Zurn Z1400-3NL Installation guide

Type
Installation guide
Zurn Industries, LLC | Specification Drainage Operation
1801 Pittsburgh Avenue, Erie, PA U.S.A. 16502 · Ph. 855-663-9876, Fax 814-454-7929
In Canada | Zurn Industries Limited
3544 Nashua Drive, Mississauga, Ontario L4V 1L2 · Ph. 905-405-8272, Fax 905-405-1292
www.zurn.com
®
Rev. A
Date: 4/17/2018
C.N. No. 139910
Form No. CO3
Page 1 of 1
WARNING: Cancer and Reproductive Harm - www.P65Warnings.ca.gov
ADVERTENCIA: Cáncer y daño reproductivo - www.P65Warnings.ca.gov
AVERTISSEMENT: Cancer et effets néfastes sur la reproduction - www.P65Warnings.ca.gov
Z1400-KC
TYPICAL INSTALLATION
"LEVEL-TROL" FLOOR CLEANOUT
Z1400-KC "LEVEL-TROL" FLOOR CLEANOUT- ADJUSTABLE
Heavy-duty cast iron cleanout is easily installed in any type floor. The cleanout head allows 2" [51mm] of adjustment to meet
finished floor conditions. Cleanout is supplied with a foam thread protector to keep threads clean prior to and during final concrete
pour. Thread protector must then be removed and void filled with concrete to insure working load rating.
  • Page 1 1

Zurn Z1400-3NL Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI