Howdens SDH3636 Operating instructions

Type
Operating instructions
HOWDENS
ENGINEERED
FLOORING
Sealed packs must be stored for at least 48 hours
where they are to be laid.
Packs should be stored in a room with a minimum
temperature of 18°C
Do not open packs until you are ready
to install the flooring
Follow the fitting instructions on the reverse
of this sheet
Relative air humidity: 45-60%
Important information
48
hrs
18 C
BARLINEK INWESTYCJE
ul. Przemysłowa 1, 74-320 BARLINEK
09
Three-layer flooring board
Fire reaction: D
– S
1
Average minimal density 550 kg/m
3
Total thickness: 14 mm
Formaldehyde emission: E – 1
Pentachlorophenol emission ≤5 ppm
lacquered USRV 105
Slip oiled USRV 100
resistance: brushed and lacquered USRV 110
brushed and oiled USRV 106
structural lacquer USRV 99
Thermal conductivity 0,14W/m*K
Biological durability: NPD
IMPORTANT ENGINEERED FLOORING FITTING NOTICE
Flooring MUST be allowed to acclimatise Flooring MUST be allowed to acclimatise
MUST LEAVE 15MM EXPANSION GAP
- Around the entire floor including cabinet legs, radiator pipes and
door frames
- Do not install cabinets over the floor
SUB-FLOOR MUST BE CLEAN, DRY, FLAT AND LEVEL
- Timber based sub floors must be securely fixed before laying
- Always use a moisture barrier paper on timber based sub floors
MUST USE HOWDENS FOAM OR XPS UNDERLAY
ALWAYS USE A DPM ON CONCRETE FLOORS
- And any other mineral based subfloor
HOWDENS
ENGINEERED
FLOORING
Sealed packs must be stored for at least 48 hours
where they are to be laid.
Packs should be stored in a room with a minimum
temperature of 18°C
Do not open packs until you are ready
to install the flooring
Follow the fitting instructions on the reverse
of this sheet
Relative air humidity: 45-60%
Important information
48
hrs
18 C
BARLINEK INWESTYCJE
ul. Przemysłowa 1, 74-320 BARLINEK
09
Three-layer flooring board
Fire reaction: D
– S
1
Average minimal density 550 kg/m
3
Total thickness: 14 mm
Formaldehyde emission: E – 1
Pentachlorophenol emission ≤5 ppm
lacquered USRV 105
Slip oiled USRV 100
resistance: brushed and lacquered USRV 110
brushed and oiled USRV 106
structural lacquer USRV 99
Thermal conductivity 0,14W/m*K
Biological durability: NPD
IMPORTANT ENGINEERED FLOORING FITTING NOTICE
Flooring MUST be allowed to acclimatise Flooring MUST be allowed to acclimatise
MUST LEAVE 15MM EXPANSION GAP
- Around the entire floor including cabinet legs, radiator pipes and
door frames
- Do not install cabinets over the floor
SUB-FLOOR MUST BE CLEAN, DRY, FLAT AND LEVEL
- Timber based sub floors must be securely fixed before laying
- Always use a moisture barrier paper on timber based sub floors
MUST USE HOWDENS FOAM OR XPS UNDERLAY
ALWAYS USE A DPM ON CONCRETE FLOORS
- And any other mineral based subfloor
HOWDENS
ENGINEERED
FLOORING
Sealed packs must be stored for at least 48 hours
where they are to be laid.
Packs should be stored in a room with a minimum
temperature of 18°C
Do not open packs until you are ready
to install the flooring
Follow the fitting instructions on the reverse
of this sheet
Relative air humidity: 45-60%
Important information
48
hrs
18 C
BARLINEK INWESTYCJE
ul. Przemysłowa 1, 74-320 BARLINEK
09
Three-layer flooring board
Fire reaction: D
– S
1
Average minimal density 550 kg/m
3
Total thickness: 14 mm
Formaldehyde emission: E – 1
Pentachlorophenol emission ≤5 ppm
lacquered USRV 105
Slip oiled USRV 100
resistance: brushed and lacquered USRV 110
brushed and oiled USRV 106
structural lacquer USRV 99
Thermal conductivity 0,14W/m*K
Biological durability: NPD
IMPORTANT ENGINEERED FLOORING FITTING NOTICE
Flooring MUST be allowed to acclimatise Flooring MUST be allowed to acclimatise
MUST LEAVE 15MM EXPANSION GAP
- Around the entire floor including cabinet legs, radiator pipes and
door frames
- Do not install cabinets over the floor
SUB-FLOOR MUST BE CLEAN, DRY, FLAT AND LEVEL
- Timber based sub floors must be securely fixed before laying
- Always use a moisture barrier paper on timber based sub floors
MUST USE HOWDENS FOAM OR XPS UNDERLAY
ALWAYS USE A DPM ON CONCRETE FLOORS
- And any other mineral based subfloor
HOWDENS
ENGINEERED
FLOORING
Sealed packs must be stored for at least 48 hours
where they are to be laid.
Packs should be stored in a room with a minimum
temperature of 18°C
Do not open packs until you are ready
to install the flooring
Follow the fitting instructions on the reverse
of this sheet
Relative air humidity: 45-60%
Important information
48
hrs
18 C
BARLINEK INWESTYCJE
ul. Przemysłowa 1, 74-320 BARLINEK
09
Three-layer flooring board
Fire reaction: D
– S
1
Average minimal density 550 kg/m
3
Total thickness: 14 mm
Formaldehyde emission: E – 1
Pentachlorophenol emission ≤5 ppm
lacquered USRV 105
Slip oiled USRV 100
resistance: brushed and lacquered USRV 110
brushed and oiled USRV 106
structural lacquer USRV 99
Thermal conductivity 0,14W/m*K
Biological durability: NPD
IMPORTANT ENGINEERED FLOORING FITTING NOTICE
Flooring MUST be allowed to acclimatise Flooring MUST be allowed to acclimatise
MUST LEAVE 15MM EXPANSION GAP
- Around the entire floor including cabinet legs, radiator pipes and
door frames
- Do not install cabinets over the floor
SUB-FLOOR MUST BE CLEAN, DRY, FLAT AND LEVEL
- Timber based sub floors must be securely fixed before laying
- Always use a moisture barrier paper on timber based sub floors
MUST USE HOWDENS FOAM OR XPS UNDERLAY
ALWAYS USE A DPM ON CONCRETE FLOORS
- And any other mineral based subfloor
HOWDENS
ENGINEERED
FLOORING
Sealed packs must be stored for at least 48 hours
where they are to be laid.
