Hanover HANMLTISHD-GW User manual

  • Hello! I am an AI chatbot trained to assist you with the Hanover HANMLTISHD-GW User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Requires two people and takes urs for lnstallation.
Size:L5 x W10.3 x H6.7 Feet
9820001-1
Metal Garden Shed
OWNER'S MANUAL
Instructions for Assembly
Requires two people and takes 2-3 hours for lnstallation.
Quick & Easy Assembly
Ridge Reinforced Walls
-1-
Metal Garden Shed
OWNER'S MANUAL
Instructions for Assembly
Quick & Easy Assembly
Ridge Reinforced Walls
-1-
9820001-2
Size:L152 x W309 x H203cm
4-5
-2-
BEFORE YOU START
Owner's Manual
Prior to installation, it is important that you contact your local government authority to
determine if building approval is required. Study and understand this owner's manual.
Important information and helpful tips will make your construction easier and more
enjoyable.
Assembly instructions
Instructions are supplied in this manual and contain all appropriate information for your
building model. Review all instructions before you begin. During assembly, follow the
step sequence carefully for correct results .Please be aware: this unit takes two people
about one full day to complete.
Parts
Check to be sure that you have all the necessary parts for the building.
Familiarize
yourself
with
the
hardware
and
fasteners
for
easier
use
during
construction. These are packaged within the carton. Note that extra fasteners have been
supplied for your convenience.
TOOLS MAY REQUIRED
Use heavy duty gloves when handling steel sheets and flashing
PLAN AHEAD
Site Selection
l Avoid overhanging trees as much as possible as leaves will make regular cleaning
necessary and broken branches are a potential hazard.
l Small trees,bushes or fences nearby can be helpful,acting as a wind break.
Site Preparation
The site must be prepared so that the base of the shed is level all round and checking
with a spirit level is required.
The base can be constructed by treated timber or concrete,in order to stop the moisture
getting into the shed.The shed is not designed to be built onto lawn directly.Also the
ground will get muddy during rainy days.
If a concrete pad is made,it is important that this slopes towards the edges to prevent
water ingress.
Time must be allowed for any concrete or cement to dry before building the shed on top.
Bases can also be constructed from bricks,blocks,or mounted on a concrete pad.
The bricks or blocks should be cemented onto firm and level concrete footings and the
greenhouse frame drilled and screwed to the base.
IMPORTANT NOTES:
l Find someone to help you:it is much easier with someone to hold parts,pass tools
ect.Also some steps require two people to lift structures together.This is not very
heavy work so would suit most able-bodied people.
l Allow plenty of time:rushing often causes errors and the re-doing of incorrect
assemblies.If you have never built a shed before,it can take most of a day to carefully
complete the construction.
l Have the right tools to hand.
l Safety clothing as recommended in the 'Tools' section.
l Ideally lat out the parts and check that all are present before commencing
construction.Lay on cloths or plastic sheets if there is any risk of scratching the parts.
l Tighten all nuts carefully,being sure not to miss any.Check the frame is square and
using a spirit level to check that it is upright.
PLAN AHEAD
Watch the weather:
Please be sure the day you select for installation is dry and calm.
DO NOT attempt to assemble your shed in windy weather
because of risk of damage to panels, or personal injury. Be careful
of wet or muddy ground.
Teamwork:
Whenever possible, two or more people should work together to
assemble the building. One person can position parts or panels
while the other is able to handle the fasteners and the tools.
-2-
BEFORE YOU START
Owner's Manual
Prior to installation, it is important that you contact your local government authority to
determine if building approval is required. Study and understand this owner's manual.
Important information and helpful tips will make your construction easier and more
enjoyable.
Assembly instructions
Instructions are supplied in this manual and contain all appropriate information for your
building model. Review all instructions before you begin. During assembly, follow the
step sequence carefully for correct results .Please be aware: this unit takes two people
about one full day to complete.
Parts
Check to be sure that you have all the necessary parts for the building.
Familiarize
yourself
with
the
hardware
and
fasteners
for
easier
use
during
construction. These are packaged within the carton. Note that extra fasteners have been
supplied for your convenience.
TOOLS MAY REQUIRED
Use heavy duty gloves when handling steel sheets and flashing
PLAN AHEAD
Site Selection
l Avoid overhanging trees as much as possible as leaves will make regular cleaning
necessary and broken branches are a potential hazard.
l Small trees,bushes or fences nearby can be helpful,acting as a wind break.
Site Preparation
The site must be prepared so that the base of the shed is level all round and checking
with a spirit level is required.
The base can be constructed by treated timber or concrete,in order to stop the moisture
getting into the shed.The shed is not designed to be built onto lawn directly.Also the
ground will get muddy during rainy days.
If a concrete pad is made,it is important that this slopes towards the edges to prevent
water ingress.
Time must be allowed for any concrete or cement to dry before building the shed on top.
Bases can also be constructed from bricks,blocks,or mounted on a concrete pad.
The bricks or blocks should be cemented onto firm and level concrete footings and the
greenhouse frame drilled and screwed to the base.
IMPORTANT NOTES:
l Find someone to help you:it is much easier with someone to hold parts,pass tools
ect.Also some steps require two people to lift structures together.This is not very
heavy work so would suit most able-bodied people.
l Allow plenty of time:rushing often causes errors and the re-doing of incorrect
assemblies.If you have never built a shed before,it can take most of a day to carefully
complete the construction.
l Have the right tools to hand.
l Safety clothing as recommended in the 'Tools' section.
l Ideally lat out the parts and check that all are present before commencing
construction.Lay on cloths or plastic sheets if there is any risk of scratching the parts.
l Tighten all nuts carefully,being sure not to miss any.Check the frame is square and
using a spirit level to check that it is upright.
PLAN AHEAD
Watch the weather:
Please be sure the day you select for installation is dry and calm.
DO NOT attempt to assemble your shed in windy weather
because of risk of damage to panels, or personal injury. Be careful
of wet or muddy ground.
Teamwork:
Whenever possible, two or more people should work together to
assemble the building. One person can position parts or panels
while the other is able to handle the fasteners and the tools.
sharp edges
3M
1/10"
1/5"
5/16"
when assembling or performing.
wear work gloves, long sleeves and eye glasses,
Pay attention to the sharp edges. Please
1
PART
NO.
Qty.
PART
NO.
Qty.
2
1
1
1
1
1
1
1
2
2
2
1
2
6
1
1
2
2
-3-
2
3L
3R
4L
4R
5
6
7L
9
10
12
16
17
18
19
20
21L
21R
PART
NO.
Qty.
1372mm/54.01"
1800mm/70.86"
574mm/22.59"
830mm/32.67"
876mm/34.48"
1360mm/53.54"
1516mm/59.68"
356mm/14.01"
1365mm/53.74"
960mm/37.79"
456mm/17.95"
1516mm/59.68"
1754mm/69.05"
22
4
23
1
1728mm/68.03"
35
36
37
1
4
2
1
882mm/34.72"
1728mm/68.03"
7R
1
4
2
2
13
14L
14R
1728mm/68.03"
248mm/9.76"
2
26
1580mm/62.2"
1
1360mm/53.54"
27
1
677mm/26.65"
1
29L
29R
3
34
2
33
1614mm/63.54"
24
2
516mm/20.31"
48
1300mm/51.18"
1
9
1
10
1360mm
1516mm/59.68"
1
1
25L
25R
1
28
2
597mm/23.5"
30
1
31
1516mm/59.68"
2
32
470mm/18.5"
1300mm/51.18"
4
38
574mm/22.59"
1728mm/68.03"
882mm/34.72"
248mm/9.76"
1728mm/68.03"
677mm/26.65"
1372mm/54.01"
1728mm/68.03"
1728mm/68.03"
1728mm/68.03"
1360mm/53.54"
1360mm/53.54"
PART
NO.
Qty.
G2
-4-
4
2
GF
GD
GB
GC
GE
4
4
8
2
GS
6
F1
F2
F3
S3
PART
NO.
Qty.
P1
P4
P5
P6
8
1
1
1
450
8
45
396
1314mm/51.73"
986mm/38.81"
F4
10
S2
400
P9
8
P2
8
S4
833mm/32.79"
358mm/14.09"
P7
1
PART
NO.
Qty.
D2
1
D1
1
P11
P12
P13
1
1
1
1642mm64.64"
P14
1
4
P10
6
458mm/18.03"
P16
1
P17
1
P18
1
PART
NO.
Qty.
P15
1
598mm/23.54"
W1
W2
W3
W4
796mm/31.33"
1335mm/52.55"
2
2
4
3
925mm/36.41"
W5
408mm/16.06"
4
#8AB-18x2/13
#8-32x2/13
#8-32x2/13
986mm/38.81"
986mm/38.81"
986mm/38.81"
1642mm64.64"
1642mm64.64"
1642mm64.64"
598mm/23.54"
598mm/23.54"
598mm/23.54"
925mm/36.41"
#10-24x2/13
3R
5
3L
4R
6
7R
7L
4L
9
36
36
36
37
37
P1
P1
P1
P1
P9
P9
P9
P9
P9
P9
P9
P9
P1
P1
P1
P1
22
13
13
18
18
D2
D1
1
9
22
36
1
23
13
20
35
P2
P2
P2
P2
P2
P2
P2
P2
22
22
13
2
21L
21R
14R
14L
16
12
12
14R
14L
21R
21L
29R
29L
34
26
26
27
W5
W5
W5
W5
W4
W4
S4
S4
LEFT EXTENSION
P5
P7
P4
P6
P14
P13
P11
P12
GC
GC
GC
GC
10
10
19
GE
GE
33
17
17
33
-5-
-6-
8
8
8
8
32
32
25L
25R
38
38
24
28
GC
GC
GC
GC
GS
GS
10
30
30
P17
P15
P16
P18
P10
P10
P10
P10
P10
P10
34
34
9
31
24
W4
38
38
B
F1
x
12
3L x
1
3Rx
1
5 x
1
1
x
2
2
x
1
B
B
c
c
D
D
c
1
2
3R
5
3L
D
1
-7-
Base Assembly
1When diagonal measurements are equal,the frame is
square.
2The Floor Frame must be BOTH square AND
level or the holes will not line up properly.
5
3R
3L
1
1
2
-8-
Base Assembly Inspection
-9-
F4x
7
S3
x
7
4R x
1
13
x
1
P9
x
1
P1
x
1
F1
F1
4R
3R
4R
13
P9
P1
Pay attention to dumping
Need a person or a shelf to support.
Wall Panels Installation
Install the parts according below order,4R-13-P9-P1
-10-
F1
x
4
S3
x
4
22x
1
P1
22
F1
22
13
13
x
1
Pay attention to dumping
Need a person or a shelf to support.
-11-
F1
x
8 S3
x
822
x
1
P2
22
23
P2
23x
1
P2
x
2
Pay attention to dumping
Need a person or a shelf to support.
-12-
F1
x
8 S3
x
8
13
x
1
P1
x
1
22
x
2
P1
13
22
22
Pay attention to dumping
Need a person or a shelf to support.
Pay attention to dumping
Need a person or a shelf to support.
-13-
F1
x
13
S3
x
13
13
x
1
P1
x
1
9
P1
P1
9
9
x
1
13
P9
4L
4L
x
1
P9
x
1
Pay attention to dumping
Need a person or a shelf to support.
F1
F1
-14-
F1
x
96 S3
x
96
P1
x
5
9
P1
P9
P9
P1
P1
P1
P1
P2
P2
P2
P2
P2
P2
P2
x
6
P9
x
6
P1
9
P9
P9
P9
P9
9
x
1
Pay attention to dumping
Need a person or a shelf to support.
F4
F4
-15-
21L x
2
21R
x
2
14L x
2
14R
x
2
F2
x
12
GF
x
4
12
x
2
x2
x2
21L
21R
14L
14R
GF
GF
12
12
B3
21L
Back Triangle Panel Installation
-16-
S3
x
8
F1
x
8
9
20
x2
20
x
1
20
-17-
S3
x
10
F1
x
10
G2
x
4
7L
x
1
7R
x
1
7R
7L
7L
7R
6
9
7R
x2
6
7L
7R
4R
21L
21R
6
x
1
G2
x2
7L&7R
Front Trigangle Panel
Installation
16
x
1
16
16
F2
12
F2
12
F2
x
2
-18-
Crossbeam Installation
-19-
13
36
F1
4L
37
23
35
4R
37
35
x
1
36x
4
37
x
2
F1
x
35
S3
x
35
F1
F1
F1
-20-
34
29R
34
29L
29R
W5
W5
W5
W5
W4
S4
S4
W4
29R
W5
W4
W4
S4
F1
F1
x
8
W4 x
2
W5 x
4
S4
x
2
34 x
1
29Lx
1
29Rx
1
Base of Left Storage Assembly
/