Pelco c2485m-a-ml User manual

Type
User manual

This manual is also suitable for

Pelco pelco c2485m-a-ml is a pressurized Spectra III fiber optic system designed for demanding applications. It features a 16-pin connector for easy installation of a fiber optic module, and a V-band for quick and easy access to the interior of the dome. The c2485m-a-ml also includes a Schrader valve for pressurizing the dome with nitrogen, which helps to prevent condensation and fogging. With its rugged construction and reliable performance, the c2485m-a-ml is an ideal choice for use in a variety of security and surveillance applications.

Pelco pelco c2485m-a-ml is a pressurized Spectra III fiber optic system designed for demanding applications. It features a 16-pin connector for easy installation of a fiber optic module, and a V-band for quick and easy access to the interior of the dome. The c2485m-a-ml also includes a Schrader valve for pressurizing the dome with nitrogen, which helps to prevent condensation and fogging. With its rugged construction and reliable performance, the c2485m-a-ml is an ideal choice for use in a variety of security and surveillance applications.

INSTALLATION
Pressurized
Spectra III
Series
Fiber Optic Models
English
Español
Português
Italiano
Français
Deutsch
C2485M-A-ML (2/05)
C2485M-A-ML (2/05) 3
E
ng
li
s
h
E
spa
ñ
o
l
P
or
t
ugu
ê
s
It
a
li
ano
F
rança
i
s
D
eu
t
sc
h
NOTE:
This manual is designed to be a reference tool for the installation of your system. For best results and
ease of installation, the dome system should be assembled, pressurized, and tested before installation.
A Pressurized Spectra III cable harness (supplied with the back box) is required to test and monitor the
pressurized dome.
HINWEIS:
In diesem Handbuch finden Sie Anleitungen zur Installation Ihres Systems. Es empfiehlt sich, das
Domesystem vor der Installation zusammenzubauen, unter Überdruck zu setzen und zu testen. Zum
Testen und Überprüfen des unter Überdruck gesetzten Dome wird der mit der Back-Box gelieferte
Kabelsatz für das Spectra III Domesysteme mit Druckgehäuse benötigt.
NOTA:
Este manual está diseñado para emplearse como una herramienta de referencia para la instalación de
su sistema. Para obtener mejores resultados y una instalación sencilla, el sistema de domo debe
ensamblarse, presurizarse y probarse antes de la instalación. Se requiere un arnés de cableado del
Spectra III Presurizado (suministrado con la caja posterior) a fin de probar y monitorear el domo
presurizado.
OBSERVAÇÃO:
Este manual foi desenvolvido para servir como ferramenta de referência para a instalação do seu
sistema. Para obter melhores resultados e facilitar a instalação, o sistema de dome deve ser montado,
pressurizado e testado antes da instalação. Um módulo de cabo pressurizado Spectra III (fornecido com
a back box) é necessário para testar e monitorar o dome pressurizado.
NOTA:
questo manuale è concepito come strumento di riferimento per l'installazione del sistema. Per i risultati
ottimali e per facilitarne l'installazione, il sistema dome va montato, pressurizzato e collaudato prima
dell'installazione. Al fine di collaudare e controllare il dome pressurizzato occorre disporre di un cavo
Spectra III (in dotazione al contenitore).
REMARQUE :
Ce manuel est destiné à être un outil de référence lors de l'installation de votre système. Pour faciliter
l'installation et obtenir les meilleurs résultats, assemblez, pressurisez et testez le système de dôme
avant de l'installer. Un faisceau de câbles série Spectra III pressurisée (fourni avec l'embase) est requis
pour tester et surveiller le dôme pressurisé.
4 C2485M-A-ML (2/05)
Preinstallation
English
1
Install the fiber optic module: Open the hinged door to the back box
by pushing the tab lock towards the wall of the unit and lifting the
door open. Remove the plug from the 16-pin connector. Install the
module in the 16-pin connector. Secure the module to the circuit
board standoff using the screw and lock washer provided. Connect
the back box fiber optic connector to the mating connector on the
module. Follow all applicable instructions provided by the
manufacturer of the fiber optic module.
2
Loosen the V-band attached to the back box and let it hang to
the side.
3
Prepare the lower dome for installation:
a. Remove the O-ring from the lower dome.
b. Lightly apply O-ring lubricant (supplied) to the O-ring.
c. Reinstall the O-ring in the groove on the trim ring.
IMPORTANT:
Use the supplied O-ring lubricant to ensure an air-
tight seal when installing the lower dome.
4
Attach the back box leash to the lower dome, and let the lower
dome hang to the other side of the back box.
16-PIN
CONNECTOR
B
C2485M-A-ML (2/05) 5
English
5
Install the dome drive:
a. Set the DIP switches located on the side of the dome drive.
Refer to the labels located on the top of the dome drive or to