Packs should be stored in a room with a minimum
temperature of 18°C
Do not open packs until you are ready
to install the flooring
Follow the fitting instructions on the reverse
of this sheet
Relative air humidity: 45-60%
Important information
48
hrs
18 C
BARLINEK INWESTYCJE
ul. Przemysłowa 1, 74-320 BARLINEK
09
Three-layer flooring board
Fire reaction: D
– S
1
Average minimal density 550 kg/m
3
Total thickness: 14 mm
Formaldehyde emission: E – 1
Pentachlorophenol emission ≤5 ppm
lacquered USRV 105
Slip oiled USRV 100
resistance: brushed and lacquered USRV 110
brushed and oiled USRV 106
structural lacquer USRV 99
Thermal conductivity 0,14W/m*K
Biological durability: NPD
IMPORTANT ENGINEERED FLOORING FITTING NOTICE
Flooring MUST be allowed to acclimatise Flooring MUST be allowed to acclimatise
MUST LEAVE 15MM EXPANSION GAP
- Around the entire floor including cabinet legs, radiator pipes and
door frames
- Do not install cabinets over the floor
SUB-FLOOR MUST BE CLEAN, DRY, FLAT AND LEVEL
- Timber based sub floors must be securely fixed before laying
- Always use a moisture barrier paper on timber based sub floors
MUST USE HOWDENS FOAM OR XPS UNDERLAY
ALWAYS USE A DPM ON CONCRETE FLOORS
- And any other mineral based subfloor
HOWDENS
ENGINEERED
FLOORING
Sealed packs must be stored for at least 48 hours
where they are to be laid.
Packs should be stored in a room with a minimum
temperature of 18°C
Do not open packs until you are ready
to install the flooring
Follow the fitting instructions on the reverse
of this sheet
Relative air humidity: 45-60%
Important information
48
hrs
18 C
BARLINEK INWESTYCJE
ul. Przemysłowa 1, 74-320 BARLINEK
09
Three-layer flooring board
Fire reaction: D
– S
1
Average minimal density 550 kg/m
3
Total thickness: 14 mm
Formaldehyde emission: E – 1
Pentachlorophenol emission ≤5 ppm
lacquered USRV 105
Slip oiled USRV 100
resistance: brushed and lacquered USRV 110
brushed and oiled USRV 106
structural lacquer USRV 99
Thermal conductivity 0,14W/m*K
Biological durability: NPD
IMPORTANT ENGINEERED FLOORING FITTING NOTICE
Flooring MUST be allowed to acclimatise Flooring MUST be allowed to acclimatise
MUST LEAVE 15MM EXPANSION GAP
- Around the entire floor including cabinet legs, radiator pipes and
door frames
- Do not install cabinets over the floor
SUB-FLOOR MUST BE CLEAN, DRY, FLAT AND LEVEL
- Timber based sub floors must be securely fixed before laying
- Always use a moisture barrier paper on timber based sub floors
MUST USE HOWDENS FOAM OR XPS UNDERLAY
ALWAYS USE A DPM ON CONCRETE FLOORS
- And any other mineral based subfloor
HOWDENS
ENGINEERED
FLOORING
Sealed packs must be stored for at least 48 hours
where they are to be laid.
Packs should be stored in a room with a minimum
temperature of 18°C
Do not open packs until you are ready
to install the ooring
Follow the tting instructions on the reverse
of this sheet
Relative air humidity: 45-60%
Important information
48
hrs
18 C
Howden Joinery Group Plc
40 Portman Square, London W1H 6LT
13
DoP: HJ-004-JC
EN 14342:2005+A1:2008
Wood ooring for internal
non structural use
Reaction to re: D
– S
1
Minimum mean density: 550 kg/m
3
Minimum overall thickness: 10 mm
Content of Pentachlorophenol: ≤5 ppm
Emission of Formaldehyde Class E1
Slipperiness USRV 100
Thermal conductivity: 0,14 W/mK
Durability (Biological): NPD
HOWDENS
ENGINEERED
FLOORING
Sealed packs must be stored for at least 48 hours
where they are to be laid.
Packs should be stored in a room with a minimum
temperature of 18°C
Do not open packs until you are ready
to install the flooring
Follow the fitting instructions on the reverse
of this sheet
Relative air humidity: 45-60%
Important information
48
hrs
18 C
BARLINEK INWESTYCJE
ul. Przemysłowa 1, 74-320 BARLINEK
09
Three-layer flooring board
Fire reaction: D
– S
1
Average minimal density 550 kg/m
3
Total thickness: 14 mm
Formaldehyde emission: E – 1
Pentachlorophenol emission ≤5 ppm
lacquered USRV 105
Slip oiled USRV 100
resistance: brushed and lacquered USRV 110
brushed and oiled USRV 106
structural lacquer USRV 99
Thermal conductivity 0,14W/m*K
Biological durability: NPD
IMPORTANT ENGINEERED FLOORING FITTING NOTICE
Flooring MUST be allowed to acclimatise Flooring MUST be allowed to acclimatise
MUST LEAVE 15MM EXPANSION GAP
- Around the entire floor including cabinet legs, radiator pipes and
door frames
- Do not install cabinets over the floor
SUB-FLOOR MUST BE CLEAN, DRY, FLAT AND LEVEL
- Timber based sub floors must be securely fixed before laying
- Always use a moisture barrier paper on timber based sub floors
MUST USE HOWDENS FOAM OR XPS UNDERLAY
ALWAYS USE A DPM ON CONCRETE FLOORS
- And any other mineral based subfloor
HOWDENS ENGINEERED FLOORING
INSTALLATION:
GLUELESS LOCKING SYSTEM
1 2 3 4
9
13
17
6
10
14
18
7
11
15
19
8
12
16
20
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
A1. A2. A3. A4.
1.
3.
2
.
EN 14342
ENGINEERED WOOD FLOORING
INSTALLATION:
GLUELESS LOCKING SYSTEM
Natura engineered flooring can be installed on any dry, clean, solid and even surface. Additionally, the humidity of the subfloor must be no more than
2% for a concrete surface, 8% for wooden , and 0.5% for an anhydrite surface. Packages should be stored horizontally in the environmentthey are to be
installed for a minimum of 48 hours without opening the packaging. The evenness of the surface is measured with a min. 2 m measuring rod or
a spirit level. The level difference should not exceed 2mm over 2 meters of the subfloor. If the difference is greater, it is vital that it should first be evened
out. The room should be well-ventilated and the packaging should only be opened on the day of installation. Prior to installation, the floorboards should
be inspected and the pattern decided on. These instructions should be read carefully.
1. The following tools are needed to install an engineered floor:
a hammer (1000 g), an assembly jig, wooden rule or measuring tape, fine-tooth manual saw or an electric sawing machine,
wooden wedges, a push block for final positioning of floorboards.
2. Use only the recommended underlay.
The direction in which the floorboards are to be installed is determined by the dimensions of the room. If none of the sides
exceeds 8m, it is recommended that the floorboards be installed along the direction of the light source or largest window. In the
case of dimensions bigger than 8m, or long but narrow rooms such as corridors, the floor should always be installed parallel to
the longest side of the room. Having established the direction, the width of the room should be measured. This value should then
be decreased by the width of the expansion gaps (usually 2 x 10 mm) and divided by 207 mm, that is, by the width of a single
floorboard. In this way, the number of rows of floorboards to be installed can be calculated, and the dimensions of cutting the last
row can be determined; if it is narrower than 70mm, the first row of floorboards must be trimmed correspondingly.
NOTE: If humidity of a concrete subfloor exceeds 2-3%, damp insulation in the form of 0.2 mm polyethylene film is
recommended in order to protect the floor covering against the damp penetrating from below. It should be installed
with an overlap of 200 mm, the joints being protected with adhesive tape.
3. Installation of the floor should begin with the underlay. You should butt the edges of the underlay (never overlapping), with
the exception of softboard underlay which should be installed with a gap of 2mm between the boards, and 10mm between the
boards and the wall (Photo 2).
4. The first row of boards should be installed tongue facing the wall. Individual floorboards should be joined along the shorter
sides (headers) by sliding parallel to the locking joint of the following boards (Photo 3). Another method is the frontal joining of
boards by means of a hammer and a push block for the final positioning (Photo 4). The last board should be trimmed to maintain
an expansion gap into which wooden wedges should be inserted.
5. The following row of boards should commence with the cut off section of the board remaining from the first row, provided
that its length exceeds 50 cm. It is also important to maintain a minimum of 50 cm between the ends of boards in the adjacent
rows (staggered). The new row should be inserted tongue in groove and pressed manually towards the previous row (Photo 5,
Fig. 1). The board should be tapped lightly with a wooden block into the previously installed row (Photo 6). The following board
should be installed in the same manner, maintaining a distance of 5 to 8 mm between the fronts of the boards (Photo 7). The
board should be indirectly tapped using a hammer and push block, thereby joining the boards’ headers (Fig.2).
6. Each subsequent row of boards installed should be pushed from the front-side of the board in order to eliminate gaps in
the header joints) (Photo 8). Wedges should be inserted into the gaps along the walls.
NOTE: No belts or straps should be used in the installation of the floor. In the case of having to overcome an obstacle,
such as central heating pipes, a fragment of the board needing additional manoeuvring ought to be marked appropri-
ately, cut and fixed (Fig. 3), all the time remembering to maintain the 10 mm expansion gap around the element to be
avoided (such as the central heating pipes). The resulting gap between the pipes and the floor can be covered up with
a rosette.
7. The last row of boards should be very carefully measured prior to installation (Photo 9). If they are too wide, the boards should
be carefully cut accordingly. The joint of the last row boards should be cut off to leave a flat edge.
8. Upon completing the installation, the wedges should be removed and the remaining gap should be covered with skirting
boards, which should always be fastened to the wall (never to the floor).
9. IImmediately after installing the skirting, the new floor is ready for use.
NOTES: During installation it should be remembered that the maximum floor area without additional expansion joints
is 8m of the board’s width and 20m of its length. The floor should be used in the following conditions:
air temperature: 18-24°C
relative air humidity: 45-60%.
Damage to the floor caused by incorrect installation or damp do not constitute a defective product. Acoustic effects
connected with using the floor covering are a natural feature of wooden floors and, again do not constitute any faults.
Nor does the variation in colour and change of hue (darkening), which is the result of exposure to the sun rays and is a
natural feature of wood. The floor must not be installed in unheated, damp rooms (bathrooms, saunas, laundries, etc.)
or outdoors. Wooden floorboards must be checked both before and during installation with regard to possible defects.
Installation of a floor with faulty boards will invalidate warranty claims. Floorboards which are found to have defects
prior to installation are subject to warranty claims. Please note that the boards may have natural wood losses, minor
scratches, dents, filled-in cracks and the effects of the varnish treatment, which are not necessarily considered defec-
tive. Any defects should be reported immediately before continuing with the installation.
MAINTENANCE AND CARE OF FLOOR COVERINGS
In order to provide additional protection to the installed flooring, it is permissible to apply additional layers of varnish or oil. (Sub-
ject to the existing finish – do not apply oil over varnish for example).
After installation of a varnished floor, and during its subsequent use, it is recommended to apply proper cleaning and mainte-
nance agents, following the attached instructions. The floor covering is easy to clean; this can be done with a vacuum cleaner
with a special end for wooden floors or with a brush. Spilt water and other contaminations should be removed immediately.
The worst enemies of wooden floors are water and sand; in order to protect a floor against them, it is recommended to place
protective mats at the entrance to the property. Pedestals, and other areas of furniture pressure, should be protected by gluing
felt pads underneath them (not to be fastened with nails). When using office furniture, e.g. chairs on casters, it is recommended
to position roll-stop protective mats. If the relative air humidity in the room drops below 40% (e.g. in the heating season), air
humidifiers should be used.
RENOVATION OF VARNISHED FLOORS
When varnishing for renovation and regeneration purposes, polyurethane varnish is recommended. Ensure you follow the manu-
facturer’s guidelines for the application. Slightly worn surface areas can be varnished if there are no clear gaps in the original
varnish applied by the manufacturer. A test-varnishing should be performed on a spare piece of floorboard remaining after
installation.
Then proceed as follows:
1. Area should be degreased and any previously applied maintenance agents should be removed thoroughly.
2. The entire surface should be carefully matted lengthways with fine sand paper (granulation 180-250), to enhance the adhesion
between the old and the new coats of varnish. Failure to do so can result in the occurrence of visible scratches. Next, the sanded
floor should be dusted. Before applying the new layer, an adhesion test should be performed on a less conspicuous patch of the
floor.
3. The varnishing can then commence – the new layer should be applied following the instructions on the varnish label.
NOTE: Renovation work should be carried out by a professional contractor.
REGENERATION OF VARNISHED SURFACES
After years of use, or when heavily used, a varnished floor surface can become worn and the wood damaged. In such cases
the varnished surface can be refreshed by applying a new layer of varnish, observing the recommended guidelines and using
polyurethane varnish.
Surface preparation:
1. Remove any maintenance agents from the surface in the appropriate manner (following the manufacturer’s recommenda-
tions).
2. When dry, the floor should be tarnished with a disk sander to remove the existing layer of varnish and then dusted.
Varnishing:
Polyurethane varnish is recommended to be used following the manufacturer’s instructions after a prior test.
NOTE: Normal usage of the floor can resume after approximately 7 days. When applying the varnish, tools designed for
polyurethane products should be used. The renovation should be performed by a professional contractor. The thickness
of the veneer guarantees the performing of floor renovation a minimum of three times. In the case of substantial dam-
age to a specific part of the floor, one or more floorboards can be replaced.
INSTALLATION OVER UNDERFLOOR HEATING
1. Set the heating at 18°C on the surface of the floor for 2 weeks minimum prior to installation.
2. The flooring should be installed at the same temperature, following the standard instructions for floatinginstallation.
3. The recommended unit power is 100 W/m
2
.
CAUTION: A precondition for laying the floor on the underfloor heating system is to perform a preheating for a period of 30 days while gradually increasing
the temperature from the lowest values to the maximum ones allowed by the heating system.
If the installation is not to be carried out at once, but is scheduled to be done later, the heating system must be set to 18°C (measured on the floor surface) 2 weeks
before the installation and the floor must be laid at the same temperature.In order to prevent wood from warping make sure that the floor humidity does not exceed
7 ± 2 % when laying the floor.
After installation:
1.Set the temperature at 18°C at the floor surface for no less than 48h. Then slowly increase the temperature by 1 or 2°C a day until the optimal temperature has been
reached. Do not make any sudden changes to the heating output during this period.
2. Do not raise the temperature above 26°C on the floor surface.
EN 14342
Howdens engineered ooring can be installed on any dry, clean, solid and even
surface. Additionally, the humidity of the suboor must be no more than 2% for
a concrete surface, 8% for wooden, and 0.5% for an anhydrite surface. Packages
should be stored horizontally in the environmentthey are to be installed for a mini-
mum of 48 hours without opening the packaging. The evenness of the surface
is measured with a min. 2 m measuring rod or a spirit level. The level difference
should not exceed 2 mm over 2 meters of the suboor. If the difference is greater,
it is vital that it should rst be evened out. The room should be well-ventilated and
the packaging should only be opened on the day of installation. Prior to installation,
the oorboards should be inspected and the pattern decided on. These instructions
should be read carefully.
1. The following tools are needed to install an engineered oor:
a hammer (1000 g), an assembly jig, wooden rule or measuring tape, ne-tooth
manual saw or an electric sawing machine, wooden wedges, a push block for nal
positioning of oorboards.
2. Use only the recommended underlay.
The direction in which the oorboards are to be installed is determined by the dimen-
sions of the room. If none of the sides exceeds 8 m, it is recommended that the
oorboards be installed along the direction of the light source or largest window.
In the case of dimensions bigger than 8 m, or long but narrow rooms such as cor-
ridors, the oor should always be installed parallel to the longest side of the room.
Having established the direction, the width of the room should be measured. This
value should then be decreased by the width of the expansion gaps (usually 2 x 10
mm) and divided by the width of the top layer. In this way, the number of rows of
oorboards to be installed can be calculated, and the dimensions of cutting the last
row can be determined; if it is narrower than 70 mm, the rst row of oorboards must
be trimmed correspondingly.
NOTE: If humidity of a concrete suboor exceeds 2-3%, damp insulation in the form
of 0.2 mm polyethylene lm is recommended in order to protect the oor covering
against the damp penetrating from below. It should be installed with an overlap of
200 mm, the joints being protected with adhesive tape.
3. Installation of the oor should begin with the underlay. You should butt the edges
of the underlay (never overlapping), with the exception of softboard underlay which
should be installed with a gap of 2 mm between the boards, and 10 mm between
the boards and the wall.
4. The rst row of boards should be installed tongue facing the wall. Individual oor-
boards should be joined along the shorter sides (headers) by sliding parallel to the
locking joint of the following boards. Another method is the frontal joining of boards
by means of a hammer and a push block for the nal positioning. The last board
should be trimmed to maintain an expansion gap into which wooden wedges should
be inserted.
5. The following row of boards should commence with the cut off section of the
board remaining from the rst row, provided that its length exceeds 50 cm. It is also
important to maintain a minimum of 50 cm between the ends of boards in the adja-
cent rows (staggered). The new row should be inserted tongue in groove and pressed
manually towards the previous row (Fig. 1). The board should be tapped lightly with
a wooden block into the previously installed row. The following board should be installed
in the same manner, maintaining a distance of 5 to 8 mm between the fronts of the
boards. The board should be indirectly tapped using a hammer and push block, thereby
joining the boards’ headers (Fig. 2).
6. Each subsequent row of boards installed should be pushed from the front-side of
the board in order to eliminate gaps in the header joints). Wedges should be inserted
into the gaps along the walls.
NOTE: No belts or straps should be used in the installation of the oor. In the case
of having to overcome an obstacle, such as central heating pipes, a fragment of the
board needing additional manoeuvring ought to be marked appropriately, cut and
xed (Fig. 3), all the time remembering to maintain the 15 mm expansion gap around
the element to be avoided (such as the central heating pipes). The resulting gap be-
tween the pipes and the oor can be covered up with a rosette.
7. The last row of boards should be very carefully measured prior to installation.
If they are too wide, the boards should be carefully cut accordingly. The joint of the
last row boards should be cut off to leave a at edge.
8. Upon completing the installation, the wedges should be removed and the remain-
ing gap should be covered with skirting boards, which should always be fastened to
the wall (never to the oor).
9. IImmediately after installing the skirting, the new oor is ready for use.
NOTES: During installation it should be remembered that the maximum oor area
without additional expansion joints is 8m of the board’s width and 20m of its
length. The oor should be used in the following conditions:
• air temperature: 18-24°C
• relative air humidity: 45-60%.
Damage to the oor caused by incorrect installation or damp do not constitute a de-
fective product. Acoustic effects connected with using the oor covering are a natu-
ral feature of wooden oors and, again do not constitute any faults. Nor does the
variation in colour and change of hue (darkening), which is the result of exposure
to the sun rays and is a natural feature of wood. The oor must not be installed in
unheated, damp rooms (bathrooms, saunas, laundries, etc.) or outdoors. Wooden
oorboards must be checked both before and during installation with regard to
possible defects. Installation of a oor with faulty boards will invalidate warranty
claims. Floorboards which are found to have defects prior to installation are subject
to warranty claims. Please note that the boards may have natural wood losses,
minor scratches, dents, lled-in cracks and the effects of the varnish treatment,
which are not necessarily considered defective. Any defects should be reported im-
mediately before continuing with the installation.
MAINTENANCE AND CARE OF FLOOR COVERINGS
In order to provide additional protection to the installed ooring, it is permissible to
apply additional layers of varnish or oil. (Subject to the existing nish – do not apply
oil over varnish for example).
After installation of a varnished oor, and during its subsequent use, it is recommended
to apply proper cleaning and maintenance agents, following the attached instructions.
The oor covering is easy to clean; this can be done with a vacuum cleaner with a special
end for wooden oors or with a brush. Spilt water and other contaminations should be re-
moved immediately. The worst enemies of wooden oors are water and sand; in order to
protect a oor against them, it is recommended to place protective mats at the entrance
to the property. Pedestals, and other areas of furniture pressure, should be protected
by gluing felt pads underneath them (not to be fastened with nails). When using ofce
furniture, e.g. chairs on casters, it is recommended to position roll-stop protective mats.
If the relative air humidity in the room drops below 40% (e.g. in the heating season), air
humidiers should be used.
RENOVATION OF VARNISHED FLOORS
When varnishing for renovation and regeneration purposes, polyurethane varnish is
recommended. Ensure you follow the manufacturer’s guidelines for the application.
Slightly worn surface areas can be varnished if there are no clear gaps in the original
varnish applied by the manufacturer. A test-varnishing should be performed on a
spare piece of oorboard remaining after installation.
Then proceed as follows:
1. Area should be degreased and any previously applied maintenance agents should
be removed thoroughly.
2. The entire surface should be carefully matted lengthways with ne sand paper
(granulation 180-250), to enhance the adhesion between the old and the new coats
of varnish. Failure to do so can result in the occurrence of visible scratches. Next,
the sanded oor should be dusted. Before applying the new layer, an adhesion test
should be performed on a less conspicuous patch of the oor.
3. The varnishing can then commence the new layer should be applied following
the instructions on the varnish label.
NOTE: Renovation work should be carried out by a professional contractor.
REGENERATION OF VARNISHED SURFACES
After years of use, or when heavily used, a varnished oor surface can become worn
and the wood damaged. In such cases the varnished surface can be refreshed by
applying a new layer of varnish, observing the recommended guidelines and using
polyurethane varnish.
Surface preparation:
1. Remove any maintenance agents from the surface in the appropriate manner (fol-
lowing the manufacturer’s recommendations).
2. When dry, the oor should be tarnished with a disk sander to remove the existing
layer of varnish and then dusted.
Varnishing:
Polyurethane varnish is recommended to be used following the manufacturer’s in-
structions after a prior test.
NOTE: Normal usage of the oor can resume after approximately 7 days. When
applying the varnish, tools designed for polyurethane products should be used. The
renovation should be performed by a professional contractor. The thickness of the
veneer guarantees the performing of oor renovation a minimum of three times.
In the case of substantial damage to a specic part of the oor, one or more oor-
boards can be replaced.
INSTALLATION OVER UNDERFLOOR HEATING
1. Set the heating at 18°C on the surface of the oor for 2 weeks minimum prior
to installation.
2. The ooring should be installed at the same temperature, following the standard
instructions for oatinginstallation.
3. The recommended unit power is 100 W/m
2
.
CAUTION: A precondition for laying the oor on the underoor heating system is to
perform a preheating for a period of 30 days while gradually increasing the tempera-
ture from the lowest values to the maximum ones allowed by the heating system.
If the installation is not to be carried out at once, but is scheduled to be done later,
the heating system must be set to 18°C (measured on the oor surface) 2 weeks
before the installation and the oor must be laid at the same temperature.In order
to prevent wood from warping make sure that the oor humidity does not exceed 7
± 2 % when laying the oor.
After installation:
1. Set the temperature at 18°C at the oor surface for no less than 48h. Then slowly
increase the temperature by 1 or 2°C a day until the optimal temperature has been
reached. Do not make any sudden changes to the heating output during this period.
2. Do not raise the temperature above 27°C on the oor surface.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
A1. A2. A3. A4.
1.
3.
2.
EN 14342
ENGINEERED WOOD FLOORING
INSTALLATION:
GLUELESS LOCKING SYSTEM
Natura engineered flooring can be installed on any dry, clean, solid and even surface. Additionally, the humidity of the subfloor must be no more than
2% for a concrete surface, 8% for wooden , and 0.5% for an anhydrite surface. Packages should be stored horizontally in the environmentthey are to be
installed for a minimum of 48 hours without opening the packaging. The evenness of the surface is measured with a min. 2 m measuring rod or
a spirit level. The level difference should not exceed 2mm over 2 meters of the subfloor. If the difference is greater, it is vital that it should first be evened
out. The room should be well-ventilated and the packaging should only be opened on the day of installation. Prior to installation, the floorboards should
be inspected and the pattern decided on. These instructions should be read carefully.
1. The following tools are needed to install an engineered floor:
a hammer (1000 g), an assembly jig, wooden rule or measuring tape, fine-tooth manual saw or an electric sawing machine,
wooden wedges, a push block for final positioning of floorboards.
2. Use only the recommended underlay.
The direction in which the floorboards are to be installed is determined by the dimensions of the room. If none of the sides
exceeds 8m, it is recommended that the floorboards be installed along the direction of the light source or largest window. In the
case of dimensions bigger than 8m, or long but narrow rooms such as corridors, the floor should always be installed parallel to
the longest side of the room. Having established the direction, the width of the room should be measured. This value should then
be decreased by the width of the expansion gaps (usually 2 x 10 mm) and divided by 207 mm, that is, by the width of a single
floorboard. In this way, the number of rows of floorboards to be installed can be calculated, and the dimensions of cutting the last
row can be determined; if it is narrower than 70mm, the first row of floorboards must be trimmed correspondingly.
NOTE: If humidity of a concrete subfloor exceeds 2-3%, damp insulation in the form of 0.2 mm polyethylene film is
recommended in order to protect the floor covering against the damp penetrating from below. It should be installed
with an overlap of 200 mm, the joints being protected with adhesive tape.
3. Installation of the floor should begin with the underlay. You should butt the edges of the underlay (never overlapping), with
the exception of softboard underlay which should be installed with a gap of 2mm between the boards, and 10mm between the
boards and the wall (Photo 2).
4. The first row of boards should be installed tongue facing the wall. Individual floorboards should be joined along the shorter
sides (headers) by sliding parallel to the locking joint of the following boards (Photo 3). Another method is the frontal joining of
boards by means of a hammer and a push block for the final positioning (Photo 4). The last board should be trimmed to maintain
an expansion gap into which wooden wedges should be inserted.
5. The following row of boards should commence with the cut off section of the board remaining from the first row, provided
that its length exceeds 50 cm. It is also important to maintain a minimum of 50 cm between the ends of boards in the adjacent
rows (staggered). The new row should be inserted tongue in groove and pressed manually towards the previous row (Photo 5,
Fig. 1). The board should be tapped lightly with a wooden block into the previously installed row (Photo 6). The following board
should be installed in the same manner, maintaining a distance of 5 to 8 mm between the fronts of the boards (Photo 7). The
board should be indirectly tapped using a hammer and push block, thereby joining the boards’ headers (Fig.2).
6. Each subsequent row of boards installed should be pushed from the front-side of the board in order to eliminate gaps in
the header joints) (Photo 8). Wedges should be inserted into the gaps along the walls.
NOTE: No belts or straps should be used in the installation of the floor. In the case of having to overcome an obstacle,
such as central heating pipes, a fragment of the board needing additional manoeuvring ought to be marked appropri-
ately, cut and fixed (Fig. 3), all the time remembering to maintain the 10 mm expansion gap around the element to be
avoided (such as the central heating pipes). The resulting gap between the pipes and the floor can be covered up with
a rosette.
7. The last row of boards should be very carefully measured prior to installation (Photo 9). If they are too wide, the boards should
be carefully cut accordingly. The joint of the last row boards should be cut off to leave a flat edge.
8. Upon completing the installation, the wedges should be removed and the remaining gap should be covered with skirting
boards, which should always be fastened to the wall (never to the floor).
9. IImmediately after installing the skirting, the new floor is ready for use.
NOTES: During installation it should be remembered that the maximum floor area without additional expansion joints
is 8m of the board’s width and 20m of its length. The floor should be used in the following conditions:
air temperature: 18-24°C
relative air humidity: 45-60%.
Damage to the floor caused by incorrect installation or damp do not constitute a defective product. Acoustic effects
connected with using the floor covering are a natural feature of wooden floors and, again do not constitute any faults.
Nor does the variation in colour and change of hue (darkening), which is the result of exposure to the sun rays and is a
natural feature of wood. The floor must not be installed in unheated, damp rooms (bathrooms, saunas, laundries, etc.)
or outdoors. Wooden floorboards must be checked both before and during installation with regard to possible defects.
Installation of a floor with faulty boards will invalidate warranty claims. Floorboards which are found to have defects
prior to installation are subject to warranty claims. Please note that the boards may have natural wood losses, minor
scratches, dents, filled-in cracks and the effects of the varnish treatment, which are not necessarily considered defec-
tive. Any defects should be reported immediately before continuing with the installation.
MAINTENANCE AND CARE OF FLOOR COVERINGS
In order to provide additional protection to the installed flooring, it is permissible to apply additional layers of varnish or oil. (Sub-
ject to the existing finish – do not apply oil over varnish for example).
After installation of a varnished floor, and during its subsequent use, it is recommended to apply proper cleaning and mainte-
nance agents, following the attached instructions. The floor covering is easy to clean; this can be done with a vacuum cleaner
with a special end for wooden floors or with a brush. Spilt water and other contaminations should be removed immediately.
The worst enemies of wooden floors are water and sand; in order to protect a floor against them, it is recommended to place
protective mats at the entrance to the property. Pedestals, and other areas of furniture pressure, should be protected by gluing
felt pads underneath them (not to be fastened with nails). When using office furniture, e.g. chairs on casters, it is recommended
to position roll-stop protective mats. If the relative air humidity in the room drops below 40% (e.g. in the heating season), air
humidifiers should be used.
RENOVATION OF VARNISHED FLOORS
When varnishing for renovation and regeneration purposes, polyurethane varnish is recommended. Ensure you follow the manu-
facturer’s guidelines for the application. Slightly worn surface areas can be varnished if there are no clear gaps in the original
varnish applied by the manufacturer. A test-varnishing should be performed on a spare piece of floorboard remaining after
installation.
Then proceed as follows:
1. Area should be degreased and any previously applied maintenance agents should be removed thoroughly.
2. The entire surface should be carefully matted lengthways with fine sand paper (granulation 180-250), to enhance the adhesion
between the old and the new coats of varnish. Failure to do so can result in the occurrence of visible scratches. Next, the sanded
floor should be dusted. Before applying the new layer, an adhesion test should be performed on a less conspicuous patch of the
floor.
3. The varnishing can then commence – the new layer should be applied following the instructions on the varnish label.
NOTE: Renovation work should be carried out by a professional contractor.
REGENERATION OF VARNISHED SURFACES
After years of use, or when heavily used, a varnished floor surface can become worn and the wood damaged. In such cases
the varnished surface can be refreshed by applying a new layer of varnish, observing the recommended guidelines and using
polyurethane varnish.
Surface preparation:
1. Remove any maintenance agents from the surface in the appropriate manner (following the manufacturer’s recommenda-
tions).
2. When dry, the floor should be tarnished with a disk sander to remove the existing layer of varnish and then dusted.
Varnishing:
Polyurethane varnish is recommended to be used following the manufacturer’s instructions after a prior test.
NOTE: Normal usage of the floor can resume after approximately 7 days. When applying the varnish, tools designed for
polyurethane products should be used. The renovation should be performed by a professional contractor. The thickness
of the veneer guarantees the performing of floor renovation a minimum of three times. In the case of substantial dam-
age to a specific part of the floor, one or more floorboards can be replaced.
INSTALLATION OVER UNDERFLOOR HEATING
1. Set the heating at 18°C on the surface of the floor for 2 weeks minimum prior to installation.
2. The flooring should be installed at the same temperature, following the standard instructions for floatinginstallation.
3. The recommended unit power is 100 W/m
2
.
CAUTION: A precondition for laying the floor on the underfloor heating system is to perform a preheating for a period of 30 days while gradually increasing
the temperature from the lowest values to the maximum ones allowed by the heating system.
If the installation is not to be carried out at once, but is scheduled to be done later, the heating system must be set to 18°C (measured on the floor surface) 2 weeks
before the installation and the floor must be laid at the same temperature.In order to prevent wood from warping make sure that the floor humidity does not exceed
7 ± 2 % when laying the floor.
After installation:
1.Set the temperature at 18°C at the floor surface for no less than 48h. Then slowly increase the temperature by 1 or 2°C a day until the optimal temperature has been
reached. Do not make any sudden changes to the heating output during this period.
2. Do not raise the temperature above 26°C on the floor surface.
EN 14342
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
A1. A2. A3. A4.
1.
3.
2.
EN 14342
ENGINEERED WOOD FLOORING
INSTALLATION:
GLUELESS LOCKING SYSTEM
Natura engineered flooring can be installed on any dry, clean, solid and even surface. Additionally, the humidity of the subfloor must be no more than
2% for a concrete surface, 8% for wooden , and 0.5% for an anhydrite surface. Packages should be stored horizontally in the environmentthey are to be
installed for a minimum of 48 hours without opening the packaging. The evenness of the surface is measured with a min. 2 m measuring rod or
a spirit level. The level difference should not exceed 2mm over 2 meters of the subfloor. If the difference is greater, it is vital that it should first be evened
out. The room should be well-ventilated and the packaging should only be opened on the day of installation. Prior to installation, the floorboards should
be inspected and the pattern decided on. These instructions should be read carefully.
1. The following tools are needed to install an engineered floor:
a hammer (1000 g), an assembly jig, wooden rule or measuring tape, fine-tooth manual saw or an electric sawing machine,
wooden wedges, a push block for final positioning of floorboards.
2. Use only the recommended underlay.
The direction in which the floorboards are to be installed is determined by the dimensions of the room. If none of the sides
exceeds 8m, it is recommended that the floorboards be installed along the direction of the light source or largest window. In the
case of dimensions bigger than 8m, or long but narrow rooms such as corridors, the floor should always be installed parallel to
the longest side of the room. Having established the direction, the width of the room should be measured. This value should then
be decreased by the width of the expansion gaps (usually 2 x 10 mm) and divided by 207 mm, that is, by the width of a single
floorboard. In this way, the number of rows of floorboards to be installed can be calculated, and the dimensions of cutting the last
row can be determined; if it is narrower than 70mm, the first row of floorboards must be trimmed correspondingly.
NOTE: If humidity of a concrete subfloor exceeds 2-3%, damp insulation in the form of 0.2 mm polyethylene film is
recommended in order to protect the floor covering against the damp penetrating from below. It should be installed
with an overlap of 200 mm, the joints being protected with adhesive tape.
3. Installation of the floor should begin with the underlay. You should butt the edges of the underlay (never overlapping), with
the exception of softboard underlay which should be installed with a gap of 2mm between the boards, and 10mm between the
boards and the wall (Photo 2).
4. The first row of boards should be installed tongue facing the wall. Individual floorboards should be joined along the shorter
sides (headers) by sliding parallel to the locking joint of the following boards (Photo 3). Another method is the frontal joining of
boards by means of a hammer and a push block for the final positioning (Photo 4). The last board should be trimmed to maintain
an expansion gap into which wooden wedges should be inserted.
5. The following row of boards should commence with the cut off section of the board remaining from the first row, provided
that its length exceeds 50 cm. It is also important to maintain a minimum of 50 cm between the ends of boards in the adjacent
rows (staggered). The new row should be inserted tongue in groove and pressed manually towards the previous row (Photo 5,
Fig. 1). The board should be tapped lightly with a wooden block into the previously installed row (Photo 6). The following board
should be installed in the same manner, maintaining a distance of 5 to 8 mm between the fronts of the boards (Photo 7). The
board should be indirectly tapped using a hammer and push block, thereby joining the boards’ headers (Fig.2).
6. Each subsequent row of boards installed should be pushed from the front-side of the board in order to eliminate gaps in
the header joints) (Photo 8). Wedges should be inserted into the gaps along the walls.
NOTE: No belts or straps should be used in the installation of the floor. In the case of having to overcome an obstacle,
such as central heating pipes, a fragment of the board needing additional manoeuvring ought to be marked appropri-
ately, cut and fixed (Fig. 3), all the time remembering to maintain the 10 mm expansion gap around the element to be
avoided (such as the central heating pipes). The resulting gap between the pipes and the floor can be covered up with
a rosette.
7. The last row of boards should be very carefully measured prior to installation (Photo 9). If they are too wide, the boards should
be carefully cut accordingly. The joint of the last row boards should be cut off to leave a flat edge.
8. Upon completing the installation, the wedges should be removed and the remaining gap should be covered with skirting
boards, which should always be fastened to the wall (never to the floor).
9. IImmediately after installing the skirting, the new floor is ready for use.
NOTES: During installation it should be remembered that the maximum floor area without additional expansion joints
is 8m of the board’s width and 20m of its length. The floor should be used in the following conditions:
air temperature: 18-24°C
relative air humidity: 45-60%.
Damage to the floor caused by incorrect installation or damp do not constitute a defective product. Acoustic effects
connected with using the floor covering are a natural feature of wooden floors and, again do not constitute any faults.
Nor does the variation in colour and change of hue (darkening), which is the result of exposure to the sun rays and is a
natural feature of wood. The floor must not be installed in unheated, damp rooms (bathrooms, saunas, laundries, etc.)
or outdoors. Wooden floorboards must be checked both before and during installation with regard to possible defects.
Installation of a floor with faulty boards will invalidate warranty claims. Floorboards which are found to have defects
prior to installation are subject to warranty claims. Please note that the boards may have natural wood losses, minor
scratches, dents, filled-in cracks and the effects of the varnish treatment, which are not necessarily considered defec-
tive. Any defects should be reported immediately before continuing with the installation.
MAINTENANCE AND CARE OF FLOOR COVERINGS
In order to provide additional protection to the installed flooring, it is permissible to apply additional layers of varnish or oil. (Sub-
ject to the existing finish – do not apply oil over varnish for example).
After installation of a varnished floor, and during its subsequent use, it is recommended to apply proper cleaning and mainte-
nance agents, following the attached instructions. The floor covering is easy to clean; this can be done with a vacuum cleaner
with a special end for wooden floors or with a brush. Spilt water and other contaminations should be removed immediately.
The worst enemies of wooden floors are water and sand; in order to protect a floor against them, it is recommended to place
protective mats at the entrance to the property. Pedestals, and other areas of furniture pressure, should be protected by gluing
felt pads underneath them (not to be fastened with nails). When using office furniture, e.g. chairs on casters, it is recommended
to position roll-stop protective mats. If the relative air humidity in the room drops below 40% (e.g. in the heating season), air
humidifiers should be used.
RENOVATION OF VARNISHED FLOORS
When varnishing for renovation and regeneration purposes, polyurethane varnish is recommended. Ensure you follow the manu-
facturer’s guidelines for the application. Slightly worn surface areas can be varnished if there are no clear gaps in the original
varnish applied by the manufacturer. A test-varnishing should be performed on a spare piece of floorboard remaining after
installation.
Then proceed as follows:
1. Area should be degreased and any previously applied maintenance agents should be removed thoroughly.
2. The entire surface should be carefully matted lengthways with fine sand paper (granulation 180-250), to enhance the adhesion
between the old and the new coats of varnish. Failure to do so can result in the occurrence of visible scratches. Next, the sanded
floor should be dusted. Before applying the new layer, an adhesion test should be performed on a less conspicuous patch of the
floor.
3. The varnishing can then commence – the new layer should be applied following the instructions on the varnish label.
NOTE: Renovation work should be carried out by a professional contractor.
REGENERATION OF VARNISHED SURFACES
After years of use, or when heavily used, a varnished floor surface can become worn and the wood damaged. In such cases
the varnished surface can be refreshed by applying a new layer of varnish, observing the recommended guidelines and using
polyurethane varnish.
Surface preparation:
1. Remove any maintenance agents from the surface in the appropriate manner (following the manufacturer’s recommenda-
tions).
2. When dry, the floor should be tarnished with a disk sander to remove the existing layer of varnish and then dusted.
Varnishing:
Polyurethane varnish is recommended to be used following the manufacturer’s instructions after a prior test.
NOTE: Normal usage of the floor can resume after approximately 7 days. When applying the varnish, tools designed for
polyurethane products should be used. The renovation should be performed by a professional contractor. The thickness
of the veneer guarantees the performing of floor renovation a minimum of three times. In the case of substantial dam-
age to a specific part of the floor, one or more floorboards can be replaced.
INSTALLATION OVER UNDERFLOOR HEATING
1. Set the heating at 18°C on the surface of the floor for 2 weeks minimum prior to installation.
2. The flooring should be installed at the same temperature, following the standard instructions for floatinginstallation.
3. The recommended unit power is 100 W/m
2
.
CAUTION: A precondition for laying the floor on the underfloor heating system is to perform a preheating for a period of 30 days while gradually increasing
the temperature from the lowest values to the maximum ones allowed by the heating system.
If the installation is not to be carried out at once, but is scheduled to be done later, the heating system must be set to 18°C (measured on the floor surface) 2 weeks
before the installation and the floor must be laid at the same temperature.In order to prevent wood from warping make sure that the floor humidity does not exceed
7 ± 2 % when laying the floor.
After installation:
1.Set the temperature at 18°C at the floor surface for no less than 48h. Then slowly increase the temperature by 1 or 2°C a day until the optimal temperature has been
reached. Do not make any sudden changes to the heating output during this period.
2. Do not raise the temperature above 26°C on the floor surface.
EN 14342
108
5
  • Page 1 1
  • Page 2 2

Howdens SDH3636 Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI