Graywind WPC010 User manual

  • Hello! I have carefully reviewed the user manual for the Smart Electric Curtain WPC010. This document provides detailed instructions on how to install and operate your smart curtain, including adjusting the rod, mounting the motor, remote control operation, app setup and voice control. I'm here to assist you with any questions you might have about the device or its features. Feel free to ask me about setting up limit positions, enabling manual mode, or any other aspect of the installation or operation process.
  • What is the maximum curtain height this system supports?
    Can the system be used outdoors or in high-temperature environments?
    What should I do if I need to adjust the truck length?
SMART ELECTRIC
CURTAIN INSTRUCTION
Motor: P361-US
Version: 1.0 Date: 20200915
WPC010
1
3
4
5
The system should not be used outdoor or in
high temperature environment, and need to
avoid exposure to the sun.
motor working tempreture -10 ~ +50
Please don't impact or drop any parts; don't
disassemble and repair any parts.
Please don't use volatile chemicals (such as
thinners or ben zene) which may cause fire or
other problems on parts.
When wiring, please follow the wiring diagram.
Please don't splash the water on main part like
shade rail, motor. Which may lead to parts of
problems, leakage, fire and so on.
2
1
2
Curtain installation
Motor installation
Brackets installation
Truck trim stripe installation
1
Attentions
3
Telescoping rod width
5
16
4
Preparation
Adjust curtain rod 6
Contents
7
8
Hanger installation
10
9
Adjust turck
17
18
21
22
19
20
23-25
26
27
28
29-32
33-35
12-15
Remote control
Set limit position instruction
Motor parameters
"Tuya Smart" app user manual
Alexa&voice control
CONTENTS
Side-Wall installation
Ceiling-Wall installation
Deltete remote control
Disable manual mode
Enable manual mode
Side-Wall Valance Installation
Ceiling-Wall Valance Installation
3
TELESCOPING ROD WIDTH
The product can only be available for curtain
with height less than 3m
400cm
220cm
6.52cm
CENTER-OPEN
4
5m
PREPARATION
5
g
1
xN
x1
c x2
i x1
e3pcs/M
a x
3
f x1
j x1
b
x
13
h xN
g
2
xN
d
x
36
m
xN
Accessories for valance installationoptional
All accessories included
I------- -------I
I------ -----I
I---- ----I
I------- -----I
3cm
3.7cm
3cm
I-----------I
1.5cm
3.5cm
I-------I
1.5cm
I-----I
0.9cm
k1pcs/M L x2
6
01.
03.
W
02.
R
L
R
L
ADJUST CURTAIN ROD
7
04.
05.
06.
R
L
Only one side has screws to
adjust the truck.
ADJUST TURCK
8
07.
d
x36
c
2x
c
d
HANGER INSTALLATION
9
08.
f.
f.
5m
TRUCK TRIM STRIPE INSTALLATION
10
09.
ba
a a
bb
10mm
10mm 50cm 50cm 50cm 50cm 50cm
90
BRACKETS INSTALLATION
ba
90
11
CEILING-WALL INSTALLATION (P16)
W
10cm
SIDE-WALL INSTALLATION (P12-P15)
W
12
01.
e
e
e
h
h
10cm
5cm
3.5cm
SIDE-WALL INSTALLATION
3pcs/M
13
SIDE-WALL INSTALLATIONVALANCE
k1pcs/M
h
k
h
k
*Please note that the valance is optional product. You don't need to
read this part of instructions if the valance is not ordered.
14
02.
SIDE-WALL INSTALLATION
15
03.
SIDE-WALL INSTALLATION
g
2
g
2
16
01.
02. 03.
CEILING-WALL INSTALLATION
g
1
g
1
17
CURTAIN INSTALLATION
m
18
MOTOR INSTALLATION
i
19
01.
02.
03.
SIDE-WALL VALANCE INSTALLATION
Please bend the two valance rails "L" from two sides
into 90 degrees along the dotted line.
*Please note that the valance is optional product. You don't need to
read this part of instructions if the valance is not ordered.
90°
L
x2
L
/