the Quick Start Guide shipped with the dome drive.
b. Line up the blue (A) and red (B) tabs with the blue (A) and red
(B) labels.
c. Push in on the tabs. Insert one side and then the other side.
Continue pushing until both sides of the dome drive click
into place.
6
Install the lower dome:
a. Position the lower dome so that the blower duct inside the
back box is between the studs attached to the inside of the
lower dome.
b. Install the V-band around the lower dome and then tighten the
fastener of the V-band.
c. Test and check the operation of the unit before pressurizing
the dome.
7
Pressurize the inside of the dome with nitrogen:
a. Remove the cap from the Schrader valve of the dome. Place
the air chuck from the charging kit over the Schrader valve of
the dome system.
NOTE:
You may use your own charging equipment or Pelco’s
EH8000RKIT recharge kit. If you are using your own equipment,
adjust the regulator for an output pressure of 12 psi (83 kPa).
b. Open the tank valve of the charging kit. Fill the dome with
nitrogen for a
minimum of five minutes
to replace the
oxygen inside the dome with nitrogen.
c. Remove the air chuck and then replace the Schrader valve cap.
d. Refer to the
Operation/Programming
manual for instructions on
how to view the current readings for temperature and pressure.
Record the initial temperature and pressure readings of the
dome in the space provided below:
Initial Temperature _______________
Initial Pressure _________________
IMPORTANT:
Record the initial temperature and pressure
readings for future reference.
NOTE:
It is normal for changes in temperature to cause dome
pressure to rise and fall.
SW1 SW2 SW3
6 C2485M-A-ML (2/05)
Site Installation
English
1
Feed a fiber optic cable (not supplied) and the supplied wiring harness into
the front of the mount and out the back of the mount. Connect the wires
as required. Refer to Tables A, B, and C for cable and wiring information.
Fasten the mount to the mounting surface. Refer to the instructions
supplied with the mount.
2
Remove the back box mounting plate: Loosen the nuts on top of the back
box until they reach the locking material at the end of the studs, and then
turn the mounting plate clockwise and lift.
3
Thread the wiring from the mount through the mounting plate, and
then attach the mounting plate to the mount. If outdoors, apply thread
compound (provided) to the threads on the mounting plate.
4
Attach the connector of the wire harness to the mating connector located
on the top of the back box. Connect the fiber optic cable. Insert the studs
and nuts on top of the back box into the mounting plate, turn the back box
counterclockwise, and then tighten the three nuts.
C2485M-A-ML (2/05) 7
E
ng
li
s
h
NOTE:
These are the recommended maximum distances for 24 VAC
applications and are calculated with a 10 percent voltage drop. (Ten
percent is generally the maximum allowable voltage drop for
AC-powered devices.)
NOTE:
Input power for the dome is 24 VAC only. Power
consumption is 75 VA per dome.
Use a 24 VAC transformer with a minimum of 100 VA.
Table A.
Fiber Optic Cable Types
Spectra Model Cable Type Connector
Single mode (PRS models) 9/125 µm cable ST type
Multimode (PRM models) 62.5/125 µm cable ST type
Table B.
24 VAC Wiring Distances
Wire Gauge
Total VA 20
(0.5 mm
2
)
18
(1.0 mm
2
)
16
(1.5 mm
2
)
16
(2.5 mm
2
)
75
37 ft
(11 m)
60 ft
(18 m)
95 ft
(29 m)
153 ft
(46 m)
Table C.
Configuration of Wire Harness
Pin Wire Color Function
9-Conductor Cable
A Black Alarm 1
B Red Alarm 2
C White Alarm 3
D Green Alarm 4
E Brown Alarm 5
F orange Alarm 6
GYellow Alarm 7
HViolet Ground
Blue Not Used
5-Conductor Cable
J Black Relay N.O. (Aux. 1)
K Red Relay N.C. (Aux. 1)
L Green Relay Common (Aux. 1)
M Brown Ground
N White Auxilary 2
Power Wires
a White 24 VAC (AC HI)
b Black 24 VAC (AC LO)
c Green/Yellow Earth Ground
Worldwide Headquarters
3500 Pelco Way
Clovis, California 93612 USA
USA & Canada
Tel: 800/289-9100
Fax: 800/289-9150
International
Tel: 1-559/292-1981
Fax: 1-559/348-1120
www.pelco.com
ISO9001
United States | Canada | United Kingdom | The Netherlands | Singapore | Spain | Scandinavia | France | Middle East
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28

Pelco c2485m-a-ml User manual

Type
User manual
This manual is also suitable for

Pelco pelco c2485m-a-ml is a pressurized Spectra III fiber optic system designed for demanding applications. It features a 16-pin connector for easy installation of a fiber optic module, and a V-band for quick and easy access to the interior of the dome. The c2485m-a-ml also includes a Schrader valve for pressurizing the dome with nitrogen, which helps to prevent condensation and fogging. With its rugged construction and reliable performance, the c2485m-a-ml is an ideal choice for use in a variety of security and surveillance applications.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI