Endeavor Line
Machine Start Summary
Power UP Each Machine
This is a summary of the start sequence for the
Endeavor Line. These instructions assume that a
Door Job has been created to be used in the ma-
chining process.
1. Verify the area of operation is clear
and safe to machine product.
2. Ensure factory air is applied to ma-
chine and main air supply is turned
on.
3. Verify that all E-Stop buttons are
OUT and Gates are CLOSED.
4. Turn the Electrical Disconnect to the
ON positions on each Electrical
Cabinet.
5. Turn the Control Transformer for each
machine.
6. Initiate the START MACHINE button (Ap-
proximately 3 minute Boot-up)
7. All Six Light Indicators Should be ON
8. KvalCam will be loaded and ready for
work
9. Initiate the Light Curtain Reset but-
tons on the Feeder and Stacker
Process
After the Operator Station has completed boot-
ing up, the KvalCAM User Interface will start
automatically. The program will default to the
Machine Line Screen.
Note: Every machine in the line will
Home. Each machine status will display
Idle in the Machine Feedback Status box
on completion
1. Select the Home Machine Line Button.
2. Press Auto Feed Button to get the line
ready for work.
Ensure all machines have completed
the Home sequence:
3. Select the Libraries Tab and Select a Door
Job from the List
4. Select the Edit Button from the buttons at the
bottom of the screen.
Note: The Edit button jumps to the Job Creation
Screen. If needed, create or add a feature to the door
job. For example select the Add From Library button to
add a predetermined template.
5. Ensure the door job is correct, and then en-
ter the Door Qty. of doors to be processed.
6. Select the Add to Queue button
Ensure all machines in the line
are Powered, Homed, are in Auto
mode and Light Curtain is Reset.
Ensure doors are loaded. and it is
safe to run doors.
7. Select the Feeder Tab
8. Enter number of doors to process in the
Door Qty. box
9. Press the Start Sequence button on the
Feeder Screen OR press the green Start
Sequence on the operator station.