Toro Pressure Switch Kit, TXL 2000 Tool Carrier Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Toro Pressure Switch Kit, TXL 2000 Tool Carrier Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
FormNo.3434-617RevA
PressureSwitchKit
TXL2000ToolCarrier
ModelNo.139-4870—SerialNo.400000000andUp
InstallationInstructions
Installation
LooseParts
Usethechartbelowtoverifythatallpartshavebeenshipped.
Description
Qty.
Use
Nopartsrequired
Preparethemachine.
Replacementpressureswitch1
Teetting(withoutswivelnut)
1
Teetting(withswivelnut)
2
Hose(25inches)
1
Returnhardline1
Elbowtting
1
Straighttting
1
Swiveltting
1
Sequencevalve
1
Hose(20-3/4inches)
1
Hose(15inches)
1
Installthekit.
Nopartsrequired
Completetheinstallation.
Determinetheleftandrightsidesofthemachinefromthenormaloperatingposition.
PreparingtheMachine
1.Removeanyattachments.
2.Parkthemachineonalevelsurface.
3.Ensurethattheloaderarmsaredownonthe
stops.
4.Shutofftheengine,waitforthemachinetocool,
andremovethekey.
5.Relievehydraulicpressurebypressingthe
reverseandforwardowhydraulicsbuttonson
thejoystick.
6.Turnthebattery-disconnectswitchtotheOFF
position(Figure1).
g261512
Figure1
1.Battery-disconnect
switch—OFFposition
2.Battery-disconnect
switch—ONposition
7.Removethetraction-controlplatefromthe
machinebyremovingthe4screwsholdingitin
place(Figure2).
©2019—TheToro®Company
8111LyndaleAvenueSouth
Bloomington,MN55420
Registeratwww.T oro.com.
OriginalInstructions(EN)
PrintedintheUSA
AllRightsReserved
*3434-617*A
Note:Donotdisconnectthetraction-control
wiresandsettheplatetotheside.
g300308
Figure2
1.Traction-controlplate
8.Opentherear-accesscover;refertothe
Operator’sManualforthemachine.
9.Removetherearscreen;refertoOperators
Manualforthemachine.
InstallingtheKit
Important:Youmaydiscardallremovedparts
unlessotherwisenoted.
WARNING
Seekimmediatemedicalattentionifuidis
injectedintoskin.Injecteduidmustbe
surgicallyremovedwithinafewhoursbya
doctor.
Ensurethatallhydraulic-uidhoses
andlinesareingoodconditionandall
hydraulicconnectionsandttingsaretight
beforeapplyingpressuretothehydraulic
system.
Keepyourbodyandhandsawayfrom
pinholeleaksornozzlesthateject
high-pressurehydraulicuid.
Usecardboardorpapertondhydraulic
leaks.
Safelyrelieveallpressureinthehydraulic
systembeforeperforminganyworkonthe
hydraulicsystem.
1.Removetheexistingreturnhoseroutedfromthe
liftvalvetotheauxiliaryvalve(Figure3).
2.Loosentheexistingteettingontheauxiliary
valvetoeaseinstallationofnewreturnhardline.
3.Disconnectthewireharnessfromtheexisting
pressureswitchandremovetheswitchfromthe
teetting.
g300340
Figure3
1.Teettingonauxiliary
valve
3.Existingpressureswitch
2.Returnhose
4.Connecttheteetting(withoutswivelnut)onto
thepressureswitchandkeepitloose.
Important:Ensurethattheteettingside
portpointstotheleftofthepressureswitch
asshowninFigure4.
5.Installthepressureswitch,withtheteetting
connectedtoit,intothepressureswitchtee
ttingandtorqueitto12to15N∙m(9to11ft-lb).
RefertoFigure4.
2
g300341
Figure4
1.Teetting(withoutswivel
nut)
2.Replacementpressure
switch
6.Ensurethattheteettingconnectedtothe
pressureswitchisorientedsothatthesideport
pointstotheleftofthepressureswitchasshown
inFigure4.Torquetheteettingto46to47
N∙m(34to42ft-lb).
7.Removetherightlift-cylinderhosefromtherear
bulkheadtting(Figure5).
g300362
Figure5
1.Rightlift-cylinderhose
8.Connecttheteetting(withswivelnut)onto
therearbulkheadttingandtorqueto37to45
N∙m(27to33ft-lb);refertoFigure6.
Note:Ensurethattheteettingsideportpoints
totherightasshowninFigure6.
9.Installtherightlift-cylinderhosetothebottom
portoftheteettingandtorqueto37to45N∙m
(27to33ft-lb);refertoFigure6.
g300373
Figure6
1.Teetting(withswivelnut)3.Rearbulkheadtting
2.Rightlift-cylinderhose
10.Routethehose(25inches)inaloopfromthetee
ttingontherearlift-cylinderbulkheadtothetee
ttingonthebottomoftheswitchandtorqueit
to37to45N∙m(27to33ft-lb);refertoFigure7.
g300477
Figure7
1.Hose(25inches)
11.Installnewreturnhardlineroutingitfromthelift
valvetotheauxiliaryvalve(Figure8).Torque
theauxiliary-valveendofthehardlineto149
to184N∙m(110to136ft-lb)andtorquethe
lift-valveendto115to142N∙m(85to105ft-lb).
3
Important:Ifyoupreviouslyloosenedthe
teettingontheauxiliaryvalvetoease
installationofthenewreturnhardline,torque
theteettingto164to202N∙m(121to149
ft-lb).
g300487
Figure8
1.Teettingonauxiliary
valve
3.Returnhardline
2.Auxiliary-valveendofthe
hardline
4.Lift-valveendofthe
hardline
12.Installthe3ttingsontothesequencevalve
accordingtoFigure9andtorqueto27to35
N∙m(20to26ft-lb).
g301527
Figure9
1.Elbowtting3.Swiveltting
2.Straighttting
13.Connectthehose(15inches)toport3onthe
sequencevalveasshowninFigure10and
torqueto37to45N∙m(27to33ft-lb).
Important:Ensurethattheelbowtting
ispointeddownwardatapproximately45
degrees.
14.Connectthehose(20-3/4inches)toport1on
thesequencevalveasshowninFigure10and
torqueto37to45N∙m(27to33ft-lb).
Important:Ensurethattheelbowttingis
parallelwiththesequencevalve.
g300520
Figure10
1.Hose,15inches
3.Hose,20-3/4inches
2.Sequencevalve
15.Mountthesequence-valveassembly,port2,to
thehardlinesaddlettingasshowninFigure
11andtorqueto37to45N∙m(27to33ft-lb).
Important:Ensurethatthesequence-valve
assemblyisorientedparalleltothehardline.
16.Connecttheopenendofthe15-inchhoseto
thehorizontalportontheteettingbelowthe
pressureswitch(Figure11).T orqueto37to45
N∙m(27to33ft-lb).
4
g300548
Figure11
1.Hose(15inches)3.Hose(20-3/4inches)
2.Hardlinesaddletting4.Topleftportofthelift-valve
assembly
17.Disconnecttheexistinghosefromthetopleft
portofthelift-valveassembly.
18.Connecttheteetting(withswivelnut)ontothe
lefttopportofthelift-valveassemblyasshown
inFigure12andtorqueto37to45N∙m(27to
33ft-lb).
Important:Ensurethattheteeispointed
downwardatapproximately15degreesto
avoidthehosefrommakingcontactwiththe
intakechute.
19.Reroutethehosepreviouslyremovedfromthe
topleftportofthelift-valveassemblytothe
outsideofthelift-circuithardlines(Figure12)
andtorqueto37to45N∙m(27to33ft-lb).
20.Connecttheopenendofthe20-3/4inchhoseto
theteettingintheliftvalveasshowninFigure
12andtorqueto37to45N∙m(27to33ft-lb).
g300549
Figure12
1.Teetting(withswivelnut)3.Lift-circuithardlines
2.Previouslydisconnected
hose;reroutetooutsideof
lift-circuithardlines
CompletingtheInstallation
1.Installthepreviouslyremovedrearscreen.
2.Closetherear-acesscover.
3.Installthepreviouslyremovedtraction-control
plate.
4.Turnthebattery-disconnectswitchtotheON
position(Figure1).
5.Turnonthemachineandextendthearmstoget
theairoutofthesystem.
6.Checkforleaks.Usecardboardorpaperto
assistinndinghydraulicleaks.
Important:Keepyourbodyandhandsaway
frompinholeleaksornozzlesthateject
high-pressurehydraulicuid.
5
Notes:
Notes:
/