![](//vs1.manuzoid.com/store/data-gzf/132a35b0c9def09c5fca53c27b42f9a4/3/002028245.htmlex.zip/bg1.jpg)
Insert tube stiffener with chemical tubing into
corresponding chemical dispensers.
5
STEP
BLUE RED WHITE
1
STEP
Connect 110/120V, 60HZ hard wired power
supply to power box. DO NOT USE POWER
CORD OR GFI OUTLET.
Connect dishmachine to hot water source
recommended 140
0
temperature (120
0
minimum temperature required).
STEP
2
L -1X16 / L -1X
Quick Setup
Instructions ELECTRICAL
CONNECTION 1
TUBE
STIFFENER 5
CHEMICAL
TUBING 5
DRAIN HOSE
CONNECTION 4
1/2" WATER INLET
2
LEVELING LEGS
3
Level dishmachine by adjusting leveling legs.
Dishmachine must be level front and back to
ensure proper performance.
3
STEP
L-1X16 LEG
ADJUSTER
L-1X LEG
ADJUSTER
Connect the drain hose to wall or floor drain.
The floor drain must have a 1 inch air gap
between drain hose and floor drain.
WALL DRAIN FLOOR DRAIN
1"AIR GAP
4
STEP
WARNING: Electrical and plumbing
connections need to be made by a
licensed service person and comply
with all Federal, State and Local
Health, Electrical, Plumbing and
Safety codes.
5-2015
REAR VIEW
800-854-6417
HOT
NEUTRAL
GROUND