the cleat.
Eye Screw 4- Place within 6” from same side as cleat.
STEP 6
Attach brackets to the header (street side) across from eye screws 1, 2, and 3.
STEP 7
Insert the cords accordingly:
Longest Cord- Insert the knotted end into the bracket across from Eye Screw 2. Run the cord
down the screen, then back up to Eye Screw 2. Run the cord through Eye Screw 2 and the
remaining eyelets, and down to the cleat.
Mid-length Cord- Insert the knotted end into the bracket across from Eye Screw 1. Run the cord
down the screen, then back up to Eye Screw 1. Run the cord through Eye Screw 1 and the
remaining eyelets, and down to the cleat.
Shortest Cord- Insert the knotted end into the bracket across from Eye Screw 3. Run the cord
down the screen, then back up to Eye Screw 3. Run the cord through Eye Screw 3 and 4, and
down to the cleat. With the screen pulled all the way down, tie all 3 cords together about 12’’
below the cleat and cut off any excess cord.
STEP 8 (Optional/Highly Recommended)
After fastening the screen to the header and door jambs, apply roofing nails (not included)
through the straps at the top of the screen to the header to create a long term and permanent
hold.
STEP 9
Insert a ¾” rod into sewn pouch on bottom of screen to maintain position and shape when
rolled up.
STORAGE/CLEANING
Take out any nails ad separate hook & loop fastening system. Wash with mild soap and water. Allow to
thoroughly dry before storing.
*Consumer Warning: The Fresh Air Screen is not designed to be a security wall and will not prevent children, adults, or
aggressive animals from getting in or out of the garage or home.
Visit www.freshairscreens.com for Warranty Terms and Conditions.
  • Page 1 1
  • Page 2 2

Fresh Air Screens 1231-C-168-RP Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI