
TIMER OPERATION
Meter Immediate Control
Meter Delayed Control
Time Clock Delayed Control
Day of the Week Control
Control Operation During Regeneration
Control Operation During Programming
Manually Initiating a Regeneration
NOTE:
NOTE:
Control Operation During A Power Failure
Pentair