iCon H600

Barco iCon H600 Owner's manual

  • Hello! I am an AI chatbot trained to assist you with the Barco iCon H600 Owner's manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
  • What to do if the Barco iCon H600 projector is locked (LED 1 and LED 3 are red)?
    How to perform the debug port download on the Barco iCon H600 projector?
    How to transfer the 'boon.JFFS2_1' file to the Barco iCon H600 projector?
    What steps to take after the debug port download on the Barco iCon H600 projector?
Barco service bulletin
Serial Number: InfoT 627
Date: 03/11/2005
Product: iCon H600
Priority code*: D
A.
”Must” modification, Barco will provide t he necessary components to per form this mo difica tion
at no charge.
B.
Improves the reliability of the product.
C.
Improves the general working conditions of the product.
D.
For information only.
1. ICON ABORTED STARTUP (LOCKED
PROJECTOR)
Problem description
The projector is locked (LED 1 a
nd LED 3 are lighting up red) : in this case first perform
the download via the debug port to unlock the projector (see procedure b elow ). Thereafter
perform the V1.12 upgrade (see InfoT 628).
The upgrade to V1.12 is r
ecommended for all iCon projectors.
1.1 Debug port download : Only in case of a locked situation (aborted
start up)
RedBoot loader
Loads the projector firmware at startup.
When to perform the
debug po rt download ?
This download via the debug port on the PMP is necessary when the projector is locked with
LED1andLED3onthelocalkeypadred.
To perform the download the HyperTerminal program is used. It can be found under Win-
dows
TM
All programs/accessories/Communications.
The connection between th e projector and the PC is done with a D ata cable with RJ12
connectors.
Barco nv Presentations
Noordlaan 5,
8520 Kuurne
www.barco.com
Page 1 of 9
Barco service bulletin
Image 1 -1
iCon debug Port location.
To connect the RJ12 connector to the RS232 port of the PC a RJ12 to SUBD9(RS232) adaptor
is used.
Description
Partnumber
Image
RJ12 to SUBD9 adaptor
Z3498421 image 1-2
Data cable (RJ12)
B5580491 image 1-3
Image 1-2 Image 1-3
InfoT:
InfoT 627
Page 2 of 9
Barco service bulletin
Image 1-4
RJ12 to SUBD9 adaptor Pin configuration
Do not perform this downloa d when it is not n ecessary (when not in a
locked situation).
How to configure HyperTerminal ?
1.Start up HyperTerminal (image 1-5)
A dialog box will be displayed
2.Choose Yes or No.
3.Choose a name (i.e. “iCon”) for the connection in the following dialog box. (image 1-6)
4.Select the u sed COM port (image 1-7)
5.Fill in the Port settings ( bits per second = 115200 ; Data bits = 8 ; Parity = None ; stop
bits=1;Flowcontrol=None)andconfirmwithOK. (image 1-8)
The H
yperTerminal editor is displayed (image 1-9)
Image 1-5
Page 3 o
f9
InfoT: InfoT 627
Barco service bulletin
Image 1-6
Image 1-7
InfoT:
InfoT 627
Page 4 of 9
Barco service bulletin
Image 1-8
Image 1-9
How to perform the downloa d ?
1.Switch on the mains switch of the projector.
In the HyperTerminal window, the following text is scrolling. (image 1-10)
2.When the text Executing boot script in 2.000 seconds is displayed press ‘Ctrl’ and
c’buttononthekeyboard.(image1-11)
The start up of the projector is now interrupted and the projector has started up the
RedBoot loader.
3.Enter following command in the HyperTerminal window : lo -r -b 0x100000 -m xmodem.
4.The Redboot loader starts sending ‘C’ characters for about 80 second. During this period
you have to start transferring the file boon.JFFS2_1 using the ‘1K Xmodem’ protocol.
Page 5 o
f9
InfoT: InfoT 627
Barco service bulletin
Image 1-10
Image 1-11
when indicated text a ppe ars press “CTRL and “C ”
How to trans fer the boon.JFFS2 _1 file (available on request) ?
1.Select Send File in the Transfer menu. (image 1-12)
The following dialog box appears. (image 1-13)
2.Use the browse button to select boon.JFF S2 _1 .
3.Select the 1K Xmodem protocol.
4.Press the Send button.
See image 1-14.
5.The transfe r will take about 5.30 min ut es.
6.After the download Redboot will respond with the following info : (image 1-15)
7.Enter the command fis create JFFS2_1
8.Redboot will ask for a confirmation : . An image named ’JFFS2_1’ e xists - continue
(y
/n)? (image 1-16)
9.Enter y and press Ente r.
This
cantakesometime(30secupto2minutes).
10.When the programming of the flash has finished, the RedBoot prompt will appear again.
(image 1-17)
InfoT:
InfoT 627
Page 6 of 9
Barco service bulletin
11.Switchoffthemainsoftheprojector.
12.Switch on the mains
All LED’s will turn on for about 2 seconds.
Then LED 1 and LED 3 will turn red for about 60 seconds.
After this period, the internal upgrade will start and LED 3 will turn orange for about 20
seconds.
After the internal upgrade, the projector will reset.
All LED’s will turn on for about 2 seconds.
Then LED 1 and LED 3 will turn red for about 60 seconds.
After this period. Only LED 1 will stay red.
13.Press the Stand by button on the remote.
Image 1-12
Image 1-13
Page 7 o
f9
InfoT: InfoT 627
Barco service bulletin
Image 1-14
Image 1-15
Image 1-16
InfoT:
InfoT 627
Page 8 of 9
Barco service bulletin
Image 1-17
Page 9 o
f9
InfoT: InfoT 627
/