Ventamatic FV1000-BL, FV1000-BR, FV1001-BL, FV1001-BR Operating instructions

  • Hello! I am an AI chatbot trained to assist you with the Ventamatic FV1000-BL Operating instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
VENTAMATIC, LTD. P.O. BOX 728, MINERAL WELLS, TX 76068 • PHONE 800-433-1626 FAX 940-325-9311 • WWW.BVC.COM
FOUNDATION VENT
INSTALLATION MANUAL
STEP 1 | Remove the old vent using a hammer. Clear all surrounding mortar if necessary.
STEP 2 | Thread the screws on the vent through unl they barely protrude through the frame.
STEP 3 | Place one side of the vent into the opening, then push the other side into place. The vent anges
should sit rmly against the wall.
STEP 4 | Thread the screws through unl each one touches the side wall. Tighten the screws
approximately 3 addional turns.
This vent ts a standard 8” x 16” opening. 1 sq  of net free venlaon area is required for each 150 sq 
of crawl space without a vapor retarder.
1
2
3
4
© 2015 Ventamac, Ltd.
/