![](//vs1.manuzoid.com/store/data-gzf/9ea29e2418922054f234c906d9c85ac4/2/000899036.htmlex.zip/bg1.jpg)
Tools Required: None
1.
construction document.
2. Adjust screw to slightly short of the length needed between footer and load
carrying beam at installation location (Figure
➊
).
3.
nut and screw on the footer (adjustable end down) (Figure
➋
).
4.
and the footer below (Figure
➌
).
5. Additional screw adjustments may be made during construction to keep
floor level
6.
(Figure
➍
).
LOAD
FOOTER
specific installation requirements in your area.
➋
➊ ➍
➌
adJustable COlumNs
iNstallatiON iNstruCtiONs
©Tiger Brand Jack Post 2014
TIGER BRAND JACK POST | 330.576.1750 | TigerBrandJackPost.com