Perky-Pet 340 Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Perky-Pet 340 Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
See our full line of Perky-Pet
®
birdfeeders and accessories at www.perkypet.com
855-757-5973 | Woodstream Corporation | 69 N. Locust Street Lititz, PA 17543, USA
Transparent Squirrel Bae
Model #340
For Hanging Feeders
1. Insert and screw hanging hook together through Center
Guide in Bae Hub. (See illustration to the right.)
2. Place Bae over the Bae Hub as illustrated.
3. Hang feeder approximately 8 to 10 inches from bottom of
hook to the feeder top. Allow the Bae enough room to tilt
past the outer edge of the feeder.
For Pole Mounted Feeders
1. Important! Punch out Center Guide by placing hub (see
illustration to the right) on a firm surface. Then by using a
screw driver or other blunt instrument, break out the Center
Guide.
2. Insert and start the three Locking Screws per illustration.
Slide Bae Hub onto pole at an approximate height and
tighten the Locking Screws to temporarily hold the hub in
place.
3. Lower Bae into place over Hub.
4. Set feeder onto pole. Loosen Screws and slide Bae
Assembly into position per illustration below.
Tighten Locking Screws securely.
Bae Hub
Hanging
Hook
Center
Guide
Bae
Leave approximately
8” to 10” hanging
lenth between hook
bottom and feeder
top.
Pole size: 3/4” to 1/4”
outside diameter
Punch out
disc from this
direction
Locking
Screws
Bae Hub
Bae
/