Toro Heat Shield Kit, Z200 Baggers Installation guide

Type
Installation guide
1
All Rights Reserved
Printed in the USA
2002 by The Toro Company
8111 Lyndale Avenue South
Bloomington, MN 55420-1196
Heat Shield Kit
200 Z Master
DFS Bagger
Part No. 106–7140
Form No. 3329–193
Installation Instructions
1. Insert the heat shield onto the (2) bagger mounting
screws (Fig. 1).
2. Using the heat shield as a template, locate and mark the
2 hole locations in bagger cross tube.
3. Remove the heat shield from mounting screws and drill
two 7/32 inch dia. holes in the bagger cross tube.
4. Install the heat shield onto mounting screws and secure
with the 2 jam nuts.
5. Secure the bottom of the shield to the cross tube with 2
self tapping screws.
3
1
2
4
5
6
Figure 1
1. Heat shield
2. Jam nut (2)
3. Self tapping screw (2)
4. Bagger mounting screws
5. Bagger cross tube 6. 7/32 inch hole to drill
  • Page 1 1

Toro Heat Shield Kit, Z200 Baggers Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI