Minka Group 4108-84 User manual

Type
User manual

This manual is also suitable for

INSTALLATION INSTRUCTIONS
Item#4108-66/84/172 (New. 2022/12/30)
READ AND SAVE THESE INSTRUCTIONS
W A R N I N G ! S H U T P O W E R O F F AT F U S E O R C I R C U I T B R E A K E R .
AVERTISSEMENT! COUPER LE COURANT AU NIVEAU DES FUSIBLES OU DU DISJONCTEUR.
Fig. 1
Fig. 2
LA-3620E
PREPARATION (Fig. 1)
1. Shut off power at the fuse box or circuit break
er box and
remove the old fixture including the mounting hardware.
2.
Carefully unpack your new fixture and lay out all the parts in a
clean area. Take care not to misplace any small parts
necessary for installation.
ASSEMBLING THE FIXTURE (Fig. 1)
3. Loosen hex nuts (D) by using wrench (J) (not included), then remove
metal washers (E), lock washers (L), metal support plate (I), canopy
(H) and swivels (G).
4. Secure metal tube (M) onto all thread (U) on the fixture body.
5. Determine the desired hanging height and thread rods (F1, F2 and
F3) onto all thread on metal tube (M). Carefully pass wires through
each rod during assembly. Secure swivels (G) onto rods (F1).
6. Align canopy (H) and metal support plate (I) followed by lock washer
(L) and metal washer (E) onto swivels (G) and secure with hex nuts
(D) via Wrench (J) (not included).
7. Position mounting plate (A) on ceiling and mark location of the two
drywall anchors (K). Pre-drill holes for drywall anchors (K). Then
insert drywall anchors (K) into ceiling.
8. Attach mounting plate (A) to junction box (Not included) with
mounting screws (B) (Size: #8-32N*L0.5”) and wood screws (O) into
drywall anchors (K). The side of the mounting plate marked “GND”
must face out.
CONNECTING THE WIRES (Fig. 2)
9. Connect the electrical wires as shown in Fig. 2, making sure that all
wire connectors are secured. If your junction box has a ground wire
(green or bare copper), connect fixture’s ground wire to it. Otherwise,
connect fixture’s ground wire directly to the mounting plate (A) using
green screw provided.
10. Tuck wire connectors neatly inside the junction box.
COMPLETING THE INSTALLATION (Fig. 1)
11. Align canopy (H) onto mounting plate (A) and secure with screws (C).
12. Place large glass shade (T), metal cover (S), small glass shade (R),
metal ring (Q) over the socket (V) in that order. Then secure with
screw shell (P).
13. Install (3) three medium base bulbs (N) up to 100 watts each or CFL
or LED equivalent (not included) in accordance with the fixture
specification. DO NOT EXCEED THE MAXIMUM WATTAGE
RATING! (NE PAS DEPASSER LA PUISSANCE NOMINALE
MAXIMALE!).
Your installation is now complete. Return power to the junction box and
test the fixture.
Note: Illustration (Fig. 1) on this manual is for installation purposes
only. It may or may not be identical to the fixture purchased.
Set# A-021-375118
-Mounting plate
-Ground screw
-Mounting screw *2
Rod# W30-1-66/84/172 *2 (F1)
W30-1-66/84/172 *4 (F2)
W30-H-66/84/172 *2 (F3)
FIXTURE
WIRES
Black or
Smooth
HOUSE
WIRES
Black
(Hot)
FIXTURE
WIRES
White or
Ribbed
HOUSE
WIRES
White
(Neutral)
FIXTURE
WIRES
Bare
Copper
(Ground)
HOUSE
WIRES
Green
(Ground)
G
F3
F2
F1
M
N
P
Q
R
S
T
U
V
I
D
E
L
O
K
H
C
A
B
J
Page: 1/1
  • Page 1 1

Minka Group 4108-84 User manual

Type
User manual
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI