Dell PowerSwitch S4248FB-ON /S4248FBL-ON Quick start guide

Type
Quick start guide

The Dell PowerSwitch S4248FB-ON /S4248FBL-ON is a high-performance switch designed for enterprise networks. With its 48 Gigabit Ethernet ports, this switch delivers exceptional connectivity for demanding applications. Advanced features like Layer 3 routing, PoE+, and flexible stacking options make it ideal for a wide range of network deployments. The S4248FB-ON /S4248FBL-ON is a powerful and reliable solution for businesses seeking a scalable and efficient network infrastructure.

The Dell PowerSwitch S4248FB-ON /S4248FBL-ON is a high-performance switch designed for enterprise networks. With its 48 Gigabit Ethernet ports, this switch delivers exceptional connectivity for demanding applications. Advanced features like Layer 3 routing, PoE+, and flexible stacking options make it ideal for a wide range of network deployments. The S4248FB-ON /S4248FBL-ON is a powerful and reliable solution for businesses seeking a scalable and efficient network infrastructure.

Dell EMC PowerSwitch S4200-ON Series
Set-up Guide
March 2021
Rev. A01
Notes, cautions, and warnings
NOTE: A NOTE indicates important information that helps you make better use of your product.
CAUTION: A CAUTION indicates either potential damage to hardware or loss of data and tells you how to avoid
the problem.
WARNING: A WARNING indicates a potential for property damage, personal injury, or death.
Copyright © 2017 Dell Inc. or its subsidiaries. All rights reserved. Dell, EMC, and other trademarks are trademarks of Dell Inc. or its
subsidiaries. Other trademarks may be trademarks of their respective owners.
Chapter 1: About this guide........................................................................................................... 4
Related documents............................................................................................................................................................. 4
Information Symbols........................................................................................................................................................... 4
Chapter 2: Site preparations......................................................................................................... 6
Site selection........................................................................................................................................................................ 6
Cabinet placement.............................................................................................................................................................. 6
Rack mounting......................................................................................................................................................................7
Switch ground...................................................................................................................................................................... 7
Fans and airflow................................................................................................................................................................... 7
Power......................................................................................................................................................................................7
Storing components............................................................................................................................................................ 7
Chapter 3: S4200-ON Series Installation....................................................................................... 8
Unpack................................................................................................................................................................................... 8
Rack or cabinet installation............................................................................................................................................... 9
ReadyRails installation........................................................................................................................................................ 9
1U Tool-less mount installation....................................................................................................................................... 10
Two-post flush-mount installation..................................................................................................................................11
Two-post center-mount installation..............................................................................................................................12
Four-post threaded installation...................................................................................................................................... 13
S4200-ON Series switch installation.............................................................................................................................14
1U front-rack installation.................................................................................................................................................. 14
Optics installation...............................................................................................................................................................16
Switch power-up................................................................................................................................................................16
After switch installation....................................................................................................................................................16
Chapter 4: Specifications.............................................................................................................17
Chassis physical design.....................................................................................................................................................17
Chapter 5: Support...................................................................................................................... 19
Contents
Contents 3
About this guide
This guide provides site preparation recommendations, step-by-step procedures for rack mounting and desk mounting, inserting
modules, and connecting to a power source.
CAUTION: To avoid electrostatic discharge (ESD) damage, wear grounding wrist straps when handling this
equipment.
NOTE: Only trained and qualified personnel can install this equipment. Read this guide before you install and power up this
equipment. This equipment contains two power cords. Disconnect both power cords before servicing.
NOTE: This equipment contains optical transceivers, which comply with the limits of Class 1 laser radiation.
Figure 1. Class 1 laser product tag
NOTE: When no cable is connected, visible and invisible laser radiation may be emitted from the aperture of the optical
transceiver ports. Avoid exposure to laser radiation and do not stare into open apertures.
Topics:
Related documents
Information Symbols
Related documents
For more information about the S4200-ON Series (S4248FB-ON and S4248FBL-ON), see the following documents.
OS10 Enterprise Edition Release Notes
OS10 Enterprise Edition User Guide
S4200-ON Series Installation Guide
Dell Open Networking Hardware Diagnostic Guide
S4200-ON Series Release Notes
NOTE: For the most recent documentation, visit the support site: www.dell.com/support.
Information Symbols
This book uses the following information symbols:
NOTE: The Note icon signals important operational information.
CAUTION: The Caution icon signals information about situations that could result in equipment damage or loss
of data.
NOTE: The Warning icon signals information about hardware handling that could result in injury.
1
4 About this guide
NOTE: The ESD Warning icon requires that you take electrostatic precautions when handling the device.
About this guide 5
Site preparations
The S4200-ON Series (S4248FB-ON and S4248FBL-ON) is suitable for installation as part of a common bond network (CBN).
You can install the switch in:
Network telecommunication facilities
Data centers
Other locations where the National Electric Code (NEC) applies
For more information about the S4200-ON Series specifications, see Specifications.
NOTE: Install the switch into a rack or cabinet before installing any optional components.
Topics:
Site selection
Cabinet placement
Rack mounting
Switch ground
Fans and airflow
Power
Storing components
Site selection
Install your equipment in restricted access areas. A restricted access area is one where service personnel can only gain access
using a special tool, lock, key, or other means of security. The authority responsible for the location controls access to the
restricted area.
Ensure that the area where you install your switch meets the following safety requirements:
Near an adequate power source. Connect the switch to the appropriate branch circuit protection according to your local
electrical codes.
Environmentalswitch locationcontinuous temperature range is from 0°C to 45°C (32°F to 113°F).
Operating humidity is from 5 to 85 percent noncondensing, continuous.
In a dry, clean, well-ventilated, and temperature-controlled room, away from heat sources such as hot cooling vents or direct
sunlight.
Away from sources of severe electromagnetic noise.
Positioned in a rack or cabinet, or on a desktop with adequate space in the front, back, and sides for proper ventilation and
access.
Install the switch in Information Technology Rooms in accordance with Article 645 of the National Electrical Code and NFPA
75.
For more information about switch storage and environmental temperatures, see Specifications.
Cabinet placement
Install the S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch only in indoor cabinets designed for use in a controlled
environment.
Do not install the switch in outside cabinets. For cabinet placement requirements, see Site selection.
The cabinet must meet minimum size requirements. Airflow must be in accordance with the Electronic Industries Alliance (EIA)
standard. Ensure that there is a minimum of 5 inches (12.7 cm) between the intake and exhaust vents and the cabinet wall.
2
6 Site preparations
Rack mounting
When you prepare your equipment rack, ensure that the rack is grounded. Ground the equipment rack to the same ground point
the power service in your area uses. The ground path must be permanent.
Switch ground
Dell EMC recommends grounding your switch. Use the S4200-ON Series switch in a CBN.
Fans and airflow
Fan installation is done as part of the factory install based on stock keeping unit (SKU) type. The S4200-ON Series has SKUs
that support the following configurations:
AC PSU with fan airflow from the I/O to the PSUnormal
AC PSU with fan airflow from the PSU to the I/Oreverse
DC fan unit with airflow from the I/O to the PSUnormal
DC fan unit with fan airflow from the PSU to the I/Oreverse
Be sure to order the fans suitable to support your sites ventilation. Use a single type of airflow fan in your switch. Do not mix
reverse and normal airflows in a single switch.
For proper ventilation, position the switch in an equipment rack or cabinet with a minimum of 5 inches (12.7 cm) of clearance
around the exhaust vents. The fan speed varies based on internal temperature monitoring. The switch never intentionally turns
off the fans.
Power
To connect the switch to the applicable power source, use the appropriate power cable. An AC power cable is included with the
switch.
When installing AC or DC switches, follow the requirements of the National Electrical Code ANSI/NFPA 70, where applicable.
The switch is powered-up when the power cable is connected between the switch and the power source.
CAUTION:
Always disconnect the power cable before you service the power supply slots. The switch has
multiple power cords. Before servicing, ensure all power cords are disconnected.
CAUTION: On the AC switch, use the power supply cable as the main disconnect device. Ensure that the
socket-outlet is located/installed near the equipment and is easily accessible.
NOTE: Module power is software controlled. You do not see module LEDs when the switch powers up in ONIE.
Storing components
If you do not install your S4200-ON Series switch and components immediately, properly store the switch and all optional
components following these guidelines:
Storage location temperature must remain constant. The storage range is from -40°C to 70°C (-40°F to 158°F).
Store on a dry surface or floor, away from direct sunlight, heat, and air conditioning ducts.
Store in a dust-free environment.
NOTE:
ESD damage can occur when components are mishandled. Always wear an ESD-preventive wrist or heel ground
strap when handling the switch and its accessories. After you remove the original packaging, place the S4200-ON Series
switch and its components on an anti-static surface.
Site preparations 7
S4200-ON Series Installation
To install the S4200-ON Series (S4248FB-ON and S4248FBL-ON), complete the installation procedures in the order presented
in this section.
Always handle the switch and its components with care. Avoid dropping the switch or any field replaceable units (FRUs).
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the switch and its components. As with all electrical devices of this type, take all the necessary safety
precautions to prevent injury when installing this switch.
Topics:
Unpack
Rack or cabinet installation
ReadyRails installation
1U Tool-less mount installation
Two-post flush-mount installation
Two-post center-mount installation
Four-post threaded installation
S4200-ON Series switch installation
1U front-rack installation
Optics installation
Switch power-up
After switch installation
Unpack
NOTE: Before unpacking the switch, inspect the container and immediately report any evidence of damage.
When unpacking the S4200-ON Series switch, make sure that the following items are included:
One S4200-ON Series (S4248FB-ON or S4248FBL-ON) switch
One RJ-45 to DB-9 female cable
Two sets of rail kits, no tools required
Two PSUs
Five fan units
Two country- and region-specific AC power cords
S4200-ON Series Set-up Guide
Safety and Regulatory Information
Warranty and Support Information
1. Place the container on a clean, flat surface and cut all straps securing the container.
2. Open the container or remove the container top.
3. Carefully remove the switch from the container and place it on a secure and clean surface.
4. Remove all packing material.
5. Inspect the product and accessories for damage.
3
8 S4200-ON Series Installation
Rack or cabinet installation
You may either place the switch on a rack shelf or mount the switch directly into a 19" wide, EIA-310- E-compliant rack.
Rack mounting includes four-post, two-post, round threaded holes, or square holes. The ReadyRails system is provided for 1U
front-rack and two-post installations.
The ReadyRails system includes two separately packaged rail assemblies. To begin installation, separate each rail assembly by
sliding the inside rail out of the outside rail.
WARNING: This guide is a condensed reference. Read the safety instructions in your
Safety, Environmental, and
Regulatory
information booklet before you begin.
NOTE: The illustrations in this section are not intended to represent a specific switch.
NOTE: Do not the use the mounted ReadyRails as a shelf or a workplace.
Rack mount safety considerations
Rack loadingOverloading or uneven loading of racks may result in shelf or rack failure, possibly damaging the equipment
and causing personal injury. Stabilize racks in a permanent location before loading begins. Mount the components starting at
the bottom of the rack, then work to the top. Do not exceed your racks load rating.
Power considerationsConnect only to the power source specified on the unit. When you install multiple electrical
components in a rack, ensure that the total component power ratings do not exceed the circuit capabilities. Overloaded
power sources and extension cords present fire and shock hazards.
Elevated ambient temperatureIf you install the switch in a closed rack assembly, the operating temperature of the rack
environment may be greater than the room ambient temperature. Use care not to exceed the 45°C maximum ambient
temperature of the switch.
Reduced air flowDo not compromise the amount of airflow required for safe operation of the equipment. Install the
equipment in the rack so that the equipment constantly has the correct amount of airflow surrounding it.
Reliable earthingMaintain reliable earthing of rack-mounted equipment. Pay particular attention to the supply connections
other than the direct connections to the branch circuit, for example: use of power strips.
Do not mount the equipment with the fan panel facing in the downward position.
ReadyRails installation
To easily configure your rack for switch installation, use the ReadyRails rack mounting system provided.
You can install the ReadyRails system using the 1U tool-less square-hole method or one of three possible 1U threaded round-hole
methods. The tooled installation methods include two-post flush mount, two-post center mount, or four-post threaded mount.
To begin installation, separate each rail assembly by sliding the inside rail out of the outside rail.
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
S4200-ON Series Installation 9
Figure 2. Separate rails
1U Tool-less mount installation
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
1. Face the ReadyRails flange ears facing outward. Place one rail between the left and right vertical posts. Align and seat the
back flange rail pegs in the back vertical post flange.
The center extractions show how the pegs appear in both the square and nonthreaded round holes.
10
S4200-ON Series Installation
Figure 3. 1U tool-less installation
2. Align and seat the front flange pegs in the holes on the front side of the vertical post.
NOTE: Be sure that the rails click into place and are secure.
3. Repeat this procedure for the second rail.
4. To remove each rail, pull on the latch release button on each flange ear and unseat each rail.
Two-post flush-mount installation
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
1. For this configuration, remove the latch castings from the front side of each ReadyRails assembly, item 1.
To remove the two screws from each front flange ear on the switch side of the rail and remove each latch casting, use
a Torx screwdriver. Retain the latch castings for future rack requirements. It is not necessary to remove the back flange
castings.
S4200-ON Series Installation
11
Figure 4. Two-post flush-mount installation
2. Attach one rail to the front post flange with two user-supplied screws, item 2.
3. Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post flange with two
user-supplied screws, item 3.
4. Repeat this procedure for the second rail.
Two-post center-mount installation
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
1. Slide the plunger bracket rearward until it clicks into place and secure the bracket to the front post flange with two
user-supplied screws, item 1.
12
S4200-ON Series Installation
Figure 5. Two-post center-mount installation
2. Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3.
3. Repeat this procedure for the second rail.
Four-post threaded installation
NOTE: For more installation instructions, see the installation labels attached to the rail assembly.
1. Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a
Torx driver.
Retain the latch castings for future rack requirements.
S4200-ON Series Installation
13
Figure 6. Four-post threaded installation
2. For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at each end.
S4200-ON Series switch installation
For the 1U two-post configurations, slide the switch into the rails in the same manner as the four-post configurations.
1U front-rack installation
Configure the rails that are attached to the switch.
1.
NOTE: For more information, see the installation instruction labels on the rail.
Attach the inner switch rails to the S4200-ON Series switch.
Line up the rail with the mounting heads and attach the rail to the chassis. Slide the rail back until it locks into place. The
following shows the detail of the front standoff with the locking tab:
14
S4200-ON Series Installation
Figure 7. Switch rail attachment
2. After you install both rails, line them up on the ReadyRails. Slide the switch in until it is flush with the front of rack.
About three inches before you fully insert your switch, the rail locking feature engages to keep the switch from inadvertently
sliding out and falling.
Figure 8. Front rack installation
S4200-ON Series Installation
15
NOTE: Do not the use the mounted Ready-Rails as a shelf or a workplace.
3. Tighten the two thumb screws and rack screws.
To remove the chassis from the rack or cabinet, press in the two side-release bars on the chassis at the same time and slide the
chassis forward.
Optics installation
WARNING: When working with optical fibers, follow all warning labels and always wear eye protection. Never
look directly into the end of a terminated or unterminated fiber or connector as it may cause eye damage.
1. Position the optic so it is in the correct position.
The optic has a key that prevents it from being inserted incorrectly.
2. Insert the optic into the port until it gently snaps into place.
NOTE: When you cable the ports, be sure not to interfere with the airflow from the small vent holes above and below
the ports.
Switch power-up
Supply power to the S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch after you mount it in a rack or cabinet.
Reinspect your switch before power up. Verify the following:
The equipment is properly secured to the rack. Dell EMC recommends properly grounding the switch.
The ambient temperature around the unit, which may be higher than the room temperature, is within the limits specified for
the S4200-ON Series, see Specifications.
There is sufficient airflow around the unit.
The input circuits are correctly sized for the loads and that you use sufficient overcurrent protection devices.
All protective covers are in place.
Blank panels are installed if you do not install optional modules.
CAUTION: Do not power up the switch if you did not install a fan module.
NOTE: A US AC power cable is included for powering up an AC power supply. You must order all other power cables
separately.
NOTE: ESD damage can occur if components are mishandled. Always wear an ESD-preventive wrist or heel ground strap
when handling the switch and its components.
Power up sequence
When the switch powers up, the fans immediately come on at high speed. The fan speed slows as the switch continues to boot
up.
After switch installation
To configure your switch, after you have securely installed and powered on the S4200-ON Series (S4248FB-ON and
S4248FBL-ON) switch, see your open network installation environment (ONIE)-compatible operating system documentation
at www.onie.org. For more information about working with the ONIE environment, see your switch documentation at
www.dell.com/support.
16
S4200-ON Series Installation
Specifications
This section lists the S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch specifications.
CAUTION: Operate the product at an ambient temperature not higher than 113°F45°C.
CAUTION: Lithium Battery Caution: There is a danger of explosion if the battery is incorrectly replaced.
Replace only with same or equivalent type of battery. Dispose of the batteries according to the manufacturer's
instructions.
NOTE: For RoHS information, see Restricted Material Compliance.
Topics:
Chassis physical design
Chassis physical design
Table 1. Chassis physical design
Parameter Specifications
Height 1.72 inches (44 mm)
Width 17.1 inches (434 mm)
Depth
18.2 inches (462 mm)
PSU/fan tray handle: 1.57 inches (40 mm)
Chassis weight with factory-installed components
22 lbs (2* PSUs)
9.98 kg (2* PSUs)
Rack clearance required
Front: 5 inches (12.7 cm)
Back: 5 inches (12.7 cm)
Table 2. Environmental parameters
Parameter Specifications
Operating temperature 0°C to 45°C (32°F to 113°F) continuously
-5°C to 45°C (23°F to 113°F) short term
Short term is </= 1% of operational hours per year.
NOTE: Reduce maximum temperature by 1°C/125 meters
(1°F/228 feet) above 950 meters (3,117 feet).
Operating humidity 5% to 85% (RH), non-condensing, continuously
5% to 90% (RH), non-condensing, short term
Short term is </= 1% of operational hours per year.
Storage temperature 40° to 70°C (40° to 158°F )
Storage humidity 5% to 95%, non-condensing
4
Specifications 17
Table 2. Environmental parameters (continued)
Parameter Specifications
Maximum thermal output 600 W = 2047 BTU/Hr
Maximum operational altitude 10,000 feet (3,048 meters)
Maximum non-operational altitude 39,370 feet (12,000 meters)
Shock Dell EMC Spec SV0115
Table 3. AC power requirements
Parameter Specifications
Power supply 100240 VAC 50/60 Hz
Maximum current draw per system 6A/5A at 100/120V AC 3A/2.5A at 200/240V AC
Maximum power consumption 600 Watts
Typical power consumption 300 Watts
Table 4. DC power requirements
Parameter Specifications
Minimum and maximum input voltage range 40.5, 60V DC, 15A Max
Maximum power consumption 600 Watts
Start up VDC 39.0 ± 1.5 V
Start off VDC 37.5 ±1.5 V
18 Specifications
Support
The support site provides documents and tools to help you effectively use your equipment and mitigate network outages.
Through the support site you can obtain technical information, access software upgrades and patches, download available
management software, and manage your open cases. The support site provides integrated, secure access to these services.
To access the support site, go to www.dell.com/support/. To display information in your language, scroll down to the bottom of
the web page and select your country from the drop-down menu.
To obtain product-specific information, enter the 7-character service tag, known as a luggage tag, or 11-digit express service
code of your switch and click Submit.
To view the chassis service tag or express service code, pull out the tag or enter the show chassis command from the
CLI.
To receive more technical support, click Contact Us. On the Contact Information web page, click Technical Support.
To access switch documentation, go to www.dell.com/manuals/.
To search for drivers and downloads, go to www.dell.com/drivers/.
To participate in community blogs and forums, go to www.dell.com/community.
5
Support 19
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19

Dell PowerSwitch S4248FB-ON /S4248FBL-ON Quick start guide

Type
Quick start guide

The Dell PowerSwitch S4248FB-ON /S4248FBL-ON is a high-performance switch designed for enterprise networks. With its 48 Gigabit Ethernet ports, this switch delivers exceptional connectivity for demanding applications. Advanced features like Layer 3 routing, PoE+, and flexible stacking options make it ideal for a wide range of network deployments. The S4248FB-ON /S4248FBL-ON is a powerful and reliable solution for businesses seeking a scalable and efficient network infrastructure.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI